All traffic impacts are tentative and weather dependent.

Current

Road closures

9 p.m. Fri, July 8 through 5 a.m. Mon, July 11

Lane closures

Mon, July 11 through August
  • Hwy 36 is reduced to one lane in both directions between I-694 and Stillwater Blvd.

Upcoming

Information about upcoming traffic impacts will be provided as details become available. Motorists can expect weekend directional closures of Hwy 36 from Edgerton St. to I-694 with detours, single lane and directional closures with head-to-head traffic from I-694 to Greeley St. with detours. Motorists can also expect flagging under traffic on frontage road from I-694 to Manning Ave.

Road closures

9 p.m. Fri, July 15 through 5 a.m. Mon, July 18

Lane closures

9 p.m. Fri, July 8 through 5 a.m. Mon, July 11
  • Watch for periodic lane closures on Hwy 36 in both directions between I-694 and Stillwater Blvd.

About this project

A 12-mile stretch of Hwy 36 between Edgerton St. in Ramsey County and Greeley St. in Washington County will undergo a road resurfacing and improvement project in the summer of 2022.

Summary of work

  • Resurface pavement
  • Update pedestrian accessibility
  • Upgrade drainage

Watch the project overview video

Find out how you can be prepared, plan for traffic impacts and closures, and learn about the project by watching the video below.