Mn/DOT Home Mn/DOT Home "" Metro District
Getting Around
About Metro
News
Construction
Projects/Studies
Doing Business


Mn/DOT Home
FAQ
Site Map
Search
Info@DOT


Spacer Gif File511mn.org Logo

News Release

August 4 , 2003

Southbound I-35W Reducing to a Single Lane Overnight


     

Roseville, Minn.— The Minnesota Department of Transportation (Mn/DOT) will reduce southbound I-35W to a single lane from Highway 36 in ROSEVILLE to Stinson Blvd. in MINNEAPOLIS at 8 p.m. Monday, Aug. 4.

This lane closure is necessary as crews plane the concrete they've repaired recently and is part of the larger I-35W barrier, guardrail and road surface rehab project begun on June 16 between the two points.

Weather permitting, the lane will re-open by 5 a.m. Tuesday, Aug. 5.

The entire I-35W concrete repair and center barrier project from Stinson Blvd. to Highway 36 is scheduled for completion by Sept. 21, weather permitting. As a reminder, crews will suspend work on this project during the Minnesota State Fair, Aug. 21-Sept. 1.

Mn/DOT urges motorists always to drive with caution and reminds them to SLOW DOWN in work zones and NEVER enter a roadway that has been blocked with barriers or cones. For updated statewide traffic, construction and travel information visit www.511mn.org.

See ORANGE.

We’re in the WORK ZONE Together

###


   

Contact:
Todd Kramascz
651/582-1465


 

Metro District
1500 County Road B2 West
Roseville, MN 55113
Office Tel: 612/582-1000