  • Partial reconstruction in town between Broadway Avenue and the box culvert work near My Sister’s Place near Third Avenue East is progressing.
  • Traffic in town will be two lane through the end of the season with flagging as needed.
  • All truck traffic will be detoured using County Highway 7 for the duration of the summer.

About this project

MnDOT Project Engineer Ed Welch and Resident Engineer Andrew Deming sat down with Grand Marais Communications Director Patrick Knight and Grand Marais Mayor Jay Arrowsmith-DeCoux to discuss the Grand Marais project. View the interviews below.

Project animation

See a project animation.

Construction staging

Map showing the project staging in 2020 from mid-May through October. Motorists may encounter a short detour, and single lane traffic.

Map showing the project staging in 2020 from mid-May through October. Motorists may encounter a short detour, a longer detour and single lane traffic.

Map showing the project staging in 2020 from mid-May through October. Motorists may encounter a detour and single lane traffic.

Summary of work

  • Reconstruct and resurface Hwy 61 through Grand Marais, improve accessibility, replace box culverts

This map shows the entire project area. The project will reconstruct and resurface Hwy 61 through Grand Marais, improve accessibility, replace box culverts