Highway 3/Robert Street

St. Paul

About this project

Hwy 3/Robert Street in St. Paul project location map

Hwy 3/Robert Street in St. Paul project location map.

Click map for larger version.

We have made several repairs along Robert St. in 2020, including pedestrian improvements and minor repairs of the Robert St. Bridge over the Mississippi River in St. Paul. We are also planning to make minor repairs to the bridge over the Union Pacific railroad and to the Robert St./George St. viaduct. In addition, we are planning significant improvements to Robert St. in future years.

The future of Robert St.

MnDOT is planning significant improvements to Robert St. between Annapolis St. and Fillmore Ave. in 2025 or 2026. As a part of this planning process, MnDOT sought community feedback to gather input on various topics, including safety improvements, accessibility and street design features. This engagement included an online survey, interactive comment map and a series of virtual public meetings in summer and fall 2020.

This community input will influence MnDOT’s designs for future improvements on Robert St. Individual feedback will be kept private, but major themes and recurring comments will be summarized in a public report that is tentatively scheduled to be released in December 2020.

After designs are developed, there will be another community engagement period for people to provide additional input. Any future work along Robert St. will be completed in coordination with other public entities, including the City of St. Paul and the Metropolitan Council, to limit construction disruptions for residents, businesses and property owners.

Pedestrian safety pilot project
An example of curb extensions
An example of curb extensions

MnDOT is installing new temporary safety features at the intersections of Baker St. and Robert St. and Isabel St. and Robert St. this fall.

These temporary safety features, called curb extensions (or bump-outs or bulb-outs), visually and physically narrow the roadway. This creates shorter crossings for pedestrians and increases visibility for people walking and driving. Curb extensions will not take any parking away or affect access to driveways, but may make parking near the corner more difficult.

The goal of this project is to test the curb extensions before committing to them as a long-term design improvement at the intersection. During the project, MnDOT will evaluate pedestrian and driver behavior and determine the impact they have on traffic, such as pedestrian usage and vehicle speeds.

There is currently no specific date for the removal of the extensions, but they will be maintained by MnDOT for the foreseeable future.

Share your thoughts on these temporary curb extensions by completing our feedback form.

Summary of work

  • Micro-surface and restripe Robert St. between Annapolis St. (south of the Mississippi River) and 11th St. in downtown St. Paul (just south of I-94): June through July 2020
  • Repair Robert St. Bridge over the Mississippi River: July through August 2020
  • Test temporary curb extensions at the intersections of Baker St. and Robert St. and Isabel St. and Robert St.: Begins fall 2020
  • Construction of corridor improvements: Tentatively 2025-2026

Traffic impacts

Upcoming

Information about upcoming traffic impacts will be provided as details become available.