I-35E Bridge Repair

St. Paul

Traffic impacts

I-35E Bridge Repair project map
Click map for larger PDF version.

Current

Lane closures

May 15 through Sept. 22
  • Both NB and SB I-35E - This section of roadway will be two lanes of traffic in each direction during the duration of the project.
  • Shepard Rd. beneath I-35E will be a single lane in each direction through the duration of the project.

Future

Ramp closure

Late-summer
  • The West Seventh St. entrance ramp to SB I-35E will close an additional 15 days in the late-summer of 2017. Safety is a key concern while crews work on the I-35E bridge spanning Shepard Rd.

About the 2017 bridge repairs

Summary of work

  • Bridge repair work
  • Bridge resurfacing
  • Bridge inspection
Shepard Rd bridge
  • Concrete repair, patching and resurfacing

2016 project work - completed

  • Completed: June 6 through mid-October 2016
I-35E Bridge Repair project map
Click map for larger PDF version.

About the bridge repairs

Summary of work

  • Bridge repair work
  • Bridge resurfacing
  • Bridge inspections
  • Bridge rail upgrades (St. Clair Ave)
Ramsey St/Grand Ave. bridge
  • Concrete repaired, patched and resurfaced
Eastbound Grand Ave. bridge
  • Concrete repaired, patched and resurfaced
St. Clair Ave. bridge
  • Concrete repaired, patched and resurfaced
Randolph Ave. bridge
  • Concrete repaired, patched and resurfaced