 |
Re-evaluation of the 2006 Supplemental Final
Environmental Impact Statement - Sept. 2012 (30 MB, PDF)
Log Cabin Restaurant (Club Tara) d.b.a. Phil’s Tara Hideaway - One Pager - Sept. 6, 2012 (883 KB, PDF)
Final Bridge Design
- Request Forms for Preliminary Bridge Plans -- *required to receive the plans (March 30, 2012)
- Draft plan requests can be sent to
- Visual Quality Manual Amendment (hi-res 12 MB, PDF) (October, 17, 2011)
- Visual Quality Manual Amendment (low-res 4 MB, PDF) (October, 17, 2011)
- Concept Refinement Report (6.3 MB, PDF) June, 2010
- Water Quality Amendment (30 MB, PDF) February, 2012
- Foundation Design Options Report (2 MB, PDF) June, 2010
- Preliminary Foundation Evaluation and Geotechnical Review (627 KB, PDF)
- Load Test Report (8 MB, PDF)
- Load Test Addendum (110 KB, PDF)
Annual Project Summary Report - March 1, 2012 (388K pdf)
Stillwater Cultural Landscape Illustrative Study - (8,993k pdf)
Annual Project Summary Report - March 1, 2011 (2,352k pdf)
NPS Section 7(a):
Scenic Overlook - Historic Preservation Plan - December 2010 (14,902k pdf)
Design Build - Mn/DOT's Design Build Program
Annual
Project Summary Report - March 1, 2010 (91k pdf)
Project Management
Plan - January 15, 2009 (3,777k pdf)
Annual
Project Summary Report - March 1, 2009 (60k pdf)
Concept
Design and Associated Services for the
Proposed New St. Croix River Crossing (April
2008)
Annual
Project Summary Report - March 1, 2008 (70k pdf)
Annual
Project Summary Report - March 1, 2007 (69k pdf)
Visual
Quality Manual - January 2007
FHWA'S
Record of Decision - November 13, 2006 (585k pdf)
Mn/DOT's
Adequacy Determination - November 14, 2006 (4,655k pdf)
2006
Supplemental Final Environmental Impact Statement (SFEIS) -
June 2006
Amended Section 106 Memorandum of Agreement - May 16,
2006 (3,076k pdf)
Risk Assessment Workshop Report - April 2006
Memorandum
of Understanding For the Implementation of Riverway Mitigation Items -
April 11, 2006 (3,705k pdf)
Memorandum
of Understanding For the Implementation of Growth Management Mitigation
Items - April 11, 2006 (2,176k pdf)
Memorandum of Understanding For the Water Quality Management Advisory
Committee - March 9, 2006 (517k pdf)
Cost
Estimate Review Report -
February 2006
Water Resources Preliminary Design
Report - January 2006
Historic
Shoddy Mill and Warehouse Buildings - March
2005 to present
Transit
and Land Use Workshop & Report - December
13, 2004
2004
Supplemental Draft Environmental Impact Statement (SDEIS) - August
2004
Structure
Types Technical Report -
July revised Dec 2004 (2,260k pdf)
Agricultural
Impact Statement -
October 2004 (869k pdf)
2003
Draft and 2004 Final Scoping Decision Documents - March
2004
TH
36 - Partnership Study and Refinement of Concept "F" - 2002
- 2004
"One
River, Two Bridges" Report - January 2002 (8,982k
pdf)
1999 Amended Scoping Decision Document -
February 1999
"A
Graceful Solution for a Magnificent River" Report-
September 1998
1995
FHWA's Record of Decision - July 1995 (282k pdf)
1995 Final Environmental Impact Statement -
April 1995 (12,792k pdf)
1990
Stillwater-Houlton Draft EIS -
March 1990 (7,184k pdf)
1987 Final
Scoping Document - January 1987
Map
of Alternatives Studied 1985-2003 -
(365k pdf)
Official
project documents are available for review at the following
locations:
• Oak Park Heights City Hall, 14168 Oak Park
Blvd North,
Oak Park Heights
• Stillwater City Hall, 216 North Fourth Street, Stillwater
• St. Joseph Town Hall, 1337 County Road V, Town of St. Joseph
• Bayport Public Library, 528 North Fourth Street, Bayport
• Carleton A. Friday Memorial Library, 155 East First Street, New Richmond
• Hudson Area Joint Library, 911 Fourth Street, Hudson
• Somerset Public Library, 208 Hud Street, Somerset
• Stillwater Public Library, 223 Fourth Street North, Stillwater
• Washington Co. Gov. Center Library, 14949 62nd Street North, Stillwater
• Mn/DOT - Metro District, 1500 County Road B2, Roseville
• Mn/DOT Library, 395 John Ireland Boulevard, St. Paul
• Wis/DOT Planning Library, 4802 Sheboygan Avenue, Madison
• Minneapolis Public Library, 300 Nicollet Mall, Minneapolis
• Wis/DOT Northwest Region Office, 718 West Clairemont Avenue, Eau Claire
• Project
Website www.dot.state.mn.us/metro/projects/stcroix

|