Hwy 52 Frontage Road

Inver Grove Heights

Project Home | Accessibility and ADA | Contacts


Location

Schedule

Cost


About this project

Aerial Image of Hwy 52 in Inver Grove Heights

Aerial image of the Hwy 52 project area in Inver Grove Heights

The frontage road is a priority for MnDOT and the City of Inver Grove Heights and is part of a multi-phase plan to improve safety on this section of Hwy 52. Construction began summer 2012. The frontage road will run parallel to the west side of Hwy 52 between Concord Boulevard/County Hwy 56 and the railroad tracks on the west side of Hwy 52. Click the map to see a draft layout, or view the more detailed preliminary layout (PDF).

 