Minnesota Department of Transportation

511 Travel Info

I-94

St Paul, Oakdale, Landfall, Maplewood, Woodbury

Traffic impacts

Map of I-94 project area in St. Paul

I-94 project area. Click map for larger PDF version.

All major road construction is complete. However, crews will return in spring 2018 to finish a few minor wrap-up items.

Time frames are all approximate and weather dependent.

Current

Note: There will be no traffic impacts from 9 a.m. Fri, May 25 to 8 p.m. Tue, May 29.

Lane closures

9a.m. to 5p.m. Thu, May 24
  • WB I-94 left lane closure between Hwy 61 and Mounds Blvd.
7a.m. to 3p.m. Thu, May 24
  • EB I-94 left lane closure between Mounds Blvd. and Hwy 61
May 20 through early June; 8 p.m. to 5 a.m. nightly
  • WB I-94 will have overnight lane closures between Hwy 120/Century Ave. and Mounds Blvd. Traffic will be reduced to a single lane at various times during project work.

Ramp closures

May 20 through early June; 8 p.m. to 5 a.m. nightly
  • Several WB I-94 entrance/exit ramps will close between Hwy 120/Century Ave. and Mounds Blvd. Note: At least every other ramp will remain open at all times.

Upcoming

Details on upcoming traffic impacts will be provided as they become available.

Completed

Take a look at what we did on this I-94 East Metro project (PDF).

  • All EB I-94 lanes resurfaced between St. Paul and Maplewood
  • All WB I-94 lanes resurfaced between Maplewood and St. Paul
  • All entrance/exit ramps resurfaced in the project area

About this project

Summary of work

  • Resurfaced EB & WB I-94 between Mounds Blvd. to east of Hwy 120/Century Ave.
  • Built a new auxiliary lane & extend the existing auxiliary lane along EB I-94 between the exit to East 7th St. and the entrance from Mounds Blvd.
  • Constructed two emergency pull-off sites along EB I-94 between the exit to East 7th S. and the entrance from Mounds Blvd.
  • Resurfaced Hwy 61 from north of Burns Ave. to Hwy 5
  • Created trail connections at McKnight Rd. and Century Ave.
  • Updated signals and pedestrian access
  • Built a new noise wall and replace part of an existing noise wall between Conway St. and Maple St.
  • Repaired Bridges