About this project

Hwy 47 project location map.
We will resurface Hwy 47 between Hwy 65 and 27th Ave. NE in Minneapolis. Crews will make ADA improvements, sidewalk improvements, replace guardrail and repair drainage in the project area.
Summary of work
- Repave Hwy 47 between Hwy 65 and just south of 27th Ave. NE
- Reconstruct pedestrian ramps and numerous sections of sidewalks crossings to meet ADA standards
- Replace guardrail
- Repair drainage