Project complete
About this project

Click map for larger PDF version.
I-35W between 4th St. S.E. and Co. Rd. C was resurfaced in Hennepin and Ramsey Counties.
Summary of work
- Repaved I-35W from 4th St. S.E. in Minneapolis to just south of Co. Rd. C in Roseville
- Repaved ramps and frontage roads in the project area
- Replaced signals at I-35W and Industrial Blvd. and built sidewalks along Industrial Blvd. under I-35W
- Upgraded signal systems at New Brighton Blvd. and Stinson Blvd. to meet current ADA standards
- Replaced signal system at Co. Rd. B and Cleveland Ave.