Minnesota Department of Transportation

511 Travel Info

Highway 95 Road Improvement Project

Bayport, Lakeland

Traffic impacts

Hwy 95 Bayport and Lakeland project area location map

Hwy 95 project area map.

Click map for larger version.

All traffic impacts are tentative and weather dependent. Use caution when traveling through the work zone. Local access will be maintained during the duration of the project.

Current

Road closures

7 a.m. Tue, July 7 through mid-August

Lane closures

Early May through fall
  • Intermittent lane closures on Hwy 95 in both directions between 8th Ave. N and I-94
Sidewalk repairs and parking

Sidewalks in the downtown area are being repaired in many places, alternate routes will be posted when necessary. Parking on Hwy 95 between 1st Ave. S and 7th Ave. N in the downtown area will be restricted during construction.

Upcoming

Information about upcoming traffic impacts will be added as details become available. Motorists can expect narrow lanes, lane shifts and flaggers throughout construction. Two–way traffic will be maintained during most of the project work.

About this project

A five mile section of Hwy 95 between Bayport and Lakeland in Washington County will undergo a road improvement project. The work includes pavement, drainage, and pedestrian improvements.

Summary of work

  • Repair pavement
  • Update drainage
  • Upgrade sidewalks and curb ramps
  • Upgrade city utilities