Location
- West side of Hwy 52, south of Concord Boulevard/Hwy 56 in Inver Grove Heights
Schedule
- Summer 2012
Cost
- $1.4 million
Contacts
-
Sheila Kauppi, PE
651-234-7718 -
J.P. Gillach
651-234-7503
About the Project
The frontage road is a priority for Mn/DOT and the City of Inver Grove Heights and is part of a multi-phase plan to improve safety on this section of Hwy 52. Construction is scheduled to begin in summer 2012.
The frontage road will run parallel to the west side of Hwy 52 between Concord Boulevard/County Hwy 56 and the railroad tracks on the west side of Hwy 52. Click the map to see a draft layout, or view the more detailed preliminary layout.
Benefits
- A nearly continuous frontage road system between Concord Boulevard and 117th Street, with safe access to Highway 52 through two interchanges
- Safe, convenient frontage road access to local residential and commercial properties
- Improved drainage and water quality
- Improved safety by closing two high-speed at-grade access points to Highway 52
Funding
The project will be fully funded by Mn/DOT.