Roseville,
Minn. The Minnesota Department of Transportation (Mn/DOT)
will begin installing a new traffic control signal system at Highway
13 and Mendota Heights Road in DAKOTA COUNTY at 7:30 a.m. Monday,
August 4, 2003.
Motorists
may encounter shoulder closures and possible lane closures during
construction of the new traffic control system.
Mn/DOT expects the project to be completed by September 23, 2003,
weather permitting.
Mn/DOT
urges motorists always to drive with caution and reminds them
to SLOW DOWN in work zones and NEVER enter a roadway that has
been blocked with barriers or cones. For updated statewide traffic,
construction and travel information visit www.511mn.org.
See
ORANGE.
We’re
in the WORK ZONE Together