Project complete
About these projects
Summary of work

I-494 between the Minnesota River and Hardman Ave. project location map.
Click map for larger version.
Minnesota River to Hardman Ave.
- I-494 bridge decks over I-35E
- Resurfaced
- Replaced joints
- Repaired I-494 pavement between 3rd Ave. and the east side of the Minnesota River bridge
- Improved drainage and construct ponds
- Replaced lighting
- Added turn lane and replaced signals at I-494 and Pilot Knob Rd.

I-494 between Blaine Ave. and Hardman Ave. project location map.
Click map for larger version.
Blaine Ave. to Hardman Ave.
- I-494 bridge deck over Concord St./Hwy 156
- Widened and resurfaced
- Replaced joints
- Constructed auxiliary lane on WB I-494 between Hardman Ave. and west of 7th Ave.
- Replaced or repaired I-494 pavement between Hardman Ave. and 5th Ave.
- Improved drainage and constructed ponds
- Constructed noise and retaining walls