I-35/I-35E Improvements

Elko, New market, Lakeville, Burnsville, Apple Valley and Eagan

Traffic impacts

See current traffic flow information in the St. Paul/Minneapolis area (mobile version).

All businesses and residences will remain accessible throughout the project. No two adjacent intersections will be closed simultaneously.

 

About this project

Summary of work

The travel lanes, shoulders, ramps and bridges along I-35 and I-35E between Elko and Eagan are in need of repairs. This project will address and improve these areas. A business liaison will work with local businesses to address specific concerns with construction.

  • Smoother ride and extended road life while reducing short-term maintenance costs
  • Updated pedestrian crossings will meet modern ADA standards
  • Drainage will be improved where needed
  • Repair and paint bridges where needed
  • Other repairs will be made under required closures to minimize any necessary inconvenience
  • Extend acceleration lane from CR 50 ramp to northbound I-35 to help improve flow. Review layout of acceleration lane extension (PDF, 2.3 MB)

Cost

  • $20 million