Hwy 7/Louisiana Avenue Interchange

St. Louis Park

Traffic impacts

Hwy 7 St. Louis Park project map
Click map for larger PDF version.

Anticipate temporary lane closures, detours and congestion during construction.

Continue to check this site for specific traffic impacts as construction progresses.

About this project

Summary of work

  • Convert the existing intersection into an interchange
  • Construct a diamond interchange with a Hwy 7 bridge spanning Louisiana Avenue
  • Add roundabouts on Louisiana Avenue at the Lake Street and Walker Street intersections
  • Reconfigure West Lake Street and Walker Street
  • Add pedestrian and bicycle upgrades

Cost

    • $25.2 million (estimated) Connect with us through Twitter Connect with us through YouTube Connect with us through Facebook