This
PDF version of the TEXT DOCUMENT contains the text to each
individual chapter. Tables, figures, and appendices are available
as links from the pdf text file. Advantage: smaller files
to download. The reading and navigation of these files will
be easier if you use the latest software - ADOBE
READER
Signature
Page - (546k PDF)
Abbreviated
Table of Contents - Links To Chapters - ( 265k PDF)
Executive
Summary - (71k PDF)
Chapter
1 - Introduction (71k PDF)
Chapter
2 - Purpose and Need for Action (566k PDF)
Chapter
3 - Description of Alternatives (317k PDF)
Chapter
4 -Transportation Systems and Impacts - (317k PDF)
Chapter
5 - Social, Relocation and Economic Impacts - (272k
PDF)
Chapter
6 - Land Use Impacts - (192k PDF)
Chapter
7 - Visual Impact Analysis - (491k PDF)
Chapter
8 - Air Quality, Traffic Noise and Contaminated Sites
- (177k PDF)
Chapter
9 - Natural Resource Impacts - (129k PDF)
Chapter
10 - Water Resources - (218k PDF)
Chapter
11 - Archaeological and Historic Resources - (241k
PDF)
Chapter
12 - Construction Impacts - (183k PDF)
Chapter
13 - Cumulative Impacts - (121k PDF)
Chapter
14 - Adverse Impacts, Short-term vs Long Term Productivity,
and Commitment of Resources - (85k PDF)
Chapter
15 - Agency Coordination, Stakeholder Group and Public
Involvement - (60k PDF)
Chapter
16 - List of Preparers - (49k PDF)
Chapter
17 - SDEIS Recipients - (24k PDF)
Chapter
18 - SDEIS Index - (29k PDF)
Appendix
A - Project Documents and Availability - (43k PDF)
Appendix
B - Stakeholders' Operating Agreement for the St.
Croix Crossing Problem -Solving Process - (29k PDF)
Appendix
C - Agency Coordination Letters - (4,224k PDF)
Appendix
D - Environmental Justice - Houlton Area Public Meeting
- (69k PDF)
Appendix
E - Draft Section 4(f) Evaluations
Appendix E - Introduction (58k
PDF)
Appendix E - Lower
St. Croix National Scenic Riverway - (81k PDF)
Appendix E - Lift
Bridge - (66k PDF)
Appendix E - Stillwater
Municipal Barge Facility Property - (66k PDF)
Appendix E - Kolliner
Park - (75k PDF)
Appendix E - Lowell
Park - (35k PDF)
Appendix E - New
Stillwater Park (yet unnamed park) - (39k PDF)
Appendix E - Stillwater
Commercial Historic District - (47k PDF)
Appendix E - Stillwater
Cultural Landscape District - (70k PDF)
Appendix E - Fairview
Cemetery - (33k PDF)
Appendix
F - National Park Service Correspondence- (2,778k
PDF)
Appendix
G - 1994 Section106 Memorandum of Agreement (MOA)
- (1,199k PDF)
Appendix
H - 1999 U.S. FWS Correspondence to FHWA -Zebra Mussel
Decontamination Protocol - (1,116k PDF)
SUPPORTING
TECHNICAL MEMORANDA
Table
of Contents - (51k PDF)
Noise
on the River - (813k PDF)
Economic
Impact Analysis - (762k PDF)
Traffic
Demand Forecast - (6,322k PDF)
Traffic
Operations Analysis - (6,830k PDF)
Stillwater Bridge Origin Destination Survey - (2,841k PDF)
Benefit-Cost
Analysis - (1,109k PDF)
Land
Use Impacts - (285k PDF)
Lift
Bridge Repair / Replacement Requirements - (88k PDF)
Water
Runoff Impacts - (41k PDF)
Existing
TSM/TDM Measures - (2,211k PDF)
 |
This
pdf version of the FULL DOCUMENT contains all the text,
tables, figures, and appendices in a single pdf file
for each individual chapter. Advantage: able to print
full chapters, reads like the hard copy. The reading
and navigation of these files will be easier if you use
the latest software - ADOBE
READER
Cover/Signature
Page/Abbreviated Table of Contents - (1,016k
PDF)
Executive
Summary - (1,238k PDF)
Chapter
1 - Introduction (1,309k PDF)
Chapter
2 - Purpose and Need for Action (701k PDF)
Chapter
3 - Description of Alternatives (8,790k PDF)
Chapter
4 -Transportation Systems and Impacts - (1,800k PDF)
Chapter
5 - Social, Relocation and Economic Impacts - (8,093k
PDF)
Chapter
6 - Land Use Impacts - (5,000k PDF)
Chapter
7 - Visual Impact Analysis - (10,333k PDF)
Chapter
8 - Air Quality, Traffic Noise and Contaminated Sites
- (2,134k PDF)
Chapter
9 - Natural Resource Impacts - (2,295k PDF)
Chapter
10 - Water Resources - (7,208k PDF)
Chapter
11 - Archaeological and Historic Resources - (1,592k
PDF)
Chapter
12 - Construction Impacts - (8,489k PDF)
Chapter
13 - Cumulative Impacts - (122k PDF)
Chapter
14 - Adverse Impacts, Short-term vs Long Term Productivity,
and Commitment of Resources - (85k PDF)
Chapter
15 - Agency Coordination, Stakeholder Group and Public
Involvement - (60k PDF)
Chapter
16 - List of Preparers - (49k PDF)
Chapter
17 - SDEIS Recipients - (24k PDF)
Chapter
18 - SDEIS Index - (29k PDF)
Appendix
A - Project Documents and Availability - (43k PDF)
Appendix
B - Stakeholders' Operating Agreement for the St.
Croix Crossing Problem -Solving Process - (29k PDF)
Appendix
C - Agency Coordination Letters - (4,224k PDF)
Appendix
D - Environmental Justice - Houlton Area Public Meeting
- (69k PDF)
Appendix
E - Draft Section 4(f) Evaluations - (5,829k PDF)
Appendix
F - National Park Service Correspondence- (2,774k
PDF)
Appendix
G - 1994 Section106 Memorandum of Agreement (MOA)
- (1,199k PDF)
Appendix
H - 1999 U.S. FWS Correspondence to FHWA -Zebra Mussel
Decontamination Protocol - (1,116k PDF)
SUPPORTING
TECHNICAL MEMORANDA
Cover/Table
of Contents - (204k PDF)
Noise
on the River - (813k PDF)
Economic
Impact Analysis - (762k PDF)
Traffic
Demand Forecast - (6,435k PDF)
Traffic
Operations Analysis - (3,350k PDF)
Stillwater Bridge Origin Destination Survey - (2,841k PDF)
Benefit-Cost
Analysis - (16,335k PDF)
Land
Use Impacts - (4,210k PDF)
Lift
Bridge Repair / Replacement Requirements - (88k PDF)
Water
Runoff Impacts - (41k PDF)
Existing
TSM/TDM Measures - (2,211k PDF)
 |