The Modified Penetration Index Method can now be used for compaction acceptance of all granular materials. The Project Engineer must write a Supplemental Agreement to change the compaction method from Specified Density or the former Penetration Index Method to the Modified procedure.
Required Settings for your Excel software (7/06)
Use Microsoft Excel version 2000 or newer for forms in Excel(.xls)
Required Settings for your Excel software (7/06)
- Modified DCP Test Procedure (.doc)
- Form G&B-305 (Estimated Optimum Moisture Content)
- Fig 1 and 2
- Fig 3 - Penetration Index (mod. DCP) Form for English & Metric Bottom left Toggle
- Fig 4
- Fig 5 English
- Fig 5 Metric
- Pilot Specification (.doc)