TTC Template Sheets for Stationary Work Zones
Temporary Traffic Control Plans for MnDOT projects follow a general format of style and information. The Metro TTC Typical Sample Plan (linked below) may be used as reference for designing a TTC Plan for a MnDOT project, although each MnDOT District may have slightly different formats developed. The template sheets listed on this page may be added to a TTC Plan as needed for a particular project. The template sheet files (DGN format) may be imported into any TTC plan, but each template must be edited to comply with project specific construction situations. DESIGN NOTES are included on most template sheets and the designer should use them to make appropriate design considerations. When the final traffic control sheets are placed into the construction plans, all variables should be determined and entered on the sheet(s) directly and all the designer notes and charts should be removed from the sheets.
Downloadable files
PLEASE NOTE: the CADD files were created in Microstation Version 7 format; levels, colors and some legend symbols may not be up to current CADD standards. These templates will be updated on a continuous basis. It is recommended that a designer retrieves the most current version of any sheet template before beginning the "Temporary Traffic Control Plan" design process.
- Files available in Microstation format (DGN) or Adobe Reader format (PDF)
- The latest sheet revision date (MM.DD.YY) is shown below the download buttons
- The layout reference number is shown above the date
- Please report any errors or suggested changes to the Work Zone Standards Engineer at traffic.dot@state.mn.us
Layout Description |
Multi-Lane Divided |
Mutli-Lane Un-Divided |
Two Lane Two Way |
|||
Long Term |
3 Days or Less |
Long Term |
3 Days or Less |
Long Term |
3 days or Less |
|
|
METRO
TTC Typical Plan (see below) |
||||||
Right
Lane Closure |
||||||
Left Lane Closure |
. |
. |
. |
. |
||
Left
Lane Closure (40 mph or Less) |
. |
. |
. |
. |
||
Left
Lane Closure (45 mph or Greater) |
. |
. |
. |
. |
||
Dynamic
Late Merge Right Lane Closure |
see No. 64 |
|||||
Dynamic
Late Merge Left Lane Closure |
see No. 65 |
|||||
Right
2 Lanes Closed |
. |
. |
. |
. |
||
Left
2 Lanes Closed |
. |
. |
. |
. |
||
Right
Lane Closure Work Beyond Intersection |
. |
. |
||||
Left
Lane Closure Work Beyond Intersection |
. |
. |
||||
Double
Lane Closure |
. |
. |
. |
. |
||
Double
Lane Closure at Intersection |
. |
. |
. |
. |
||
Right
Turn Lane Closure |
. |
see No. 07 |
. |
. |
. |
|
Left
Turn Lane Closure |
. |
. |
. |
. |
. |
|
Shoulder
/ Parking Lane Closure |
. |
see No. 09 |
. |
see No. 09 |
. |
|
Right
Lane Closed Exit Ramp Open |
. |
. |
. |
. |
||
Right
Lane Closed Entrance Ramp Open |
. |
. |
. |
. |
||
Left
Lane Closed Entrance Ramp Open |
. |
. |
. |
. |
||
Exit
Ramp Closed |
see No. 63 |
|||||
Two Lane
Two Way Operation One Side of a Divided Roadway |
. |
. |
. |
|||
Two Lane
Two Way Operation at Ramps on Open Roadway |
. |
. |
. |
. |
. |
|
Two Lane
Two Way Operation at Exit Across Closed Roadway |
. |
. |
. |
. |
. |
|
Two Lane
Two Way Operation at Ent. Across Closed Roadway |
||||||
Emergency
Pull Off Emergency X-Over Closure Object Marker Installation |
. |
. |
. |
. |
. |
|
Multiple
lane Shift |
. |
. |
. |
. |
. |
|
Bump
Signing |
. |
see No. 18 |
. |
see No. 18 |
. |
|
Portable
Concrete Barrier |
. |
see No. 19 |
. |
see No. 19 |
. |
|
Barrel
Attenuator Placement |
see No. 19A |
see No. 19A |
||||
Sign
Framing and Installation Details |
. |
see No. 20 |
. |
see No. 20 |
. |
|
Interim
Pavement Marking Temporary Raised Pavement Markers |
. |
see No. 21 |
. |
see No. 21 |
. |
|
Traffic
Control Title Sheet |
. |
see No. 22 |
. |
see No. 22 |
. |
|
Traffic
Control Tabulation Sheet |
. |
see No. 23 |
. |
see No. 23 |
. |
|
Road
Closed at Interchange |
. |
. |
. |
. |
. |
|
Milled
Roadway Surface Work Before and Through Intersection |
. |
. |
. |
. |
. |
|
Work
Occupies 1/2 of Road (40 mph or Less) |
. |
. |
. |
. |
||
Lane
Closure with Flaggers |
. |
. |
. |
. |
. |
|
Lane Closure |
. |
. |
. |
. |
||
Lane
Closure with Signals |
. |
. |
. |
. |
||
Lane
Closure with Pilot Car Operation |
||||||
Lane
Closure w/ Shifted Approach - Pilot Car Operation |
||||||
Road
Closure with Diversion (By-pass) |
. |
. |
. |
. |
||
Typical
Signing for Road Closure |
. |
. |
. |
. |
see No. 53 |
|
Work
in Center of Road |
. |
. |
. |
. |
. |
|
Gravel
Conditions |
. |
. |
. |
. |
. |
|
| . | ||||||
Legend Sheets
(.DGN) |
. | |||||
Layout CELL file
(.CEL) |
||||||
METRO
TTC Typicals |
12.5.11 | Note: variations of these typical pages may be found above |
||||