I-94 - Bridge Repair Crossing Projects

St. Paul

Traffic impacts

Map of I-94 Bridge Work 2016
Map of I-94 Bridge Work

Current

Bridges now open: Cretin Ave, Pascal St. and Victoria St.

Ramp Closures

June 26 through Nov.
  • The Dale St. entrance ramps to both EB and WB I-94 are closed


    WB Detour: Marion St. to University Ave. to Dale St.

    EB Detour: Lexington Pkwy to University Ave. to Dale St.

Through mid-Aug

  • Prior Ave. Bridge closed and detoured


    NB Detour:
    Marshall Ave. to NB Fairview Ave. to WB University Ave.

    SB Detour: EB University Ave. to SB Fairview Ave. to WB Marshall Ave.

Note: If nighttime lane closures near the Prior Ave. bridge are required, they will begin in the evening (at 7 p.m.) of the given day through late-August.

About the I-94 bridge repair crossing projects

Summary and purpose of work

(Preliminary Schedule - dates subject to change)

I-94 between Pelham Blvd. and Dale St. (includes nine bridge projects)

  • Bridge repair work
  • Bridge resurfacing
  • Bridge inspections
  • ADA pedestrian ramps
  • Guard rail upgrades
  • Drainage improvements

Pelham Blvd. Bridge

  • Concrete repair patching
  • Resurface bridge deck

Cretin Ave. Bridge (Completed)

  • Concrete repair patching

Cleveland Ave. Bridge

  • Concrete repair patching (Spring - Summer 2016)

Prior Ave. Bridge

  • Bridge deck removal late-April 2016 through mid-August

Pascal St. Bridge (Completed)

  • Concrete repair patching
  • Closed and detoured for approx. 1 week (Spring – Summer 2016, TBD)

Hamline Ave. Bridge

  • Concrete repair patching

Lexington Ave. Bridge (Completed)

  • Concrete repair patching

Victoria St. Bridge (Completed)

  • Concrete repair patching

Dale St. Bridge

  • Concrete repair patching