Jump to main content.
Minnesota Department of Transportation Go to 511
MnDOT A to Z | General Contacts | Simple Search | Advanced Search
roadwork equipment
 

I-35W/Hwy 62 Crosstown reconstruction project

Project Home |Project Maps | Web Cam | Schedule | Portland Ave. Bridge | Contact Us

 

Project Area

 

 

 

 

 

 

 

 

 

 

 

 

Maps

 

Design layout

The current design layout for the I-35W/Highway 62 Reconstruction project shows the engineering layout for the project area. For ease of viewing, the engineering layouts are divided into separate segments that can be selected from the index map. [see Design layout Index]

 

The design layout shown on this Web site reflects the results of the Municipal Consent Appeal Process that was completed in 2005 between Mn/DOT and the city of Minneapolis. This design layout has been approved by Mn/DOT, the city of Minneapolis and the city of Richfield.

 

Project Area

 

The I-35W/Highway 62 Reconstruction involved reconstruction of the major interchange between I-35W and Hwy 62, as well as segments of both freeways that lead into the interchange. The project extended from 42nd Street to 66th Street on I-35W, and from Penn Avenue to Portland Avenue on Highway 62.