Project complete

About this project

I-94 and I-35E in St. Paul Project locations map

I-94 and I-35E in St. Paul project location map.

Click map for larger version.

A two-year project to repair and resurface I-94 between Western Ave. and Mounds Blvd. and I-35E between I-94 north and University Ave. began in the summer of 2021. MnDOT also worked on the following ramp bridges:

  • East 12th St. to WB I-94 (over WB I-94)
  • East 12th St. to SB I-35E (over WB I-94)
  • EB I-94 to E 6th St.

In addition, crews resurfaced the Robert St. bridge over I-35E.

The project addressed water seepage issues along the westbound side of I-94 through the project area, built new storm water drainage ponds and replaced railing on some bridges. Freeway lighting and signs were replaced if needed.

Summary of work

  • Repaired and resurfaced I-94 and I-35E
  • Resurfaced ramps and frontage roads along I-94
  • Repaired drainage and upgraded storm sewers
  • Other bridge rehabilitation work
  • Repaired sidewalks and upgraded pedestrian sidewalks and approaches to Americans with Disability Act (ADA) standards