Design documents
Recommended alternatives and visualizations
General
Cultural Resources
Environmental
Environmental Assessment
Environmental Assessment Appendix B: Technical Memoranda and Reports
- Approach Roadway Concept Development and Screening (September 18, 2012 SEH)
- Bridge 9040 New Structure Alternatives (March 4, 2013 HDR)
- Bridge 9103 Rehabilitation Study, Final Report, Red Wing, Minnesota (August 2013 HDR and Gemini Research)
- Minnesota Approach Alternatives Identification, Evaluation, and Screening (September 8, 2014 SEH)
- New Bridge Location Feasibility Assessment (July 2, 2012 SEH)
- Red Wing Bridge Project - Purpose and Need Minnesota Approach Mobility Issues (March 29, 2014 SEH)
- Red Wing Bridge Project Bridge Concept Report (January 2014 HDR)
- River Bridge Options - Screening Considerations (June 18, 2013 SEH)
- Traffic Analysis Report- Red Wing TH 63 Bridge Project (March 25, 2014 SEH)
- Traffic Noise Analysis Report - Red Wing US 63 Bridge and Approach Roadways (June 2015 HDR)
Preliminary design files