Mn/DOT Home Mn/DOT Home "" Metro District
Getting Around
About Metro
News
Construction
Projects/Studies
Doing Business


Mn/DOT Home
FAQ
Site Map
Search
Info@DOT


Spacer Gif File511mn.org Logo

News Release

December 2, 2003

Eastbound I-494 Traffic Switch Happens Dec. 2; Expect Short-Term Single Lane


     

Roseville, Minn.—The Minnesota Department of Transportation (Mn/DOT) will reduce to a single lane eastbound I-494 between Highway 5 in EDEN PRAIRIE and Highway 169 in BLOOMINGTON at 9 a.m. Tuesday, Dec. 2.

The lane closure is necessary as crews prepare to shift traffic onto the new eastbound lanes between the two points.
Motorists also are advised of short term and intermittent lane and loop closures between the two points.

By 3 p.m. Tuesday, Dec. 2, eastbound I-494 will re-open to two lanes of traffic, and all short-term, intermittent ramp and loop closures will be concluded.

Mn/DOT urges motorists always to drive with caution and reminds them to SLOW DOWN in work zones and NEVER enter a roadway that has been blocked with barriers or cones. For updated statewide traffic, construction and travel information visit www.511mn.org.

See ORANGE.

We’re in the WORK ZONE Together

###


   

Contact:
Todd Kramascz
651/582-1465


 

Metro District
1500 County Road B2 West
Roseville, MN 55113
Office Tel: 612/582-1000