101/61 Southwest Reconnection Project

Shakopee, Chanhassen

Traffic impacts

Hwy 100 and Bass Lake Rd project map
Click map for larger PDF version.

All dates are dependent on the weather and project readiness.

Current

10 p.m. June 16 through 5 a.m. June 17

  • Installing the final pavement markings for the entire project.

About this project

Summary of work

  • Construct new bridge across the floodplain north of the Minnesota River channel to raise the roadway out of the 100-year flood elevation
  • Reconstruct the Carver Co Rd 101/Hwy 61 “Y” intersection as a roundabout, and make additional improvements along  Hwy 61
  • Reduce the frequency and duration of road closures caused by seasonal flooding of the Minnesota River Valley
  • Minimize regional and local transportation disruptions that occur when other area river crossings must be closed due to seasonal flooding
  • Minimize long-term maintenance and repair costs
  • Add a multiuse trail that will connect regional trails, a roundabout at the "Y" and additional improvements along Co Rd 61

    Map showing project staging (PDF)

Cost

  • $34 million (Hwy 101)
  • $20 million (Co Hwy 61)
  • Total = $54 million

*Cost estimate based a four-lane bridge structure over the Minnesota River floodplain (MnDOT portion). The Carver County portion is based on a roundabout centered in the existing “Y” at the north end of the project and includes additional improvements on Flying Cloud Dr. & Carver Co Rd 101 to the north. Construction costs only reported.

Funding sources

MnDOT flood Mitigation Program ($20M, LRIP, CTB, Scott and Carver Counties)

Adjacent project

Hennepin County is currently developing a project to reconstruct Flying Cloud Dr. (Co Rd 61) from Carver Co Rd 101 to Charlson Rd. For additional information, visit the Hennepin County Project Website for details.