Project complete
Hwy 3 in Farmington project map. Click map for larger PDF version.
About this project
Summary of work
- Modified access at Walnut St, Larch St. and Main St.
- Added bike trail between 194th St. and 195th St.
- Created trail access at 197th St, 200th St. and Chesterfield Way
- Resurfaced Hwy 3 between Hwy 50 in Farmington and 170th St. in Empire Township
- Updated pedestrian crossings to match current Accessibility standards
- Installed new traffic signals
Contact
Kirsten Klein
Public Affairs Metro District
kirsten.klein@state.mn.us
651-234-7506