Minnesota Department of Transportation

511 Travel Info

I-394 and I-494 Interchange

Plymouth, Minnetonka

Project complete

hastings bridge
Click map for larger PDF version.

Summary of work

  • Reconfigured the exit ramps to northbound I-494 and southbound I-494 from one exit to two exits
  • Extended the westbound auxiliary lane through the Plymouth Road Interchange
  • Graded and striped the road
  • Resurfaced the roadway
  • Upgraded drainage
  • Improved signage

Cost

    • $1 million Connect with us through Twitter Connect with us through YouTube Connect with us through Facebook

Contacts

Bobbie Dahlke
Public Affairs Metro District
bobbie.dahlke@state.mn.us
651-234-7503