Quick Links
Metro District 2008-2030 Transportation System Plan
2008- 2030 Transportation System Plan (pdf 7.95 mb)
Executive Summary — (pdf 366kb)
Chapter 1— Introduction and Purpose (pdf 256kb)
Chapter 2 — Major Trends Affecting Transportation (pdf 137kb)
Chapter 3 — District Planning Direction (pdf 147kb)
Chapter 4 — Performance Based Investment Plan (pdf 3.14 mb)
Chapter 5 — Fiscally Constrianed Investment Plan (pdf 682kb)
Chapter 6 — Work Program and Implementation
- Appendix A — Performance Based and Fiscally Constrained Project Plan List (pdf 1.18 mb)
- Appendix B — Draft Jurisdiction Plan
- Appendix C — Major Project Planned Investment Illustrations (pdf 973kb)
- Appendix D — Comments on the draft 2008- 2030 Transportation System Plan dated June 29, 2005 (pdf 124kb)
- Appendix E — Summary of comments and responses to the draft 2008- 2030 Transportation System Plan dated June 29, 2005 (pdf 1.12mb)
The Metro 20+ Year Plan
The 2008-2030 Transportation System Plan (pdf 7.95mb) TSP has been prepared by the Minnesota Department of Transportation Mn/DOT Metro District as a guide for future investments to the state trunk highway system within Metro District's eight-county metropolitan area. The 2008-2030 TSP provides a critical link in the transportation planning and investment programming process. It identifies the long-term system and corridor improvements required to achieve and maintain established performance targets. The TSP is Metro District's investment plan for the next 20+ years reflecting federal, state, and regional policy and performance direction; projected funding availability; and priorities identified in consultation with Mn/DOT, the Metropolitan Council, and other Metro District transportation stakeholders. Future investments identified in the TSP are consistent with policies set forth Statewide Transportation Plan and District Plan Guidance as well as the Metropolitan Council's Transportation Policy Plan.

