Project complete

Hwy 47 resurfacing project
Click map for larger PDF version.

The majority of work impacting traffic is now complete.

Summary of work

  • Milled off part of the existing road surface
  • Replaced loop detectors
  • Repaired drainage
  • ADA and pedestrian upgrades

Cost

  • $2.5 million Connect with us through Twitter Connect with us through YouTube Connect with us through Facebook