Traffic impacts
All traffic impacts are tentative and weather dependent.

Click map for larger version.
Current
Motorists are advised to follow posted speed limits; fines are up to $300 in work zones. Reduced speed limits are in effect through November.
Road closures
Maple Grove to Rogers
Through November
- The four-way intersection at Territorial Rd. and Fletcher Ln. is reduced to a three-way intersection with a temporary signal. Access to NB Fletcher Ln. from the intersection is closed.
Lane closures
Maple Grove to Rogers
7 p.m. Fri, April 9 through 7 a.m. Sat, April 10
- WB I-94 is reduced to two lanes between Hemlock Ln. and Maple Grove Pkwy.
Fri, April 9 and Mon, April 12; 8 p.m. to 9 a.m. nightly
- WB I-94 is reduced to two lanes between Brockton Ln. and Hwy 610
Mon, April 5 through Fri, April 9; 4 a.m. to noon daily
- WB I-94 is reduced to two lanes between Brockton Ln. and west of Hwy 101
Mon, April 5 through Fri, April 9; 9 a.m. to 5 p.m. daily
- EB I-94 is reduced to two lanes between Weaver Lake Rd. and the I-94/494/694 interchange
- EB I-94 is reduced to two lanes between Hwy 101 and Weaver Lake Rd.
Mon, April 5 through Thu, April 8; 7 p.m. to 5 a.m. nightly
- EB I-94 is reduced to two lanes between Weaver Lake Rd. and the I-94/494/694 interchange
St. Michael to Albertville
Thu, April 8 through November
- Wright Co. Rd. 19 is reduced to a single lane in both directions between Wright Co. Rd. 37 and the I-94 bridge
Sun, March 28 through mid-April; nightly
- I-94 is reduced to a single lane in both directions between west of Wright Co. Rd. 19 and Hwy 241
Mon, March 29 through September
- Hwy 241 is reduced to a single lane in both directions between I-94 and Oakwood Pkwy.
Monticello to Clearwater
Sun, March 28 through May
- I-94 is reduced to a single lane in both directions between Hwy 25 and Hwy 24
- Monday through Friday from 7 p.m. to 11 a.m. nightly
- Sunday from 7 p.m. to 11 a.m. nightly
Ramp closures
Maple Grove to Rogers
10 p.m. Thu, April 8 through 5 a.m. Fri, April 9
- The loop ramp from Hwy 101 to EB I-94 is closed
- Detour: SB Hwy 101 to Co. Rd. 81 to Maple Grove Pkwy. to EB I-94
St. Michael to Albertville
Tue, April 13 through Tue, April 20
- The ramp from Hwy 241 to WB I-94 is closed
Upcoming
Information about upcoming traffic impacts will be posted as details become available.
Lane closures
Maple Grove to Rogers
Wed, April 14 from 6 p.m. to 5 a.m.
- EB I-94 is reduced to two lanes between Brockton Ln. and Hwy 610
- Note: EB I-94 is reduced to a single lane from 9 p.m. to 5 a.m.
Wed, April 14 from 7 p.m. to 10 a.m.
- WB I-94 is reduced to two lanes between Hwy 610 and Brockton Ln.
- Note: WB I-94 is reduced to a single lane from 10 p.m. to 6 a.m.
Ramp closures
St. Michael to Albertville
Mon, April 26 through mid-May
- The ramp from EB I-94 to Wright Co. Rd. 19 is closed
Lane alterations
Maple Grove to Rogers
Mon, April 19 through September
- WB I-94 lanes are separated between the I-94/494/694 interchange and Hwy 241
- Note: Motorists will need to decide which lane to take before the I-94/494/694 interchange. The left lane will be a through lane with no on/off access to local roads until Hwy 241. The two right lanes will provide local access to exits at Weaver Lake Rd., Maple Grove Pkwy., Hwy 101 and Hwy 241.