Roseville,
Minn. The Minnesota Department of Transportation (Mn/DOT)
will CLOSE the ramp from northbound Highway 280 to northbound
I-35W and eastbound Highway 36 in ROSEVILLE on 11:30 p.m. Sunday,
July 20, 2003.
This
ramp closure is necessary as crews make repairs to the concrete
roadway surface and is part of the larger I-35W concrete repair
project from Stinson Blvd. to Highway 36.
Motorists
are advised to follow the posted detour route: eastbound
County Road B to northbound Snelling Ave.
Weather
permitting, this ramp is scheduled to re-open by Aug. 20. The
entire
I-35W concrete repair project from Stinson Blvd. to Highway 36
is scheduled for completion by Sept. 21, weather permitting.
Mn/DOT
urges motorists always to drive with caution and reminds them
to SLOW DOWN in work zones and NEVER enter a roadway that has
been blocked with barriers or cones. For updated statewide traffic,
construction and travel information visit www.511mn.org.
See
ORANGE.
We’re
in the WORK ZONE Together