Environmental Assessment Comment period ended

The public review and comment period for MnDOT’s Environmental Assessment (EAW) was open from Mon, Oct. 23 to Wed, Nov. 29, 2017. An open house was held to review and comment on the EA on Wed, Nov. 8.

About this project

Hwy 10 project location map
Hwy 10 project location map.
Click map for larger PDF version

MnDOT will construct a third lane on EB Hwy 10 between I-35W and Co Rd 96. The project includes two noise walls being built along the south side of the EB highway. Residents who will benefit from the noise walls voted this fall.

Summary of work

  • Construct a third auxiliary lane along EB Hwy 10 between I-35W and Co Rd 96
  • Add a second lane to the ramp from SB I-35W to EB Hwy 10
  • Straighten and realign Prior Ave. to connect at a right angle to Hwy 10 at Arden Manor
  • Build a new right turn only entrance and exit between EB Hwy 10 and Arden Manor/Big Ten Tavern
  • Construct a new ramp from the EB Hwy 10 frontage road to Co Rd 96

Traffic Impacts



  • Non-peak lane closures and shoulder closures


  • TBD following project letting in July 2018