Minnesota Department of Transportation

511 Travel Info

Highway 55

Golden Valley

Traffic impacts

Highway 55 in Golden Valley project location map

Hwy 55 in Golden Valley project location map.

Click map for larger version.

All traffic impacts are tentative and weather dependent.

Current

Lane closures

Wed, July 20 through Fri, Sept. 3; 9 a.m. to 3 p.m. daily
  • Hwy 55 is reduced to one lane in both directions between Hwy 100 and Hwy 169

Upcoming

Information about upcoming traffic impacts will be posted as details become available. Motorists can expect lane closures. Residents may hear noise for trail construction on state property.

Road closures

10 p.m. Fri, Aug. 13 through 5 a.m. Mon, Aug. 16
  • WB Hwy 55 is closed between Hwy 169 and Hwy 100
10 p.m. Fri, Aug. 20 through 5 a.m. Mon, Aug. 23
  • EB Hwy 55 is closed between Hwy 100 and Hwy 169

About this project

Crews will resurface Hwy 55 between General Mills Blvd. and Hwy 100 in Golden Valley. They will also make safety improvements by expanding the size of median islands and enhance accessibility at intersections. Golden Valley is building a trail between Winnetka Ave. and Glenwood Ave.

Summary of work

  • Resurface Hwy 55 between General Mills Blvd. and Hwy 100
  • Improve intersection safety and accessibility
  • Build the start of a trail for the City of Golden Valley between Winnetka Ave. and Glenwood Ave.