Minnesota Department of Transportation

511 Travel Info

Highway 65

Fridley

Traffic impacts

Hwy 65 Fridley Project location map

Hwy 65 Fridley Project location map

Click map for larger PDF version.

Current

Mon, Aug. 27 through mid-October

  • Installation of new storm sewer pipe begins along SB Hwy 65 (west side of highway) between Mississippi St. and West Moore Lake Dr.
  • The West Service Dr. will be converted to a one-way road in the southbound direction. Traffic along the approximately one block area will be directed around the block to reach homes and businesses from the north.
  • Access from the West Service Dr. to 63rd Ave. will close.
  • Note: The sidewalk along the north side of West Moore Lake Dr. is closed. All pedestrian traffic should cross the road at the marked crosswalks and use the sidewalk on the south side of the road.

Upcoming

Details on upcoming traffic impacts will be provided as they become available.

 

About the storm sewer replacement project

Summary of work

  • Replace aging storm sewer pipe along the west side of Hwy 65 between 64th Ave. and West Moore Lake Dr. in Fridley.