Temporary Traffic Control Plan Template Sheets

TTC Template Sheets for Stationary Work Zones

Temporary Traffic Control Plans for MnDOT projects follow a general format of style and information. The Metro TTC Typical Sample Plan below may be used as reference for designing a TTC Plan for a MnDOT project, although each MnDOT District may have slightly different formats developed. The template sheets listed on this page may be added to a TTC Plan as needed for a particular project. The template sheet files (DGN format) may be imported into any TTC plan, but each template must be edited to comply with project specific construction situations. Design notes are included on most template sheets and the designer should use them to make appropriate design considerations. When the final traffic control sheets are placed into the construction plans, all variables should be determined and entered on the sheet(s) directly and all the designer notes and charts should be removed from the sheets.

Please note: the CADD files were created in Microstation Version 7 format; levels, colors and some legend symbols may not be up to current CADD standards. These templates will be updated on a continuous basis. It is recommended that a designer retrieves the most current version of any sheet template before beginning the "Temporary Traffic Control Plan" design process.

Please report any errors or suggested changes to the Work Zone Standards Engineer at traffic.dot@state.mn.us

 

Layout Description

Multi-Lane Divided
Multi-Lane Undivided
Two Lane Two Way
Long Term

3 Days
or Less
Long Term

3 Days
or Less
Long Term

3 days
or Less

Right Lane Closure

DGN

PDF

01

1.26.18

DGN

PDF

24

1.26.18

DGN

PDF

35

1.26.18

DGN

PDF

42

1.26.18

   
Left Lane Closure

DGN

PDF

02

1.26.18

DGN

PDF

25

1.26.18

       
Left Lane Closure
(40 mph or Less)
   

DGN

PDF

36

1.26.18

DGN

PDF

43

1.26.18

   
Left Lane Closure
(45 mph or Greater)
   

DGN

PDF

37

1.26.18

DGN

PDF

44

1.26.18

   
Active Zipper Merge
Right Lane Closure

DGN

PDF

64

1.26.18

 
see No. 64
     
Active Zipper Merge
Left Lane Closure

DGN

PDF

65

1.26.18

 
see No. 65
     

Passive Zipper Merge Right Lane Closure

DGN

PDF

66

1.26.18

         

Passive Zipper Merge Left Lane Closure

 

DGN

PDF

67

1.26.18

         
Right 2 Lanes Closed

DGN

PDF

03

1.26.18

DGN

PDF

26

1.26.18

       
Left 2 Lanes Closed

DGN

PDF

04

1.26.18

DGN

PDF

27

1.26.18

       
Right Lane Closure
Work Beyond Intersection

DGN

PDF

05

1.26.18

DGN

PDF

28

1.26.18

DGN

PDF

38

1.26.18

DGN

PDF

45

1.26.18

   
Left Lane Closure
Work Beyond Intersection

DGN

PDF

06

1.26.18

DGN

PDF

29

1.26.18

DGN

PDF

39

1.26.18

DGN

PDF

46

1.26.18

   
Double Lane Closure    

DGN

PDF

40

1.26.18

DGN

PDF

48

1.26.18

   
Double Lane Closure
at Intersection
   

DGN

PDF

41

1.26.18

DGN

PDF

47

1.26.18

   
Right Turn Lane Closure

DGN

PDF

07

1.26.18

 
see No. 07
     
Left Turn Lane Closure

DGN

PDF

08

1.26.18

         
Shoulder / Parking Lane Closure

DGN

PDF

09

1.26.18

 
see No. 09
 
see No. 09
 
Right Lane Closed
Exit Ramp Open

DGN

PDF

10

1.26.18

DGN

PDF

30

1.26.18

       
Right Lane Closed
Entrance Ramp Open

DGN

PDF

11

1.26.18

DGN

PDF

31

1.26.18

       
Left Lane Closed
Entrance Ramp Open

DGN

PDF

12

1.26.18

DGN

PDF

32

1.26.18

       
Exit Ramp Closed
 

DGN

PDF

63

1.26.18

 
see No. 63
   
Two Lane Two Way Operation
One Side of a Divided Roadway

DGN

PDF

13

1.26.18

         
Two Lane Two Way Operation
at Ramps on Open Roadway

DGN

PDF

14

1.26.18

         
Two Lane Two Way Operation at Exit Across Closed Roadway

DGN

PDF

15

1.26.18

         
Two Lane Two Way Operation at Ent. Across Closed Roadway

DGN

PDF

15A

1.26.18

         
Emergency Pull Off
Emergency X-Over Closure
Object Marker Installation

DGN

PDF

16

1.26.18

         
Multiple Lane Shift

DGN

PDF

17

1.26.18

         
Single Lane Shift

DGN

PDF

17A

1.26.18

         

Bump Signing

DGN

PDF

18

1.26.18

 
see No. 18
 
see No. 18
 
Portable Concrete Barrier

DGN

PDF

19

1.26.18

 
see No. 19
 
see No. 19
 
Typical Temporary Sign Farming and Installation Details

DGN

PDF

20

1.26.18

 
see No. 20
 
see No. 20
 
Typical Temporary Sign Covering Details

 

DGN

PDF

20A

1.26.18

         

DGN

PDF

21

1.26.18

 
see No. 21
 
see No. 21
 
Traffic Control Title Sheet

DGN

PDF

22

2.16.18

 
see No. 22
 
see No. 22
 
Traffic Control
Tabulation Sheet

DGN

PDF

23

1.26.18

 
see No. 23
 
see No. 23
 
Road Closed at Interchange
 

DGN

PDF

33

1.26.18

       
Milled Roadway Surface
Work Before and Through Intersection
 

DGN

PDF

34

1.26.18

       
Work Occupies 1/2 of Road
(40 mph or Less)
       

DGN

PDF

49

1.26.18

DGN

PDF

55

1.26.18

Lane Closure
with Flaggers
         

DGN

PDF

56

1.26.18

Lane Closure
with STOP signs

       

DGN

PDF

50

1.26.18

DGN

PDF

57

1.26.18

Lane Closure
with Signals
       

DGN

PDF

51

1.26.18

DGN

PDF

58

1.26.18

Lane Closure
with Pilot Car Operation
         

DGN

PDF

60

1.26.18

Lane Closure w/ Shifted Approach - Pilot Car Operation
         

DGN

PDF

61

1.26.18

Road Closure
with Diversion (By-pass)

DGN

PDF

62

1.26.18

     

DGN

PDF

52

1.26.18

 
Typical Signing
for Road Closure
       

DGN

PDF

53

1.26.18

see No. 53
Work in Center of Road
         

DGN

PDF

54

1.26.18

 

 

Gravel Conditions

 

         

DGN

PDF

59

1.26.18

 

Work Zone Speed Reduction

 

DGN

PDF

68

3.10.15

see No. 68
see No. 68
see No. 68
see No. 68
see No. 68

 

Temporary Raised Rumble Strips

 

DGN

PDF

69

1.26.18

see No. 69
see No. 69
see No. 69
see No. 69
see No. 69

Lane Closure Extension

DGN

PDF

70

1.26.18

         

TPAR Layouts & Devices

DGN

PDF

71

3.30.18