Construction completed in 2015

Completed projects on Minnesota highways, updated Dec. 16, 2015

Know your region? Make this list a little shorter by selecting a region below or from the map.








District Offices MnDOT District 7 - Mankato/Windom Metro District - St Paul/Minneapolis MnDOT District 8 - Marshall/Wilmar/Hutchinson MnDOT District 1 - Duluth/Virginia MnDOT District 4 - Detroit Lakes/Morris MnDOT District 2 - Bemidji/Crookston MnDOT District 3 - Baxter/St Cloud MnDOT District 6 - Rochester/Owatonna

Hwys 1–9

Hwy 1

COMPLETE: Hwy 1 from 11 miles east of Hwy 32 in Thief River Falls

Description: Replace Bridge #369 with box culvert

Construction Dates: May-June 2015

Traffic Impacts: Detour

Hwy 2

COMPLETE: Hwy 2 Bong Bridge in Duluth

Description: Replace expansion joints, resurface bridge deck and sidewalks, paint

Construction Dates: March 2014-Nov 2015

Traffic Impacts:  Detours - eastbound detoured in 2015

More Information: http://projects.511wi.gov/us2bongbridge/

COMPLETE: Hwy 2 in Duluth

Description: Repair three ramps

Construction Dates: May 2014 - Oct 2015

Traffic Impacts: Detours - eastbound detoured in 2015

More Information: mndot.gov/d1/archive/Hwy2i35bridges/

COMPLETE: Hwy 2 from Cass Lake to Deer River

Description: Construct passing lanes, turn lanes, bypass lanes, and culverts.

Construction Dates: Spring to Summer 2015

Traffic Impacts: Lane shifts, lane closures with pilot car

More Information: mndot.gov/d2/projects/hwy2passinglanes/

COMPLETE: Hwy 2 east of Fosston

Description: Resurfacing.

Construction Dates: May 11 to July 2015

Traffic Impacts: Single lane, head-to-head traffic

COMPLETE: Hwy 2 Groveland Ave to N Pine St in Crookston

Description: Repair slide area near Red Lake River

Construction Dates: Spring to Summer 2015

Traffic Impacts: Variable, possible lane closures

COMPLETE: Hwy 2 from MN/ND border in East Grand Forks

Description: Repair/ replace the Sorlie Bridge

Construction Dates: May–Sept 2015

Traffic Impacts: Lane closures

COMPLETE: Hwy 2 from Old Housing Dr. to Cass Lake County Road 8 adjacent to Hwy 2 in Bena

Description: Construct multi-use pedestrian and bike trail

Construction Dates: Summer 2015

Traffic Impacts: Minimal

COMPLETE: Hwy 2 from Cass Lake to Deer River

Description: Install centerline rumble strips

Construction Dates: May 11 - Fall 2015

Traffic Impacts: Short-term delays, flagging operations

COMPLETE: Hwy 2, 89: West of Bemidji

Description: New bridge, turn lanes

Construction Dates: July - Fall 2015

Traffic Impacts: Lane closures, single short-term detour when bridge beams set

Hwy 4

COMPLETE: Hwy 4 southwest of Sauk Centre

Description: Replace bridge over the Sauk River one mile south of I-94

Construction Dates: June 1 - Sept. 4, 2015

Traffic Impacts: Detour lifted.

More Information: mndot.gov/d3/newsrels/15/5/28_hwy4.html

Hwy 4 over E fork of Des Moines River, South of Sherburn

Description: Replace bridges

Construction Dates: June-Oct 2015

Traffic Impacts: Detour

Hwy 5 in the Twin Cities Metro

COMPLETE: Hwy 5 at I-494 Mpls/St. Paul International Airport

Description: Replace shoulder.

Construction Dates: 2015, dates TBD

Traffic Impacts: Shoulder closure, off-peak lane closures

COMPLETE: Hwy 5 in Norwood Young America, Victoria and Waconia

Description: A series of state and city work that includes constructing turn lanes, improving drainage, widening and resurfacing the highway.

Construction Dates: July 2014-Fall 2015

Traffic Impacts: Lane and road closures with detours

More information: mndot.gov/metro/projects/5waconia/

COMPLETE: Hwy 5 in Eden Prairie

Description: Resurfacing Hwy 5, improving accessibility and installing guardrail.

Construction Dates: July 2015-October 2015

More information: mndot.gov/metro/projects/hwy5edenprairie/

COMPLETE: Hwy 5 in Bloomington to Hwy 55 in Mpls

Description: Install Cable Median Barrier.

Construction dates: Mid-Sept. - early Nov. 2015

Traffic impacts: Off-peak lane closures

Hwy 5 in Greater Minnesota

COMPLETE: Hwy 5, 19, 22 Gaylord

Description: Reconstruct urban areas.

Construction Dates: May-Nov 2015

Traffic Impact: Detour

Hwy 6

COMPLETE: Hwy 6 Crosby

Description: Upgrade pedestrian crossings
Construction Dates: May - June 2015
Traffic Impacts: Possible short-term shoulder or lane closures

Hwy 8 in the Twin Cities Metro

COMPLETE: Hwy 8 Forest Lake to Center City

Description: Seal cracked pavement

Construction Dates: Summer-Fall 2015

Traffic Impacts: Off-peak lane closures

Hwy 9

COMPLETE: Hwy 9 from Borup to Beltrami

Description: Overlay on five bridges

Construction Dates: Spring - July 2015

Traffic Impacts: Staged detours

COMPLETE: Hwy 9 from Doran to Hwy 55

Description: Resurface, improve pedestrian accessibility - also includes work on hwys 28 and 55

Construction Dates: April-August 2015

Traffic Impacts: Lane and sidewalk closures

More Information mndot.gov/d4/projects/morrisarea/

COMPLETE: Hwy 9 from I-94 to Hwy 10

Description: Seal coat - also includes work on hwys 55 and 75

Construction Dates: Summer 2015

Traffic Impacts: Lane closures

COMPLETE: Hwy 9 from Wilkin CR 182 to Barnesville

Description: Seal coat - also includes work on Hwy 108

Construction Dates: TBD

Traffic Impacts: Lane closures

COMPLETE: Hwy 9 from Herman to Morris

Description: Resurface, improve pedestrian accessibility

Construction Dates: April-August 2015

Traffic Impacts: Lane and sidewalk closures

More Information mndot.gov/d4/projects/morrisarea/

Hwys 10–19

Hwy 10 in the Twin Cities Metro

COMPLETE: Hwy 10 Alpaca St NW to Traprock St NW in Ramsey

Description: Close access, construct frontage road

Construction Dates: 2014-2015

Traffic Impacts: No impacts expected

COMPLETE: Hwy 10 at Feldspar St in Ramsey

Description: Close access to prevent left turns from Feldspar to Hwy 10

Construction Dates: June- July 2015

Traffic Impacts: Feldspar Street crossover at Hwy 10 was closed, short-term lane closures

More Information: mndot.gov/metro/projects/hwy10ramsey/

COMPLETE: Hwy 10 in Blaine, Coon Rapids

Description: Resurface road

Construction Dates: Mid-May to July 31, 2015

Traffic Impacts: Lane Closures

COMPLETE: Hwy 10 in Mounds View, Blaine

Description: Install cable median barriers

Construction Dates: June- mid-July 2015

Traffic Impacts: Shoulder and lane closures

COMPLETE: Hwy 10 in Mounds View, Spring Lake Park

Description: Seal cracked pavement

Construction Dates: Tentatively Summer- Fall 2015, dates TBD

Traffic Impacts: Off-peak lane closures

COMPLETE: Hwy 10, 47 in Coon Rapids

Description: Resurface

Construction Dates: Mid-May to July 31, 2015

Traffic Impacts: Lane Closures

COMPLETE: Hwy 10 from I-35W to Co Rd 96 in Arden Hills

Description: Construct right turn lane and acceleration lane on eastbound road

Construction Dates: Oct. 26, 2015 to early November

Traffic Impacts: Non rush hour lane closures

Hwy 10 in Greater Minnesota

COMPLETE: Hwy 10 north of Sartell

Description: Resurface segments of Hwy 10 between CR 4 in Watab to CR 40/Halfway Crossing north of Rice.

Construction Dates: Oct. 7 - early Nov. 2015

Traffic Impacts: Lane closures

More information: mndot.gov/d3/newsrels/15/09/30hwy10.html

COMPLETE: Hwy 10 Big Lake to Elk River

Description: Install high-tension cable median guard rail

Construction Dates: July-Aug 2015

Traffic Impacts: Shoulder closures, potential lane closures

COMPLETE: Hwy 10 St. Cloud and Sauk Rapids

Description: Resurface, improve Hwy 10 E of W St Germain St to County Road 33

Construction Dates: April-July 2015

Traffic Impacts: July 2015 - Periodic lane, ramp or shoulder closures as project wraps up.

More Information: mndot.gov/d3/stc/

COMPLETE: Hwy 10 St. Cloud to Clear Lake

Description: Resurface 5 miles of eastbound Hwy 10

Construction Dates: May 11 - July 1, 2015

Traffic Impacts: Eastbound Hwy 10 reduced to single lane during non-rush hours
More information: mndot.gov/d3/newsrels/15/4/29_hwy10.html

COMPLETE FOR SEASON: Hwy 10/Hwy 59 and Frontage Road in Detroit Lakes

Description: Resurface Hwy 10 from Airport Rd to Hwy 59, reconstruct frontage road along Hwy 10, construct bridge on Hwy 59

Construction Dates: May 2015 to July 2016. Work will resume on frontage road in 2016

More information: mndot.gov/d4/projects/dlfrontageroad

COMPLETE: Hwy 10 near Lake Park

Description: Replace culverts

Construction Dates: September -October 2015

Traffic Impacts: Lane closures

COMPLETE: Hwy 10/County Rd 23 in Becker

Description: Install a Rural Intersection Conflict Warning System

Construction Dates: Summer/Fall 2015

Traffic Impacts: Possible lane or shoulder closures

More information: mndot.gov/trafficeng/signals/conflictwarning.html

Hwy 11

COMPLETE: Hwy 11 in Warroad

Description: Resurface road

Construction Dates: September 2015

Traffic Impacts: Single lane, flagger and pilot car

COMPLETE: Hwy 11 International Falls to Dove Island in Koochiching County

Description: Resurface road, replace culvert, turn lanes

Construction Dates: June-Oct. 9, 2015

Traffic Impacts: Single-lane and shoulder closures

More Information: mndot.gov/d1/archive/Hwy11-3606-57

COMPLETE: Hwy 11 Roseau County Road 15 to E Hwy 89 in Roseau

Description: Resurface road; extend one end of bridge

Construction Dates: July 6–Labor Day 2015

Traffic Impacts: Detours

More Information: mndot.gov/d2/projects/hwy11roseau

Hwy 12

COMPLETE: Hwy 12 in Wayzata and Minnetonka

Description: Construct auxiliary lane, drainage, guardrail

Construction Dates: Aug 2015- Nov 2015

Traffic Impacts: Ramp closure, off-peak lane closures, narrowed lanes

More Information: mndot.gov/metro/projects/hwy12wayzata

COMPLETE: Hwy 12, 25 intersection east of Montrose, south of Buffalo

Description: Construct intersection improvements at the east junction of Hwy12/25. Install a Continuous T Intersection with signal system and turn lanes

Construction Dates: July 7-early Oct, 2015

Traffic Impacts:

  • Hwy 12 - Lane and shoulder closures with narrow lanes and reduced speeds
  • Hwy 25 - Close and detour via CR 12 from Montrose to Buffalo

More Information: mndot.gov/d3/buffalo/

COMPLETE: Hwy 12 Atwater to Litchfield

Description: Reconstruct/resurface

Traffic Impacts: Detour

More Information: mndot.gov/d8/projects/hwy12-atwater-litchfield/

COMPLETE: Hwy 12 Swift & Kandiyohi Counties, from 0.2 mile east of CR 6 in Kerkhoven to 0.5 mile east of CR 1 in Pennock

Description: Resurface

Construction Dates: May-July 2015

Traffic Impacts: Detour

More Information: mndot.gov/d8/projects/Hwy 12-Kerkhoven-Pennock/

COMPLETE: Hwy 12 West side of Willmar; from Industrial Drive to 11th Street

Description: Resurfacing bridge and approaches [Bridge No. 5526 - over railroad]

Construction Dates: Aug-Sept 2015

Traffic Impacts: Temporary signal system

More Information: mndot.gov/d8/projects/hwy12bridge

Hwy 13

COMPLETE: Hwy 13 from I-35E in Lilydale to Second Street in Mendota

Description: Resurfacing, signal, drainage, pedestrian and trail improvements

Construction Dates: June 2015-early Nov. 2015

Traffic Impacts: Lane closures, road closure

More Information: mndot.gov/metro/projects/hwy13mendota/

Hwy 14

COMPLETE: Hwy 14 in Owatonna from Hwy 218 to Steele County Rd 180

Description: Expand highway to 4 lanes

Construction Dates: May - Sept 2015

Traffic Impacts: Short-term detour, shoulder closures, lane shifts, bypass

More Information: mndot.gov/d6/projects/hwy14-218-to-cr-180/

COMPLETE: Hwy 14—between Owatonna and Dodge Center

Description: Expansion

Construction Dates: July - Sept 2015

Status: Study completed 2010. Segment 1 construction underway. Single-lane traffic in each direction, short-term ramp detour

More information: mndot/gov/d6/projects/hwy14/

COMPLETE: Hwy 14 Owatonna

Description: Repair concrete pavement on Old Hwy 14 west and east of junction of I-35

Status: May - Aug 2015

Traffic Impacts: Long-term lane closures, delays

More information: mndot/gov/d6/projects/hwy14/

COMPLETE: Hwy 14 (Old Hwy) — Janesville to Owatonna

Description: Restore rural section

Status: April-Oct 2015

Traffic Impacts: Detour

More information: mndot/gov/d6/projects/hwy14/

COMPLETE: Hwy 14/Hwy 42 in Eyota

Description: Construct roundabout at intersection of Hwy 14 and Hwy 42

Status: May - July 2015

More information mndot/gov/d6/projects/hwy14-42-roundabout/

COMPLETE: Hwy 14 N Mankato - Lookout Drive ramps

Description: Repair roundabouts, bridge and ramp

Status: June-Oct 2015

Traffic Impacts: Short detour, delays

COMPLETE: Hwy 14 from Florence to Tracy

Description: Mitigate flooding west of Florence

Construction Dates: May 2014-June 2, 2015

More Information: mndot.gov/d8/projects/hwy14florence/

Hwy 15

COMPLETE: Hwy 15 south of Kimball

Description: Resurface 2 miles of Hwy 15 Kingston Rd to Linden Ave E

Construction Dates: Sept 2015

Traffic Impacts: Lane closures, flaggers

COMPLETE: Hwy 15 Winthrop to Brownton

Description: Resurface; culvert replacement

Construction Dates: July-Sept 2015

More information: mndot.gov/d8/projects/hwy15-winthrop-brownton

COMPLETE: Hwy 15 near Hutchinson

Description: Resurfacing

Construction Dates: August 2015

Traffic Impacts: Lane closures

More information: mndot.gov/d8/projects/hwy15hutchinson/

COMPLETE: Hwy 15 Hutchinson to Dassel

Description: Resurfacing

Construction Dates: July 2015

Traffic Impacts: Lane closures

More information: mndot.gov/d8/projects/hwy15hutchtodassel/

Hwy 16

COMPLETE for 2015: Hwy 16 from 1.5 miles south of Lanesboro

Description: Inspiration Point historic wayside rest restoration

Status: Summer 2015 - minor work will continue in 2016

Hwy 19

COMPLETE: Hwy 19, 22, 5 Gaylord

Description: Reconstruct urban areas.

Construction Dates: May-Nov 2015

Traffic Impact: Detour

COMPLETE for 2015: Hwy 19 North of Carleton College in Northfield

Description: Repair historic stone arch bridge

Status: May - Sept. 2015

Traffic Impacts: Minor work will continue in 2016

More information: mndot.gov/d6/projects/hwy19-historic-bridge/

COMPLETE: Hwy 19 Winthrop

Description: Reconstruct sidewalks for accessibility

Status: May-June 2015

Traffic Impacts: Parking/sidewalk restrictions

COMPLETE: Hwy 19 from Hwy 23 to Bruce Street in Marshall

Description: Resurface

Status: May-June 2015

Traffic Impacts: Lane closures

More information: mndot.gov/d8/projects/hwy59marshall/

Hwys 20–29

Hwy 22

COMPLETE: Hwy 22, 5 and 19 Gaylord

Description: Reconstruct urban areas.

Construction Dates: May-Nov 2015

Traffic Impact: Detour

COMPLETE: Hwy 22 in St. Peter

Description: Raise and reconstruct roadway to maintain traffic during high water events

Construction Dates: July - Oct 2015

More Information: mndot.gov/d7/projects/floodmitigation/

Hwy 23

COMPLETE: Hwy 23 from 0.1 miles northeast of Duquette, 15.9 miles northeast of S. Carlton county line, 9.5 miles NE of the S Carlton County line, at the St. Louis River

Description: Multiple activities

Construction Dates: Summer 2015

Traffic Impacts: Possible shoulder closures through Oct. 9, 2015

More Information: mndot.gov/d1/projects/hwy23-carlton-pine-st-louis-county/

COMPLETE: Hwy 23 Cold Spring

Description: Install Rural Intersection Conflict Warning System at Hwy 23/CR 158 intersection

Construction Dates: Fall 2015

Traffic Impacts: Shoulder closures

More Information: mndot.gov/trafficeng/signals/conflictwarning.html

COMPLETE: Hwy 23 at Saratoga Street in Marshall

Description: Hwy 23/Saratoga Street intersection safety improvements. Project led by City of Marshall.

Status: July-November 2015

Contact: Ryan Barney (MnDOT District 8), Glenn Olson (City of Marshall)

More information: mndot.gov/d8/projects/hwy23saratoga

COMPLETE: Hwy 23 Paynesville Bypass

Description: Landscape

Status: May - June 2015

Traffic Impacts: None

More information: mndot.gov/d8/projects/hwy23bypass

COMPLETE: Hwy 23 to Wood Lake

Description: Resurface (overlay)

Status: October - November 2015

Traffic Impacts: Temporary lane closures

Hwy 25

COMPLETE: Hwy 25 south of I-94 in Monticello

Description: Road improvements. Resurface or reconstruct 2.5 miles roadway. Includes to expand two-lane segment to four-lanes, upgrade pedestrian and motorist accesses and signals, install new sidewalks and reconstruct the intersection at CR 106/85th St NE and install a new signal.

Construction Dates: Late April – Sept 2015

Traffic Impacts: All lanes open, new Hwy 25 signal at County Rd 106 & 85th St NE is fully operational.

More Information: mndot.gov/d3/monti/

COMPLETE: Hwy 25 Becker

Description: Resurface 12.5 miles of Hwy 25 from Hwy 10 in Becker north to Hwy 95

Construction Dates: July-Aug 2015

Traffic Impacts: Hwy 25 reduced to single lane, flaggers, pilot car

Hwy 26

COMPLETE: Hwy 26 in 1 mile south of Brownsville

Description: Replace bridge

Construction Dates: May - Nov 2015

Traffic Impacts: Single-lane traffic with portable signal on temporary bridge

Hwy 27

COMPLETE: Hwy 27 Little Falls

Description: Upgrade pedestrian crossings west of Mississippi River to Pine Grove Park area

Construction Dates: May - June 2015

Traffic Impacts: Possible short-term shoulder or lane closures

Hwy 28

COMPLETE: Hwy 28 Sauk Centre to north of Swanville

Description: Microsurface road

Status: May 20 to mid-June 2015

Traffic Impacts: Hwy 28 single lane with flaggers, pilot car during daylight hours, Monday-Saturdays on good weather days
More information: mndot.gov/d3/newsrels/15/5/15_hwy28.html

COMPLETE: Hwy 28 near Alberta

Description: Resurface, improve pedestrian accessibility - also includes work on hwys 9 and 55

Construction Dates: April-August 2015

Traffic Impacts: Lane and sidewalk closures

More Information: mndot.gov/d4/projects/morrisarea/

Hwy 29

COMPLETE: Hwy 29 from 0.51 miles north of Hwy 7 in Montevideo to Hwy 40

Description: Resurface

Status: May-June 2015

Traffic Impacts: Lane closures

Hwys 30-39

Hwy 30

COMPLETE: Hwy 30 from West junction of Hwy 23 in Pipestone to Lake Wilson

Description: Resurface

Construction Dates: July-Aug 2015

Traffic Impacts: Lane closures

More Information: mndot.gov/d8/projects/hwy30/

Hwy 32

COMPLETE:Hwy 32 from north city limits of Thief River Falls to north city limits of Middle River

Description: Resurface road, add turn lanes, pedestrian ramp. Replace six box culverts and multiple centerline entrance culverts. Urban reconstruction in the city of Middle River.

Construction Dates: May–Sept 2015

Traffic Impacts: Detours
More Information: mndot.gov/d2/projects/hwy32thief-river-falls/

Hwy 34

COMPLETE: Hwy 34 from Detroit Lakes to Akeley

Description: Construct passing lanes and improve intersections along 12 miles of the 57-mile corridor

Construction Dates: Aug 2014-Oct 2015

Traffic Impacts: Lane closures

COMPLETE: Hwy 34 from Barnesville to Hwy 59 at Dunvilla

Description: Resurface 19 miles of Hwy 34, replace culverts

Construction Dates: April 20 - July 2015

Traffic Impacts: Detour

More Information: mndot.gov/d4/projects/hwy34resurface/

COMPLETE: Hwy 34 from Akeley to Walker and from Osage to Park Rapids

Description: Install centerline rumble strips

Construction dates: TBD

Traffic impacts: Short-term delays, flagging operations

I-35 in the Twin Cities Metro

COMPLETE: I-35 in Harris

Description: Resurface road

Construction Dates: Summer 2015-Fall 2015

Traffic Impacts: Off-peak lane closures

I-35 in Greater Minnesota

COMPLETE: I-35 in Duluth

Description: Reconstruct Northwest Passage Skyway over I-35.

Construction Dates: Check Duluth Transit Authority project site below for exact dates

Traffic Impacts: Lane closures
More Information: This is a Duluth Transit Authority Project - visit www.duluthtransit.com/misc/multimodal

COMPLETE: I-35 Half mile north of Hwy 30 to I-90

Description: Repave concrete southbound lanes

Construction Dates: May-Oct. 1, 2015

COMPLETE: I-35 in Owatonna

Description: Reconstruct northbound and southbound pavement and replace 4 bridges

Construction Dates: May 2014-Nov 2015

More Information: mndot.gov/d6/projects/i35bridge-pavement-replacement

COMPLETE: I-35 Rice County

Description: Connecting Intelligent Transportation System. Rice County Rd 1 north to Elko interchange, exit 76

Construction Dates: May-Nov 2015

Traffic Impacts: None

COMPLETE: I-35 in Hinckley

Description: Resurface roadway

Construction Dates: Sept 8 - Oct 9, 2015

Traffic Impacts: Daytime lane closures
More Information: mndot.gov/d1/archive/I-35Hinckley/

I-35E

COMPLETE: I-35E Corridor – Little Canada to St. Paul

Description: Bridge replacement

Construction dates: May 2014-2015

Traffic impacts: Lane closures, possible traffic shifts and 60-day closure of Maryland Ave

More information: mndot.gov/metro/projects/35estpaul

I-35W

COMPLETE: I-35W 4th St S entrance ramp to northbound I-35W in Mpls

Description: Constructed ramp at 4th St S to NB I-35W, added auxiliary lane, reconstructed exit ramps to Stinson Blvd/New Brighton Blvd and Johnson St NE (Hennepin County led project)

Construction Dates: Spring 2014-early spring 2015

Traffic Impacts: Significant traffic impacts, lane closures and detours expected

More Information: mndot.gov/metro/projects/i35wandfourthst

COMPLETE: I-35W and County Road 96

Description: Project led by Ramsey County will include replacing bridge, reconfiguring interchange, working on roadway approach

Construction Dates: June - mid November

More Information: mndot.gov/metro/projects/cr96overi35wardenhills/

COMPLETE: I-35W and County Road F

Description: Replace County Road F bridge

Construction Dates: Late July 2015 through Nov. 2015

More Information: mndot.gov/metro/projects/crfoveri35wnewbrighton/

COMPLETE: I-35W from Hwy 36 in Roseville to Lexington Ave in Blaine

Description: Install ITS vehicle detection system

Construction Dates: May-late Nov. 2015

Traffic Impacts: Temporary shoulder closures

Hwy 36

COMPLETE:Hwy 36 at Hilton Trail in Pine Springs

Description: Landscape

Construction Dates: Spring - July 2015

Traffic Impacts: Shoulder closures

COMPLETE: Hwy 36 in Maplewood, North St. Paul

Description: Install traffic management system

Construction Dates: April - Aug 2015

Traffic Impacts: Lane closures

Hwys 40-59

Hwy 41 in the Twin Cities Metro

COMPLETE: Hwy 41 from Chaska to Louisville Township

Description: Resurface pavement and strengthen slope

Construction Dates: Aug- Oct 2015

Traffic Impacts: Closed between Hwy 169 and 1st Street beginning at 8 p.m. Friday, Oct. 16 through 5 a.m. Monday, Oct. 19. Lane closures at night and on weekends

Hwy 42

COMPLETE: Hwy 42 from Hwy 14 in Eyota to Hwy 247 in Plainview

Description: Resurface 14 miles of Hwy 42

Status: June-Sept 2015

Traffic Impacts: 4-6 week detour, followed by lanes closures with flaggers

COMPLETE: Hwy 42/Hwy 14 in Eyota

Description: Construct roundabout at intersection of Hwy 14 and Hwy 42

Status: Work begins summer 2015

More information mndot/gov/d6/projects/hwy14-42-roundabout/

Hwy 43

COMPLETE: Hwy 43 near Rushford

Description: Grade and resurface

Construction Dates: May - June 2015

Traffic Impacts: Truck detour through town

More information: mndot.gov/d6/projects/hwy43-rushford/

Hwy 44

COMPLETE: Hwy 44 in Hokah

Description: Reconstruct retaining wall

Construction Dates: June-Aug 2015

Traffic Impacts: Short-term lane closures

Hwy 47

COMPLETE: Hwy 47 in Ramsey, St. Francis

Description: Seal cracked pavement

Construction Dates: Tentatively Summer- Fall 2015, dates TBD

Traffic Impacts: Off-peak lane closures

COMPLETE: Hwy 47 in Columbia Heights, Coon Rapids

Description: Replace signs

Construction Dates: April-June 2015

Traffic Impacts: Shoulder closures

COMPLETE: Hwy 47 St. Francis to north of Dalbo, Isanti County

Description: Resurface 21 miles of road from north of St. Francis to Isanti County Rd 16/401st Ave NW north of Dalbo

Construction Dates: July 9-Aug. 1, 2015

Traffic Impacts: Daylight lane closures, pilot car and flaggers

More information: mndot.gov/d3/newsrels/15/06/26_hwy47.html

Hwy 51/Snelling Avenue

COMPLETE: Hwy 51/ Snelling Avenue in St. Paul (Hamline Midway)

Description: Resurface road, replace bridge deck, improve accessibility

Construction Dates: Fall 2014 through fall 2015

Traffic Impacts: Full closures, lane closures

More information: mndot.gov/metro/projects/snellingfalconheights, 2013 study information available at mndot.gov/metro/projects/snellingstudy

COMPLETE: Hwy 51 and County Road E in Arden Hills

Description: Removed and replaced the two County Road E bridges spanning Snelling Avenue

Construction Dates: Completed late Aug. 2015

More Information: mndot.gov/metro/projects/creoverhwy51ardenhills

COMPLETE: Hwy 51 in Roseville, Arden Hills

Description: Apply sealcoat

Construction Dates: Mid-May to July 31, 2015

Traffic Impacts: Lane Closures

Hwy 52 in the Twin Cities Metro

COMPLETE: Hwy 52 Plato Blvd to I-94 in Saint Paul

Description: Lafayette Bridge, repair and modify bridges, approaches and ramps

Construction Dates: May 2014-Oct 2015

Traffic Impacts:  Temporary lane closures, detours

More Information: mndot.gov/lafayettebridge/

Hwy 52 in Greater Minnesota

COMPLETE: Hwy 52 Rochester

Description: Extending fiber optic communication line 6 miles on Hwy 52 for Intelligent Transportation System. Extends from Hwy 63 north to Olmsted County Rd 12 east exit.

Construction Dates: Summer 2015

Traffic Impacts: None

COMPLETE: Hwy 52 Rochester

Description: Replacing lights with LED bulbs 

Construction Dates: Summer 2015

Hwy 53

COMPLETE: Hwy 53 from 0.40 miles S of Kinmount Creek to Crescent Dr in International Falls

Description: Resurface road, repair slope, replace culvert, bridge

More information: mndot.gov/d1/archive/Hwy53-3608-49/

COMPLETE: Hwy 53 Ash River Area, other locations in St. Louis County

Description: Repair mud slide damage

Construction Dates: Sept. 8-Oct. 24, 2015

COMPLETE: Hwy 53 from Hwy 194 to Anderson Rd in Duluth

Description: Resurface road, new pavement markings, sidewalks, pedestrian ramps

Construction Dates: Sept. 23- Nov. 13, 2015

More information: mndot.gov/d1/archive/Hwy53-6915-133/

COMPLETE: Hwy 53 south from County Rd 540 to County Rd 517

Description: Resurface road, turn, bypass and passing lanes

More information: mndot.gov/d1/archive/Hwy53-6922-54/

Hwy 55 in the Twin Cities Metro

COMPLETE: Hwy 55 in Plymouth

Description: Construct a new third through lane on westbound Hwy 55 between I-494 and Plymouth Boulevard

Construction dates: July 2015-August 2015 

More Information: mndot.gov/metro/projects/hwy55plymouth/

COMPLETE: Hwy 55 in Rosemount, Hastings

Description: Apply a sealcoat

Construction Dates: June 2015-Sept 2015

Traffic Impacts: Temporary lane closures

COMPLETE: Hwy 55 in Medina

Description: Install traffic signals

Construction dates: April–June 2015

Traffic impacts: Off-peak lane closures, temporary sidewalk closures

Hwy 55 in Greater Minnesota

COMPLETE: Hwy 55 from Brooten to Rockford

Description: Upgrade road signs

Construction Dates: October 2014 - July 2015

Traffic Impacts: Shoulder closures

COMPLETE: Hwy 55 from Wendell to Hwy 59

Description: Resurface, improve pedestrian accessibility also includes work on hwys 9 and 28

Construction Dates: April-August 2015

Traffic Impacts: Lane and sidewalk closures

More Information MnDOT.gov/d4/projects/morrisarea/

COMPLETE: Hwy 55 from Glenwood to West Douglas County line

Description: Seal coat

Construction Dates: Summer 2015

Traffic Impacts: Lane closures

Hwy 56

COMPLETE: Hwy 56 in West Concord

Description: Replace pedestrian ramps

Status: March - Sept 2015

Traffic Impacts: Short-term lane closures

Hwy 59

COMPLETE: Hwy 59 from 5 miles south of Plummer

Description: Replace bridge with box culvert and improve approaches

Status: Aug-Sept 2015

Traffic Impacts: Detour

COMPLETE: Hwy 59/Hwy 10 in Detroit Lakes

Description: Frontage road network reconstruction and access improvements

Status: Work begins 2015. Work on frontage road will resume in 2016

More information: mndot.gov/d4/projects/dlfrontageroad

COMPLETE: Hwy 59 Fulda to Slayton

Description: Resurface

Status: Aug-Oct 2015

Traffic Impacts: Lane closures

More information: mndot.gov/d8/projects/hwy59/

COMPLETE: Hwy 59 from Hwy 19 to Hwy 23; Hwy 68 to County Road 33 (in Marshall)

Description: Bituminous resurfacing, turn lane construction, accessibility improvements, reconstruct (1 block)

Status: May-June 2015

Traffic Impacts: Detour, lane closures

More information: mndot.gov/d8/projects/hwy59marshall/

Hwys 60-79

Hwy 60

COMPLETE: Hwy 60 Mazeppa

Description:Replace two bridges on Hwy 60 at Wabasha County Rd 1 and Wabasha County 7

Status: June-Sept 2015

Traffic Impacts: Detour

COMPLETE: Hwy 60 Mountain Lake to Butterfield

Description: Construct additional 2 lanes

Status: May-Oct 2015

Traffic Impacts: Lane closures, delays

More information: mndot.gov/d7/projects/hwy60stjames/

Hwy 61 in the Twin Cities Metro

COMPLETE: Hwy 61 in White Bear Lake

Description: Resurfacing the road

Construction Dates: June 2014 -May 2015

Traffic Impacts: Intermittent lane closures 

More Information: mndot.gov/metro/projects/hwy61whitebearlake

COMPLETE: Hwy 61 in Vadnais Heights

Description: Replace signals and upgrade pedestrian ramps to improve accessibility

Construction Dates: May -June 2015

Traffic Impacts: Lane closures

COMPLETE: Hwy 61 from Frost Ave in Maplewood to Hwy 97 in Forest Lake

Description: Seal cracked pavement

Construction Dates: June -Sept. 2015

Traffic Impacts: Off-peak lane closures

COMPLETE: Hwy 61 at Ramsey County Hwy 8 in White Bear Lake

Description: Upgrade railroad crossing gate arms

Construction Dates: July-Nov 2015

Traffic Impacts: Lane closures

Hwy 61 in Greater Minnesota

COMPLETE: Hwy 61 from 0.04 miles north of 43rd Ave E to 51st Ave E in Duluth

Description: Improve accessibility

Construction Dates: Aug. 3-Oct. 3, 2015

Traffic Impacts: Daytime lane closures

COMPLETE: Hwy 61 from 5.9 miles south of CR 12 (Gunflint Tr) at Cut Face Creek in Cook County

Description: Replace box culvert with bridge, modify channel

Construction Dates: May 11–Oct. 17, 2015

Traffic Impacts: Single lane Oct. 12 - Oct. 15

More information: mndot.gov/d1/archive/Hwy61-1602-48/

COMPLETE: Hwy 61 just north of the east end Lester River Bridge to 0.2 miles north of Superior St in Duluth

Description: Resurface approximately 0.94 miles of Hwy 61, improve guardrail, drainage

Construction Dates: Aug. 3 – Aug. 15, 2015

Traffic Impacts: Temporary lane closures, flaggers

More information: mndot.gov/d1/archive/Hwy61-6925-135/

COMPLETE: Hwy 61 Red Wing

Description: Reconstruct 1 mile of road, construct median and pedestrian safety improvements through downtown  

Status: May 2015-Sept 2016

Traffic Impacts: Long-term lane closures, delays, detours for trucks

COMPLETE: Hwy 61 Red Wing

Description: Resurface 8 miles in north Red Wing from ready mix entrance in Red Wing north to Hwy 19 and grading and resurfacing 3 miles south of Red Wing, adding turn lanes, closing accesses at Sevastopal Road and Wacouta Road  

Status: May-Sept 2015

Hwy 62

COMPLETE: Hwy 62 from Hwy 77 to 34th Ave in Mpls

Description: Install cable median barrier

Construction dates: Mid-Sept. – early Nov. 2015

Traffic impacts: Off-peak lane closures

COMPLETE: Hwy 62 from I-494 to Hwy 169 in Minnetonka, Eden Prairie

Description: Install cable median barrier

Construction dates: Mid-Sept. – early Nov. 2015

Traffic impacts: Off-peak lane closures

Hwy 63

COMPLETE: Hwy 63 Rochester

Description: Resurface 6 miles from Hwy 30 north to 28th St S in Rochester

Construction Dates: May-June 2015

Traffic Impacts: Long-term lane closures, short-term ramp detours at Hwy 52

COMPLETE: Hwy 63 Spring Valley

Description: Repair concrete pavement from Hwy 16 south to Iowa border. Includes culvert replacement and bridge repair.

Construction Dates: May-Sept 2015

Traffic Impacts: 7-week detour, then daily lane closures with flaggers

Hwy 64

COMPLETE: Hwy 64 from CR 23 in Poplar to Hwy 87

Description: Microsurface 14 miles of Hwy 64

Construction Dates: Sept. - early Oct., 2015

Traffic Impacts: Daytime lane closures, flaggers, pilot car

COMPLETE: Hwy 64 from MN 87 to MN 200

Description: Resurface road

Construction Dates: July–Aug 2015

Traffic Impacts: Short-term delays, flagging operations

Hwy 65 in the Twin Cities Metro

COMPLETE: Hwy 65 in Fridley and Spring Lake Park

Description: Hwy 65 resurfacing project

Construction Dates: Completed August 2015

More information: mndot.gov/metro/projects/hwy65springlake/

COMPLETE: Hwy 65 BNSF Railroad Bridge in Minneapolis

Description: Bridge replacement

Construction Dates: Spring 2014-Summer 2015

More information: mndot.gov/metro/projects/hwy65mpls/

Hwy 65 in Greater Minnesota

COMPLETE: Hwy 65 Albert Lea

Description: Resurface 4 miles through Albert Lea, improve pedestrian ramps

Construction Dates: May-Sept 2015

Traffic Impacts: 3-week detour, then long-term lane closures, short-term ramp closures at I-35

More Information: mndot.gov/d6/projects/hwy65-resurfacing/index.html

Hwy 67

COMPLETE: Hwy 67, 212

Location:Hwy 67 from Hwy 75 to Hwy 59 in Clarkfield; Hwy 67 from 6th Street in Clarkfield to Hwy 212; Hwy 212 from Hwy 67 to Hwy 23

Description: Resurface, accessibility improvements

Construction Dates: July-Oct 2015

Traffic Impacts: Lane closures

More information: mndot.gov/d8/projects/hwy67-212/

Hwy 68

COMPLETE: Hwy 68 from County Road 33 north of Marshall

Description: Turn lane construction

Status: Lighting work will be completed this winter

Construction Dates: Sept-Oct 2015

More Information: mndot.gov/d8/projects/hwy68-marshall/index.html

Hwy 70

COMPLETE: Hwy 70 just east of Hwy 61 to Wisconsin border

Description: Resurface road, correct profile, improve drainage, turn lanes, construct bridge

Status: May 18–Oct 31, 2015

Traffic Impacts: Traffic is reduced to a single lane Monday through Saturday in various locations from 2.1 miles east of County Road 3 to the Wisconsin border,

More information: mndot.gov/us/d1/archive/Hwy70easti35

Hwy 71

COMPLETE: Hwy 71 in Beaver Creek (4.5 miles south of Olivia)

Description: Stabilize stream

Status: Oct. 2015

Traffic Impacts: None

COMPLETE: Hwy 71 from Hwy 14 to Redwood Falls

Description: Reconstruct road; repair high tension guardrail

Status: May-June 2015

Traffic Impacts: Lane closures

Hwy 75

COMPLETE: Hwy 75 Luverne

Description: Resurface road, replace culvert, improve sidewalk accessibility

Construction Dates: May - October

COMPLETE: Hwy 75, 100 from Halstad to Shelly on Hwy 75; Bridge #54004 to Halstad on Hwy 200

Description: Resurface roads, repair culverts, guard rails and inslope, remove silt and debris

Construction Dates: May 11 - July 2015

COMPLETE: Hwy 75 from County Rd 9 south of Trosky to Hwy 30

Description: Resurface

Construction Dates: July - Aug 2015

Traffic Impacts: Lane closures

More information: mndot.gov/d8/projects/hwy75/

COMPLETE: Hwy 75 from Hwy 12 to Graceville

Description: Seal coat

Construction Dates: Summer 2015

Traffic Impacts: Lane closures

COMPLETE: Hwy 75 from 40th Ave to 46th Ave in South Moorhead

Description: Expand to four lanes

Status: May 2015 to July 2015

Traffic Impacts: Minimal in 2015, detour in 2016

COMPLETE: Hwy 75 in Pipestone to 161st St. (Pipestone Creek)

Description: Resurface roadway

Status: October 19-November 7

Traffic Impacts: Temporary lane closures

Hwy 77

COMPLETE: Hwy 77 Minnesota River Crossing in Bloomington and Eagan

Description: Replace bridge joints and guardrail; paint bridges and walkways

More information: mndot.gov/metro/projects/hwy77mnriver/

 

Hwys 80-99

COMPLETE: Hwy 84 north of Pine River

Description: Replace bridge over Ada Brook seven miles north of Hwy 371 in Pine River

Construction Dates: Aug-Oct 2015

Traffic Impacts:

  • Aug: Shoulder and lane closures to prepare work area and relocate utilities
  • Sep-mid Oct: Hwy 84 closed at bridge. Detour uses Hwy 371 Pine River to Backus and Hwy 87 Backus to Hwy 84 south of Pontori.
  • Detour map: mndot.gov/d3/2015/hwy84.pdf

Hwy 89

COMPLETE: Hwy 89 from MN 219 to Roseau and MN 11 to the Canadian border

Description: Resurface roads

Construction Dates: June-July 2015

Traffic Impacts: Flagging/pilot car operations

COMPLETE: Hwy 2, 89 West of Bemidji

Description: New bridge, turn lanes

Construction Dates: July - Fall 2015

Traffic Impacts: Lane closures, single short-term detour when bridge beams set

I-90

COMPLETE: I-90 Dakota

Description: Replace interchange lighting system at Jct of I-90, Hwy 14 and Hwy 61

Construction Dates: Summer 2015

Traffic Impacts: Short-term lane closures

COMPLETE: I-90 Dresbach

Description: Resurface 2 miles of bicycle trail at exit 273A to half mile west of Jct of I-90, Hwy 14 and Hwy 61, plus improvements for accessibility and culvert repair.

Construction Dates: Sept-Oct 2015

More Information: mndot.gov/dresbachbridge/

COMPLETE: I-90 from Adrian to Rushmore

Description: Resurface 7 miles of eastbound interstate

Construction Dates: May - October

Traffic Impacts: Two-way traffic with crossovers; reduced speeds

More Information: mndot.gov/d7/projects/I90preserve/

COMPLETE: I-90 St. Charles to Eyota

Description: Repair 12.5 miles of concrete pavement of WB I-90 and resurface ramps

Traffic Impacts: Open to traffic in both directions. Some minor work installing rumble strips remains.

COMPLETE: I-90 from Hwy 22 to Hwy 109 in Alden

Description: Resurface 8 miles of 4-lane roadway

Construction Dates: May to November

Traffic Impacts: Two-way traffic with crossovers; reduced speeds; detour for access to/from Hwys 22 and 109

More Information: mndot.gov/d7/projects/I90preserve/

I-94 in Twin Cities Metro

COMPLETE: I-94 in Maple Grove

Description: Repair ramp from eastbound I-94 to Weaver Lake Road

Construction Dates: Sept. 14- Oct. 15, 2015 (Completed Weds, Oct. 14.)

Traffic Impacts: Ramp closure, detour

More Information: mndot.gov/metro/projects/i94maplegrove/

I-94 west of Manning Ave in Woodbury to west of St. Croix River Bridges in Lakeland

Description: Replace and/or repair drainage pipes

Construction dates: Mid-April-early August 2015

Traffic impacts: Lane Closures

COMPLETE: I-94 in St. Paul, at I-494 in Bloomington and at Hwy 5 near MSP airport

Description: Install roadway message signs

Construction dates: May-Nov. 2015

Traffic impacts: Shoulder closures

I-94 in Greater Minnesota

COMPLETE: I-94 Rogers to St. Michael

Description: Add lanes to EB and WB I-94, construct noise wall, widen Crow River bridges.

Construction Dates: July 2014-Oct 2015

Traffic Impacts: All new eastbound and westbound lanes and ramps are open. However, motorists may still encounter periodic lane closures as crews wrap up the project. I-94 both directions

More Information: mndot.gov/d3/i94/

COMPLETE: I-94 Monticello to St. Michael

Description: Resurface eastbound I-94 from CR 75 to Hwy 241

Status: April 27 - May 29, 2015

Traffic Impacts: Overnight single-lane closures, delays
More information: mndot.gov/d3/newsrels/15/4/13_i94.html

COMPLETE: I-94 west of Monticello at CR 111

Description: Repair railing and approach panels on CR 111 bridge spanning I-94

Status: April 13 - June 30, 2015

Traffic Impacts: Periodic shoulder closures on I-94. CR 111 bridge closed, use alternative routes
More information: mndot.gov/d3/newsrels/15/4/8i94.html

COMPLETE: I-94 East of Hwy 336, I-94 ramps at Hwy 34, Rothsay, Hwy 108

Description: Resurface .3 miles of EB I-94 and several ramps

Status: September

Traffic Impacts: Intermittent ramp and lane closures

COMPLETE: I-94 East of Moorhead

Description: Upgrade scale equipment and repair pavement at the Red River Weigh Station

Status: July - September

Traffic Impacts: Weigh station closed

COMPLETE: I-94 Hwy 336 to Barnesville and Alexandria to Osakis

Description: Install cable median barriers

Status: June- August 2015

Traffic Impacts: Lane closures

COMPLETE: I-94 Northwest of Fergus Falls

Description: Resurface I-94 bridge decks over Otter Tail CR 10

Status: April 20 - late October 2015

Traffic Impacts: Two-way two-lane traffic

COMPLETE: I-94 Red River at Moorhead to Hwy 336

Description: Resurface roadway

Status: TBD

Traffic Impacts: Lane closures

Hwy 95

COMPLETE: Hwy 95 from Hwy 8 in Shafer to Hwy 96 in Stillwater

Description: Seal cracked pavement

Construction Dates: June -Sept. 2015

Traffic Impacts: Off-peak lane closures

COMPLETE: Hwy 95 at Isanti Trail in North Branch

Description: Construct turn lanes

Construction Dates: Aug- Sept 2015

Traffic Impacts: Lane closures

COMPLETE: Hwy 95 Cambridge

Description: Replace Hwy 95 bridge spanning Rum River

Construction Dates: May 2014 - Late summer 2015

Traffic Impacts: The new bridge opened to traffic on May 28, 2015. Detour is lifted. Motorists may continue to encounter periodic lane closures with flaggers at the bridge through late summer as crews wrap up the project.

More information: mndot.gov/d3/newsrels/15/5/28_hwy95.html

Hwy 96

COMPLETE: Hwy 96 from Hwy 61 in White Bear Lake to Hwy 95 in Stillwater

Description: Seal cracked pavement

Construction Dates: June -Sept 2015

Traffic Impacts: Off-peak lane closures

Hwys 100-199

Hwy 100

COMPLETE: Hwy 100 in Golden Valley

Description: Extend northbound exit ramp to Hwy 55 and turn lanes

Construction dates: Aug 2015-Sept 2015

Traffic impacts: Ramp and shoulder closures

Hwy 108

COMPLETE: Hwy 108 Pelican Rapids to Hwy 78

Description: Seal coat

Construction Dates: TBD

Traffic Impacts: Lane closures

COMPLETE: Hwy 108 near Pelican Rapids, Henning and Ottertail

Description: Replace culverts

Status: September -October 2015

Traffic Impacts:detour

Hwy 111

COMPLETE: Hwy 111 at Nicollet, between Hwy 99 and Hwy 14

Description: Reconstruct city utilities, sidewalks and pavement

Construction Dates: May-July 2015

Traffic Impacts: Detour

Hwy 169 in the Twin Cities Metro

COMPLETE: Hwy 169 in Jordan

Description: Resurface road, construct median barrier, work on bridges

Construction Dates: Spring 2015-Nov 2015

Traffic impacts: Road closures, lane closures, detours

More information: mndot.gov/metro/projects/hwy169jordan/

COMPLETE: Hwy 169 in Shakopee

Description: Add a third southbound lane between County Hwy 21 and County Hwy 83

Construction Dates: Aug 2015-Sept 2015

Traffic impacts: Lane closures, narrowed lanes, delays

Hwy 169 in Greater Minnesota

COMPLETE: Hwy 169 from Woodland Pk Rd to 13th St in Grand Rapids, Curley Ave to Elizabeth Ave in Coleraine

Description: Resurface road, improve drainage, sidewalks, repair bridge in Coleraine
More Information: mndot.gov/d1/archive/Hwy169-3115-71/

COMPLETE: Hwy 169

Description: Repair, maintain, improve drainage systems, project also includes work on hwys 2, 65 and 210

Construction Dates: Aug 2014-June 2015

Traffic Impacts: Daytime lane closures

COMPLETE: Hwy 169 at Vineland along Mille Lacs Lake

Description: Replace the Rum River bridge along the southwest shore of Mille Lacs Lake

Construction dates: June - Oct. 29, 2015

Traffic impacts: Traffic switched to temporary bypass lanes, reduced speeds,  intermittent lane closures, possible flaggers

More information: mndot.gov/d3/newsrels/15/5/21_hwy169.html

Hwy 172

COMPLETE: Hwy 172 from 5.7 miles north of Wabanica Creek

Description: Repair inslope at Wabanica Creek

Construction Dates: Spring - June 2015

Traffic Impacts: None

Hwy 197

COMPLETE: Hwy 197 from Bemidji, from 23rd Ave. to Hannah Ave.

Description: Replace and install pedestrian curb ramps, install accessible pedestrian signal enhancements; upgrade signal at Irvine Ave.

Construction Dates: April 15 - July 2015

Traffic Impacts: Lane closures, delays

More Information: mndot.gov/d2/projects/hwy197bemidji/

Hwys 200-299

Hwy 200

COMPLETE: Hwy 200 from CSAH 35 to S Jct MN 32

Description: Resurface road

Construction Dates: September 2015

Traffic Impacts: Single lane with flagger and pilot car

Hwy 210

COMPLETE: Hwy 210/371 Intersection in Baxter

Description: Improve Hwy 210/Hwy 371 intersection. Construct dual left-turn lanes on Hwy 210 and lengthen turn lanes on Hwy 210/371.

Construction Dates: April 27 - June 12, 2015

Traffic Impacts: lane closures and flaggers during non-rush hours from sunup to sundown, Mondays through Saturdays.

More information: mndot.gov/d3/newsrels/15/4/20_hwy371_210.html

COMPLETE: Hwy 210/County Rd 59 Riverton

Description: Install a Rural Intersection Conflict Warning System

Construction dates: Fall 2015 - Spring 2016

Traffic impacts: Possible lane or shoulder closures.

More information: mndot.gov/trafficeng/signals/conflictwarning.html

Hwy 212

COMPLETE: Hwy 212, 67

Location: Hwy 212 from Hwy 67 to Hwy 23, Hwy 67 from Hwy 75 to Hwy 59 in Clarkfield; Hwy 67 from 6th Street in Clarkfield to Hwy 212;

Description: Resurface, accessibility improvements

Construction Dates: July-Oct 2015

Traffic Impacts: Lane closures

More information: mndot.gov/d8/projects/hwy67-212/

COMPLETE: Hwy 212 from Powers Blvd in Chanhassen to I-494 in Eden Prairie

Description: Install cable median barrier

Construction Dates: Mid-May–early July 2015

Traffic Impacts: Off-peak lane closures

Hwy 253

COMPLETE: Hwy 253 north of Bricelyn

Description: Replace bridge over E Fork of Blue Earth River

Construction Dates: July-Aug 2015

Hwy 269

COMPLETE: Hwy 269 from MN/SD state line to Hwy 23 in Jasper

Description: Resurface roadway

Construction Dates: October 19-November 7

Traffic Impacts: Temporary lane closures

Hwys 300-694

Hwy 371

COMPLETE: Hwy 371 from Walker to just south of the railroad crossing in Cass Lake

Description: Resurface roads, repair culverts, add turn lanes

Construction Dates: Summer 2015

Traffic Impacts: Short-term delays, flagging operations

More Information: mndot.gov/d2/projects/hwy371walker/

COMPLETE: Hwy 371/210 Intersection in Baxter

Description: Improve Hwy 210/Hwy 371 intersection. Construct dual left-turn lanes on Hwy 210 and lengthen turn lanes on Hwy 210/371.

Construction Dates: April 27 - June 12, 2015

Traffic Impacts: lane closures and flaggers during non-rush hours from sunup to sundown, Mondays through Saturdays.

More information: mndot.gov/d3/newsrels/15/4/20_hwy371_210.html

COMPLETE: Hwy 371 Baxter to Nisswa and Jenkins to Pine River

Description: Crack seal

Construction Dates: April 20 - April 30, 2015

Traffic Impacts: Lane closures, flaggers

More Information: mndot.gov/d3/newsrels/15/4/14_hwy371.html_hwy371.html/

I-394 in the Twin Cities Metro

COMPLETE: I-394 in Minneapolis

Description: Resurface I-394 and frontage roads; reconstruct Lyndale Ave bridge

Construction Dates: June 2015-November 2015

Traffic Impacts: Lane and ramp closures

More Information: mndot.gov/metro/projects/i394minneapolis/