Quick Links
More Links
Reports and Documents
Award for Stakeholder Involvement - July 31, 2009 (42kb PDF)
Lift Bridge Management Plan - March 2009 (8,296kb PDF)
Underwater Bridge Inspection Report - October 30 2008 (1,934kb PDF)
Lift Bridge
Report of Findings - September 2007 (16.8mb PDF)
Lichtenstein's 1999 Stillwater Lift Bridge Report - May 1999 (38.0mb PDF)
Mn/DOT's
Pre-1956 Bridges - Programmatic Agreement
General
Historic Bridge Management Plan - June 2006 (3.2mb PDF)
Fatigue Evaluation
of Stillwater Bridge - 1998 (0.4mb PDF)
Construction
and Previous Repairs and Modifications (Vol. 1 of 2 - narrative and specifications) -
March 2003 (60mb PDF)
Construction
and Previous Repairs and Modifications (Vol. 2 of 2 - construction drawings) -
March 2003 (35.3mb PDF)
$5 Million Bridge
Repair Plan - September 2004 (49.7mb PDF)
$5 Million Bridge Repair Project Reports:
Tenders House
Repair Report (12,153kb PDF)
Deck Replacement Study (1,124kb PDF)
Pedestrian Railing
Repair Study (2,000kb PDF)
Structural Inspection and Preliminary Condition Evaluation:
Volume 1 (555
kb PDF), Volume
2 (4,876kb PDF)
Mechanical and Electrical Inspection and Evaluation:
Volume 1 (655
kb PDF), Volume
2 (4,170kb PDF)
Maintenance
Projections and Annualized Costs (1,051kb PDF)
Repair Methods, Schedule
and Probable Repair Costs (1,000kb PDF)
Repair Needs (650kb PDF)

