I-94 Maple Grove to Clearwater

Maple Grove, Dayton, St. Michael, Albertville, Monticello, Hasty, Clearwater

Join us!

Please join us at an upcoming open house on Thu, May 9 at the Sundance Golf Banquet Bowl.

Traffic impacts

I-94 Maple Grove to Clearwater project location map
I-94 Maple Grove to Clearwater project location map.
Click map for larger PDF version
.

Current

All traffic impacts are tentative and weather dependent.

Shoulder closures

April 8 through Fri, May 3; 7 a.m. to 3 p.m. daily
  • Shoulder of WB I-94 is closed between Fish Lake Rd. in Maple Grove and Hwy 101 in Rogers
April 8 through Fri, May 3; 9 a.m. to 5 p.m. daily
  • Shoulder of EB I-94 is closed between Hwy 101 in Rogers and Fish Lake Rd. in Maple Grove

Upcoming

Details about upcoming traffic impacts will be provided as they become available. Motorists can expect narrow, temporary lanes, reduced speeds, non-rush hour lane closures, occasional ramp closures and delays.

About this project

Four work areas in a 39-mile stretch of I-94 between Maple Grove and Clearwater to reduce congestion, improve safety, improve freight traffic, enhance economic vitality and provide a smoother ride.

Summary of work

  • Freeway reconstruction
  • Add lanes
  • Construct Dayton Parkway interchange
  • Rebuild bridges
  • Add concrete barrier

More about work done in each area

Maple Grove to Rogers (2020-2021)
  • Widen freeway shoulders to build temporary lanes in 2019
  • 9 miles of concrete resurfacing between I-494 interchange and Hwy 101
  • Add lane in each direction between Hwy 610 and Hwy 101
  • Build four noise walls in Maple Grove
Dayton Parkway interchange (2020-2021)
  • Build interchange
  • Build trail and sidewalks
St. Michael to Albertville (2019-2021)
  • Reconstruct 6 miles of freeway between Hwy 241 and Wright Co. Rd. 19
  • Reconstruct I-94 bridges over Wright Co. Rd. 19
  • Add new ramp from Co. Rd. 19 to EB I-94
  • Reconstruct Hwy 241 bridge over I-94, add new loop ramp from WB I-94 to SB Hwy 241
  • Add lane on EB I-94 between Wright Co. Rd. 19 and Hwy 241, and on WB I-94 between Hwy 241 and Wright Co. Rd. 37
  • Add raised concrete median barrier
  • Build stormwater basins to improve drainage
Monticello to Clearwater (2019-2021)
  • Reconstruct 14 miles of freeway between Hwy 25 and Hwy 24
  • Add lane in both directions
  • Add raised concrete median barrier between Hwy 25 and Wright Co. Rd. 8
  • Add cable median barrier between Hasty and Clearwater
  • Build noisewall along north side of WB I-94, west of Hwy 25
  • Add commercial vehicle weigh-in motion sensors into the new pavement
  • Improve drainage, including new water retention ponds