Minnesota Department of Transportation

511 Travel Info

News Release

Sept. 13, 2018

Eastbound I-90 lane closure planned Sept. 19 for Dresbach Bridge drainage repairs

DRESBACH, Minn. – Eastbound Interstate 90 motorists will encounter a lane closure on the Dresbach Bridge on Sept. 19 as Minnesota Department of Transportation bridge workers conduct repairs on the Mississippi River bridge’s drainage system.

The left lane closure on eastbound I-90 will run from 8 a.m. to 4 p.m. MnDOT bridge maintenance workers will be in a snooper vehicle to do the repair work

MnDOT urges motorists to always be attentive, drive with caution, slow down in work zones and never enter a road blocked with barriers or cones.

For real-time traffic and travel information in Minnesota, visit 511mn.org, call 5-1-1 or log on to mndot.gov.

To learn more about MnDOT construction projects and activities in southeastern Minnesota, join its Facebook group at facebook.com/groups/MnDOTsoutheast.

###