Hwy 280

St Paul, Lauderdale and Roseville

Traffic impacts

Hwy 280 project map
Click map for larger PDF version.
  • The ramps between Hwy 280 and I-35W will be closed and detoured for a portion of the project. This will require closing Hwy 280 north of Broadway St, (6 weeks). Hwy 280 will be detoured.
  • Hwy 280 will remain open to a single lane of traffic in each direction south of Broadway St.
  • The ramp from northbound Hwy 280 to northbound I-35W will be open during Rondo Days in St. Paul on July 16th.
  • Ramps at Como Ave. and Larpenteur Ave. will close and be detoured during nearby work on Hwy 280.

More detailed schedule of project staging

About this project

Summary of work

  • Repair and resurface northbound and southbound Hwy 280 and shoulders between Como Ave. and I-35W
  • Rebuild the ramps between Hwy 280 and I-35W and adds zipper merge signs for the ramp from northbound Hwy 280 to I-35W
  • Rebuild approach roadway to the Hwy 280 bridge over Como Ave.
  • Construct concrete median barrier
  • Install new guardrail north of Larpenteur Ave.
  • Improve storm sewer system and ponds along Hwy 280

Cost

  • Approximately $3.3 million (estimated)
Do the zipper merge.