Roseville,
Minn.The Minnesota Department of Transportation (Mn/DOT)
will resume the various repair projects to northbound and southbound
I-35W between Stinson Blvd. in MINNEAPOLIS and Highway 36 in ROSEVILLE
on Tuesday, Sept. 2.
Northbound
and southbound I-35W will be reduced to two lanes between the
two points during non-rush hours on Sept. 2.
At
7 p.m. Sept. 2, two northbound and southbound lanes will remain
open, but all ramps to and from northbound and southbound I-35W,
including Industrial Blvd., St. Anthony Pkwy. and Broadway Ave.
between the two points will be CLOSED for the duration of the
project.
Weather
permitting, all lanes and ramps will re-open by the end of September.
Mn/DOT
urges motorists always to drive with caution and reminds them
to SLOW DOWN in work zones and NEVER enter a roadway that has
been blocked with barriers or cones. For updated statewide traffic,
construction and travel information visit www.511mn.org.
See
ORANGE.
We’re
in the WORK ZONE Together