Traffic impacts
Hwy 95/Manning Ave. project location map.
Click map for larger version.
Note: All businesses and residences will remain accessible throughout the project.
Upcoming
Information about upcoming traffic impacts will be posted as details become available. All closures are tentative and weather dependent.
About these projects
Hwy 95 between Hwy 61 and just north of I-94 at Hudson Blvd. will undergo a series of safety improvement projects from 2017 through 2021.
Summary of work
2021
Bailey Rd./Co. Rd. 18 to north of I-94 at Hudson Blvd.
- Resurface existing pavement
- Update drainage system
Completed
2019 - 2020
70th St./Co Rd. 22 to Hwy 61
- Widen Shoulders
- Construct right turn lanes at 77th, 80th, 90th, 110th St.
- Improve Sight Distance at 80th, 90th, 110th St.
- Resurface existing pavement
- Install centerline and shoulder mumble strips
- Update drainage system
2018
Bailey Rd./Co. Rd. 18 to 70th St./Co. Rd. 22
- Widen shoulders
- Construct right turn lanes at 40th, 50th, 60th Streets
- Improve Sight Distance at 60th Street
- Resurface existing pavement
- Install centerline and shoulder mumble strips
- Update drainage system
2017
Hwy 95/Manning Ave. at Valley Creek Rd.
- Constructed NB turn lanes
- Built filtration basin SW of the intersection
- Installed mumble shoulder strips
Visualizations
Project design before and after
MnDOT has a proposed view for Hwy 95 at 77th, 80th and 90th streets and for the shoulder widening.
Proposed view: Hwy 95 at 77th St. looking north
Click image for larger size.
Proposed view: Hwy 95 at 77th St. looking south
Click image for larger size.
Proposed view: Hwy 95 at 80th St.
Click image for larger size.
Proposed view: Hwy 95 at 90th St.
Click image for larger size.