All major road construction is complete. However, crews will return in spring 2018 to finish a few minor wrap-up items.

Time frames are all approximate and weather dependent.

Completed

Take a look at what we did on this I-94 East Metro project (PDF).

  • All EB I-94 lanes resurfaced between St. Paul and Maplewood
  • All WB I-94 lanes resurfaced between Maplewood and St. Paul
  • All entrance/exit ramps resurfaced in the project area
  • All EB and WB I-94 permanent lane and ramp striping

About this project

Summary of work

  • Resurfaced EB & WB I-94 between Mounds Blvd. to east of Hwy 120/Century Ave.
  • Built a new auxiliary lane & extend the existing auxiliary lane along EB I-94 between the exit to East 7th St. and the entrance from Mounds Blvd.
  • Constructed two emergency pull-off sites along EB I-94 between the exit to East 7th S. and the entrance from Mounds Blvd.
  • Resurfaced Hwy 61 from north of Burns Ave. to Hwy 5
  • Created trail connections at McKnight Rd. and Century Ave.
  • Updated signals and pedestrian access
  • Built a new noise wall and replace part of an existing noise wall between Conway St. and Maple St.
  • Repaired Bridges