From To Subject Date Size
1 Eric EmbacherChris Bosak; Geoffrey Prelgo; Richard Post2783-107_ 12/29/2006 11:50:22 AM1 KB
2 Mary Grubbstpc; Daniel Dorgan; Donna Allan; Rabinder Bains; ...TPC Meeting Minutes_ 12/28/2006 12:57:06 PM0 KB
3 Paul Kivistotworke@agcmn.orgRe: 2008 Steel Plating job on I-35_ 12/28/2006 11:00:58 AM3 KB
4 Eric EmbacherRichard PostRe: SP 2783-107 Pay Item_ 12/28/2006 10:26:27 AM1 KB
5 Chris BosakRichard PostRe: SP 2783-107 Pay Item_ 12/28/2006 10:23:09 AM1 KB
6 Gary PetersonPaul KivistoRe: Fwd: Re: 2008 Steel Plating job on I-35_ 12/28/2006 10:17:50 AM6 KB
7 Richard PostEric EmbacherSP 2783-107 Pay Item_ 12/28/2006 10:14:07 AM1 KB
8 Geoffrey PrelgoChris Bosak; Tiffany KautzI35W, SP 2783-107: Redlines_ 12/28/2006 7:41:31 AM0 KB
9 Nancy LevineEric Embacher35W Repairs_ 12/27/2006 1:42:03 PM0 KB
10 Geoffrey PrelgoDennis ScottRe: Fwd: Cost of I-35W SP 2783-104_ 12/27/2006 8:56:25 AM2 KB
11 Gary PetersonDon FlemmingFwd: Re: 2008 Steel Plating job on I-35_ 12/27/2006 8:12:06 AM3 KB
12 Paul KivistoGary PetersonRe: 2008 Steel Plating job on I-35_ 12/27/2006 7:30:56 AM3 KB
13 Geoffrey PrelgoChris Bosak; Tiffany KautzI35W, SP 2783-107: Bridge / Roadway coordination..._ 12/27/2006 7:25:44 AM0 KB
14 Dennis ScottTiffany KautzCost of I-35W SP 2783-104_ 12/27/2006 7:15:44 AM0 KB
15 Gary PetersonPaul Kivisto; Steve KordoskyRe: 2008 Steel Plating job on I-35_ 12/26/2006 4:11:30 PM3 KB
16 Paul KivistoGary Peterson; Steve KordoskyRe: 2008 Steel Plating job on I-35_ 12/26/2006 2:54:38 PM2 KB
17 Steve KordoskyPaul Kivisto; Gary PetersonRe: 2008 Steel Plating job on I-35_ 12/22/2006 12:30:37 PM2 KB
18 Jerome AdamsJohn Griffith; Thomas OKeefe; Douglas.Abere@ch2m....Re: DTown Freeway - Status Items_ 12/22/2006 9:07:01 AM13 KB
19 Gary PetersonTodd NiemannFwd: Fw: Retrofit Recommendations_ 12/21/2006 4:48:49 PM2 KB
20 Douglas AbereJohn Griffith; Thomas OKeefe; Jerome AdamsDTown Freeway - Status Items_ 12/21/2006 7:55:47 AM32 KB
21 Geoffrey PrelgoEric EmbacherFwd: Re: I35W, SP 2783-107, CB Protection_ 12/20/2006 3:53:49 PM3 KB
22 Geoffrey PrelgoChris Bosak; Luis Reyes; Richard Post; Tiffany Ka...Fwd: Re: I35W, SP 2783-107, CB Protection_ 12/20/2006 1:09:20 PM3 KB
23 Geoffrey PrelgoChris BosakI35W, SP 2783-107:Tabs_ 12/20/2006 10:46:30 AM0 KB
24 Gary PetersonTim Worke; Steve KordoskyRe: 2008 Steel Plating job on I-35_ 12/20/2006 9:57:14 AM2 KB
25 Richard DaltonPamela RigenhagenPlease add Sp 2783-116 to EDMS (thanks)_ 12/20/2006 7:16:56 AM0 KB
26 Richard DaltonDeb BundeFwd: Mississippi River Bridge steel reinforcement..._ 12/20/2006 7:16:10 AM1 KB
27 Sherry NarusiewiczKathy Jennings; Jerome AdamsRe: Fwd: Project Authorization Form_ 12/20/2006 6:29:56 AM1 KB
28 Jerome AdamsDeb Bunde2783-116 Request letter for Project Managers.DOC_ 12/19/2006 3:58:49 PM0 KB
29 Jerome AdamsCynthia KrumsiegSP 2783-116 PPMS schedule_ 12/19/2006 3:27:07 PM1 KB
30 Jerome AdamsPaul Kivisto; Gary Peterson; John Griffith; Micha...Mississippi River Bridge steel reinforcement SP #_ 12/19/2006 3:18:29 PM1 KB
31 Arlen OttmanRichard PostSP 2783-107 Median Barrier Cover Plates_ 12/19/2006 1:34:47 PM1 KB
32 Kathy JenningsJohn Griffith; Jerome AdamsProject Authorization Form_ 12/19/2006 1:23:54 PM0 KB
33  DFlemming Gary PetersonFw: Retrofit Recommendations_ 12/19/2006 11:20:58 AM4 KB
34 Gary PetersonVance DesensRe: Bridge #9340_ 12/19/2006 9:21:52 AM2 KB
35 Thomas WienerEric EmbacherSP 2783-107 CPM specs_ 12/18/2006 3:07:04 PM0 KB
36 Arlen OttmanRichard PostS.P. 2783-107 - Pier Protection Barriers_ 12/18/2006 10:00:13 AM0 KB
37 Richard PostTiffany KautzFwd: S.P. 2783-107 - Pier Protection Barriers_ 12/18/2006 9:53:40 AM0 KB
38 Arlen OttmanRichard PostS.P. 2783-107 - Pier Protection Barriers_ 12/15/2006 2:25:32 PM1 KB
39 Brian GagePat Bursaw; Paul Czech; Marv LuncefordUpdated Ten Year HIP Report Template for Check in..._ 12/15/2006 8:41:24 AM1 KB
40 Gary PetersonDaniel DorganFwd: AGC Structural Steel Advise_ 12/14/2006 4:25:22 PM2 KB
41 Allan EspinozaSpecprov SpecprovSpecial Provisions Division SS, S.P. 2783-107, (T..._ 12/14/2006 2:42:16 PM0 KB
42 Bruce IrishLara AniskoffI35W from Mississippi River to Stinson _ 12/14/2006 1:41:55 PM1 KB
43 Brian GagePat Bursaw; Paul Czech; Marv LuncefordJanuary District Check-in Meeting Worksheet and P..._ 12/14/2006 11:59:35 AM4 KB
44 Richard PostArlen OttmanSP 2783-107 Median Pavement Modifications_ 12/14/2006 11:15:18 AM1 KB
45 Michael EnghTodd KramasczSP 2783-107 35W, Br and conc rehab _ 12/14/2006 9:28:49 AM0 KB
46 Brian GagePat Bursaw; Marv Lunceford10 Year HIP Worksheet_ 12/13/2006 2:54:26 PM1 KB
47 Paul KivistoGary PetersonRe: 9340 I-35W over Mississippi_ 12/13/2006 2:13:33 PM1 KB
48 Arlen OttmanChris BeckwithRe: SP 2783-9340E anti-icing spec_ 12/13/2006 7:00:36 AM1 KB
49 Marv LuncefordDan EricksonFwd: AGAIN_ 12/12/2006 1:23:08 PM0 KB
50 Matt WernetJerome AdamsBr 9340_ 12/11/2006 12:46:07 PM1 KB
51 Shawn ChambersMarv LuncefordRe: 2008-2011 ATIP_ 12/11/2006 9:26:34 AM0 KB
52 Marv LuncefordShawn Chambers2008-2011 ATIP_ 12/11/2006 8:00:50 AM0 KB
53 Karlene FrenchGeoffrey Prelgo; Eric EmbacherRe: Special Provisions for SP2783-107 TH I-35W Re..._ 12/8/2006 2:27:27 PM2 KB
54 Eric EmbacherKarlene French; Geoffrey PrelgoRe: Special Provisions for SP2783-107 TH I-35W Re..._ 12/8/2006 1:07:24 PM1 KB
55 Eric EmbacherElizabeth BenjaminFwd: Special Provisions for SP2783-107 TH I-35W R..._ 12/8/2006 1:05:10 PM0 KB
56 Jeff GibbensGlen EllisRe: Fwd: Upcoming projects_ 12/8/2006 11:55:46 AM1 KB
57 Lara AniskoffLuis ReyesTH 35W from Stinson to River_ 12/8/2006 9:14:24 AM1 KB
58 Richard PostDale Nelson; Geoffrey Prelgo2783-107 Soils Letter_ 12/8/2006 7:55:39 AM1 KB
59 Judy MelanderConf Rm WE 136; John Griffith; Kevin Walker; Beth...SP 2783-107, 2783-27873A, 2783-9340E Staging_ 12/7/2006 3:49:24 PM1 KB
60 Lisa GaughanShalini Chandra; Bridge.GWBRGPO1.GWBRGDOM@dot.sta...12/6/06 BMT Minutes_ 12/7/2006 3:16:30 PM0 KB
61 Karlene FrenchGeoffrey Prelgo; Eric EmbacherSpecial Provisions for SP2783-107 TH I-35W Revisi..._ 12/7/2006 3:11:20 PM1 KB
62 Marv LuncefordCynthia KrumsiegFwd: Re: Bridge 9340 steel reinforcement RR agree..._ 12/7/2006 1:01:40 PM1 KB
63 Cynthia KrumsiegMarv LuncefordFwd: Re: Bridge 9340 steel reinforcement RR agree..._ 12/7/2006 12:46:21 PM1 KB
64 Sherry NarusiewiczCynthia KrumsiegFwd: Re: Bridge 9340 steel reinforcement RR agree..._ 12/7/2006 12:35:15 PM0 KB
65 Geoffrey PrelgoEric EmbacherFwd: I35W, SP 2783-107:Plans_ 12/7/2006 12:24:06 PM0 KB
66 Bruce IrishLuis ReyesRe: TH 35W SP 2783-107_ 12/7/2006 12:00:06 PM0 KB
67 Bruce IrishGeoffrey Prelgopipe lining for I35W-Stinson to Mississippi River..._ 12/6/2006 3:06:21 PM2 KB
68 Lara AniskoffGeoffrey PrelgoSP 2783-107 TH 35W SWPPP_ 12/6/2006 1:30:54 PM1 KB
69 Deb BundeJerome AdamsRe: Br. 9340 steel reinforcement minutes (on I-35..._ 12/6/2006 1:22:12 PM0 KB
70 Richard DaltonDeb Bunde; Jerome AdamsRe: Br. 9340 steel reinforcement minutes (on I-35..._ 12/6/2006 12:59:43 PM1 KB
71 Michael EnghPaul Kivisto; Gary Peterson; John Griffith; Micha...Re: Br. 9340 steel reinforcement minutes_ 12/6/2006 10:55:22 AM1 KB
72 Steve Kordoskypnelson@agcmn.org; tworke@agcmn.orgAGC Structural Steel Advise_ 12/5/2006 3:50:29 PM1 KB
73 Ronald MulvaneyRichard PostRe: SP 2783-107 Median Pavement / Barrier Footing_ 12/5/2006 1:51:43 PM1 KB
74 Gary PetersonJerome AdamsRe: Br. 9340 steel reinforcement minutes_ 12/5/2006 1:39:36 PM0 KB
75 Geoffrey PrelgoJames Martin; Luis Reyes; Richard Post; Robert Wa...I35W, SP 2783-107:Plans_ 12/5/2006 1:26:01 PM1 KB
76 Jerome AdamsDavid TorfinBr. 9340 electronic survey file request_ 12/5/2006 12:17:00 PM1 KB
77 Jerome AdamsSherry Narusiewicz; Roger Schultz; Marv LuncefordBR. 9340 SP # request_ 12/5/2006 11:58:20 AM1 KB
78 Jerome AdamsPaul Kivisto; Gary Peterson; John Griffith; Micha...Br. 9340 steel reinforcement minutes_ 12/5/2006 11:54:15 AM1 KB
79 Geoffrey PrelgoMarv LuncefordFwd: Re: SP 2783-107, 2783-27873A, & 2783-9340E_ 12/5/2006 11:05:49 AM2 KB
80 Marv LuncefordJackie Fredrick; Kevin WesternFwd: Re: SP 2783-107, 2783-27873A, & 2783-9340E_ 12/5/2006 10:44:54 AM0 KB
81 Jeff GibbensMarv LuncefordRe: SP 2783-107, 2783-27873A, & 2783-9340E_ 12/5/2006 10:42:30 AM1 KB
82 Marv LuncefordJackie Fredrick; Cynthia KrumsiegRe: SP 2783-107, 2783-27873A, & 2783-9340E_ 12/5/2006 10:26:27 AM1 KB
83 Jackie FredrickCynthia Krumsieg; Marv LuncefordSP 2783-107, 2783-27873A, & 2783-9340E_ 12/5/2006 10:24:25 AM1 KB
84 Jerome AdamsRick VanwagnerBridge 9340 steel reinforcement RR agreement_ 12/5/2006 10:16:02 AM1 KB
85 Richard PostRonald MulvaneySP 2783-107 Median Pavement / Barrier Footing_ 12/5/2006 8:09:02 AM1 KB
86 Geoffrey PrelgoJames Martin; Luis Reyes; Richard Post; Robert Wa...I35W, SP 2783-107: Soils Letter_ 12/4/2006 4:10:24 PM0 KB
87 Luis ReyesRichard PostFwd: WRE scoping (2783-107)_ 12/4/2006 2:54:23 PM0 KB
88 Jeff SouthwardJackie Fredrick; Paul Kivisto; Roger Schultz; Jac...SP 2783-27873A (Bridge No. 9340)_ 12/1/2006 3:43:12 PM1 KB
89 Beth NeuendorfBruce Irish; Jerome AdamsRe: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ 12/1/2006 1:53:37 PM7 KB
90 Jeff SouthwardPaul KivistoBridge No. 9340_ 12/1/2006 12:23:40 PM1 KB
91 Jerome AdamsBeth Neuendorf; Bruce IrishRe: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ 12/1/2006 7:34:13 AM7 KB
92 Beth NeuendorfBruce Irish; Jerome AdamsRe: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ 11/30/2006 3:59:23 PM5 KB
93 Jerome AdamsBeth Neuendorf; Bruce IrishRe: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ 11/30/2006 2:33:38 PM5 KB
94 Richard DaltonJerome AdamsRe: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ 11/30/2006 2:29:56 PM4 KB
95 Nicklas TiedekenRichard DaltonRe: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ 11/30/2006 1:49:45 PM4 KB
96 Eric EmbacherGeoffrey PrelgoRe: SP 2783-107_ 11/30/2006 11:41:44 AM1 KB
97 Geoffrey PrelgoEric EmbacherRe: SP 2783-107_ 11/30/2006 11:31:49 AM1 KB
98 Jerome AdamsRichard Dalton; Bruce IrishRe: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ 11/30/2006 9:23:00 AM5 KB
99 Richard DaltonNicklas TiedekenRe: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ 11/30/2006 8:10:06 AM3 KB
100 Bruce IrishJerome AdamsRe: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ 11/29/2006 4:18:30 PM3 KB
101 Eric EmbacherGeoffrey PrelgoSP 2783-107_ 11/29/2006 12:15:59 PM0 KB
102 Jerome AdamsRichard Dalton; Bruce IrishFwd: 2783-XXX (Br. 9340 TH 35W - reinforce the st..._ 11/29/2006 11:48:19 AM2 KB
103 Richard DaltonGerry Larson2783-XXX (Br. 9340 TH 35W - reinforce the steel t..._ 11/29/2006 11:34:17 AM1 KB
104 Richard DaltonTim Marciniak; Glen Allison; Glen Ellis; Joani Ni...Scoping Database Users Group / "Blank" Purpose an..._ 11/29/2006 9:08:07 AM2 KB
105Scott HansenGeoffrey Prelgo; Robert WalzRe: I35W, SP 2783-107_ 11/28/2006 2:59:12 PM3 KB
106 Elizabeth BenjaminEric EmbacherFwd: SP 2783-107 (I35W) Recommendation Draft_ 11/28/2006 2:16:18 PM0 KB
107 Geoffrey PrelgoChris Bosak; James Martin; Luis Reyes; Robert Wal...I35W, SP 2783-107: Meeting tomorrow_ 11/28/2006 1:54:24 PM0 KB
108 Nancy LevineRichard PostBridge 27887 & 27888_ 11/28/2006 12:48:59 PM0 KB
109 Richard PostNancy LevineRe: Fwd: 35W Bridge 27893_ 11/28/2006 12:12:04 PM3 KB
110 Nancy LevineRichard PostRe: Fwd: 35W Bridge 27893_ 11/28/2006 10:02:21 AM2 KB
111 Geoffrey PrelgoJames Martin; Luis Reyes; Richard Post; Robert Wa...Fwd: SP 2783-107 (I35W) Recommendation Draft_ 11/28/2006 6:25:11 AM1 KB
112 Gary Petersondon_flemming@urscorp.comRe: Bridge No. 9340 Plating Contract_ 11/27/2006 5:27:05 PM4 KB
113 Dale NelsonGeoffrey PrelgoSP 2783-107 (I35W) Recommendation Draft_ 11/27/2006 4:02:38 PM1 KB
114 Ronald MulvaneyRichard PostRe: Final Review of Pavement Relief Joints_ 11/27/2006 3:11:26 PM2 KB
115 Gary PetersonJerome AdamsFwd: Bridge No. 9340 Plating Contract_ 11/22/2006 1:27:36 PM3 KB
116 Paul KivistoGary Peterson; Roger Schultz; Jerome AdamsRe: Br# 9340 - Steel Reinforcement Project_ 11/21/2006 8:37:58 AM2 KB
117 Geoffrey PrelgoRichard PostFwd: 35W Bridge 27893_ 11/21/2006 6:47:55 AM1 KB
118 Geoffrey PrelgoPaul KivistoRe: TH 35W bridge / Roadway coordination issues_ 11/21/2006 6:45:59 AM4 KB
119 Douglas AbereJohn Griffith; Thomas OKeefe; nicole.farrington@c...Mpls Freeway - Vision Scenario Updates_ 11/20/2006 11:07:46 AM5 KB
120 Dale NelsonLuis Reyes; Benjamin TimersonRe: TH 35W SP( 2783-107) Subsurface Drainage Syst..._ 11/20/2006 9:57:54 AM1 KB
121 Nancy LevineGeoffrey Prelgo35W Bridge 27893_ 11/17/2006 9:05:15 AM1 KB
122 Paul KivistoGeoffrey PrelgoRe: TH 35W bridge / Roadway coordination issues_ 11/17/2006 7:44:18 AM4 KB
123 Geoffrey PrelgoLuis ReyesFwd: Re: I35W, SP 2783-107:Barrier detail_ 11/16/2006 2:59:16 PM1 KB
124 Eric EmbacherGeoffrey PrelgoRe: I35W, SP 2783-107:Barrier detail_ 11/16/2006 2:57:32 PM1 KB
125 Robert WalzRichard PostFwd: New Subsurface Drains for I-35W (SP 2783-107..._ 11/16/2006 2:23:20 PM0 KB
126 Benjamin TimersonKarlene French; Geoffrey Prelgo; Dale Nelson; Cha...New Subsurface Drains for I-35W (SP 2783-107)_ 11/16/2006 2:22:15 PM1 KB
127 Eric EmbacherElizabeth Benjamin; Barry NelsonFwd: SP 2783-107, 2783-27873A, 2783-9340E Staging_ 11/16/2006 12:48:40 PM0 KB
128 Geoffrey PrelgoPaul KivistoRe: TH 35W bridge / Roadway coordination issues_ 11/16/2006 12:48:04 PM3 KB
129 Eric EmbacherJohn GriffithRe: Fwd: SP 2783-107, 2783-27873A, 2783-9340E Sta..._ 11/16/2006 12:46:58 PM0 KB
130 Geoffrey PrelgoEric EmbacherI35W, SP 2783-107:Barrier detail_ 11/16/2006 11:46:47 AM1 KB
131 John GriffithEric EmbacherFwd: SP 2783-107, 2783-27873A, 2783-9340E Staging_ 11/16/2006 11:14:40 AM0 KB
132 Paul KivistoArlen OttmanBr. #27902 Add'l work_ 11/16/2006 10:41:09 AM0 KB
133 John GriffithJeffrey Morey; Geoffrey PrelgoFwd: SP 2783-107, 2783-27873A, 2783-9340E Staging_ 11/16/2006 10:35:12 AM0 KB
134 Judy MelanderConf Rm WE 136; John Griffith; Kevin Walker; Judy...SP 2783-107, 2783-27873A, 2783-9340E Staging_ 11/16/2006 10:24:32 AM1 KB
135 Eric EmbacherRichard PostRe: Eric,_ 11/16/2006 10:13:00 AM2 KB
136 Richard PostEric EmbacherRe: Eric,_ 11/16/2006 9:48:03 AM2 KB
137 Geoffrey PrelgoEric EmbacherRe: I35W, SP 2783-107_ 11/16/2006 9:45:22 AM1 KB
138 Eric EmbacherRichard PostRe: Eric,_ 11/16/2006 9:40:19 AM1 KB
139 John GriffithJudy MelanderRe: Fwd: SP 2783-107, 2783-27873A, 2783-9340E: St..._ 11/16/2006 9:40:02 AM1 KB
140 Richard PostEric EmbacherEric,_ 11/16/2006 9:27:58 AM1 KB
141 Eric EmbacherGeoffrey PrelgoRe: I35W, SP 2783-107_ 11/16/2006 9:09:52 AM0 KB
142 Gupthan NamboodiripadBAP Contacts_Monthly ReportRE-SENDING the BAP reports for the month ending 1..._ 11/16/2006 7:14:10 AM1 KB
143 Geoffrey PrelgoJohn GriffithRe: Fwd: SP 2783-107, 2783-27873A, 2783-9340E: St..._ 11/16/2006 6:21:53 AM1 KB
144 Gupthan NamboodiripadBAP Contacts_Monthly ReportBAP October 31, 2006 month end report_ 11/15/2006 2:33:41 PM1 KB
145 Cynthia KrumsiegHeather LottRe: I35W, SP 2783-107:PPMS_ 11/15/2006 1:05:50 PM1 KB
146 Jerome AdamsJohn Griffith; Thomas OKeefe; Gregory HouckRe: FW: CS 2783 (35W) 902 Par 97 & 98 Possible re..._ 11/15/2006 11:16:31 AM3 KB
147 Heather LottCynthia KrumsiegRe: I35W, SP 2783-107:PPMS_ 11/15/2006 11:04:17 AM1 KB
148 Cynthia KrumsiegHeather Lott; Geoffrey PrelgoRe: I35W, SP 2783-107:PPMS_ 11/15/2006 10:59:47 AM1 KB
149 Geoffrey PrelgoCynthia Krumsieg; Heather LottRe: I35W, SP 2783-107:PPMS_ 11/15/2006 10:51:41 AM1 KB
150 Heather LottCynthia Krumsieg; Geoffrey PrelgoRe: I35W, SP 2783-107:PPMS_ 11/15/2006 10:48:15 AM0 KB
151 Geoffrey PrelgoEric EmbacherI35W, SP 2783-107_ 11/15/2006 10:24:22 AM0 KB
152 Cynthia KrumsiegGeoffrey PrelgoRe: I35W, SP 2783-107:PPMS_ 11/15/2006 10:18:53 AM0 KB
153 Geoffrey PrelgoCynthia KrumsiegI35W, SP 2783-107:PPMS_ 11/15/2006 10:13:16 AM0 KB
154 Thomas MerrittPaul Kivisto; Gary Peterson; Jeff Southward; Kevi...Fwd: RE: A709 Gr. 100 HPS_ 11/15/2006 8:43:24 AM1 KB
155  Wilson, Alex D. Thomas MerrittRE: A709 Gr. 100 HPS_ 11/15/2006 8:17:34 AM6 KB
156 Jerome AdamsDouglas AberePlease review 'fatalflaws'_ 11/13/2006 3:23:58 PM0 KB
157 Thomas MerrittAlex WilsonRE: A709 Gr. 100 HPS_ 11/13/2006 2:02:07 PM3 KB
158 Richard PostJames Martin; Luis Reyes; Robert WalzFwd: Re: Paving Details Median, SP 2783-107_ 11/13/2006 9:12:08 AM0 KB
159 Richard PostLuis Reyes; Robert WalzFwd: Re: Paving Details Median, SP 2783-107_ 11/13/2006 8:09:17 AM0 KB
160 Geoffrey PrelgoLuis ReyesFwd: Obtain flow rates for existing subsurface dr..._ 11/13/2006 6:59:46 AM1 KB
161 Richard PostDale NelsonFwd: Re: Paving Details Median, SP 2783-107_ 11/9/2006 9:36:52 AM1 KB
162 Geoffrey PrelgoDavid SwansonI35W, SP 2783-107_ 11/9/2006 7:30:24 AM0 KB
163 Don FlemmingScott PiersonFw: Steel Specs._ 11/8/2006 3:19:16 PM9 KB
164 Pat BursawMarv LuncefordPotential Deferrals_ 11/8/2006 11:30:13 AM0 KB
165 Gary PetersonDaniel Dorgan; Daniel DorganFwd: Fw: RFP for a monitoring system_ 11/7/2006 5:19:10 PM5 KB
166 Gary PetersonDaniel DorganFwd: Fw: RFP for a monitoring system_ 11/7/2006 5:19:10 PM5 KB
167 Ronald MulvaneyRichard PostRe: Paving Details Median, SP 2783-107_ 11/7/2006 3:03:22 PM2 KB
168 Merry DaherKeith Pence; Luane Tasa; Kelvin Howieson; Terry N...2006 FHWA bridge eligible list_ 11/7/2006 1:44:14 PM2 KB
169 Don FlemmingDaniel DorganFw: RFP for a monitoring system_ 11/7/2006 12:58:20 PM6 KB
170 Gary PetersonBruce Iwen; Paul Kivisto; James Pierce; Paul Rowe...Fwd: Current Selection List_ 11/7/2006 12:55:55 PM0 KB
171 Gary PetersonBruce Iwen; Bruce Iwen; Paul Kivisto; James Pierc...Fwd: Current Selection List_ 11/7/2006 12:55:55 PM0 KB
172 Don FlemmingDaniel DorganFw: RFP for a monitoring system_ 11/7/2006 12:05:31 PM6 KB
173 Luis ReyesJames Martin; Richard Post; Geoffrey Prelgo; Robe...TH 35W SP 2783-107_ 11/7/2006 10:01:37 AM0 KB
174 Ronald MulvaneyRichard PostRe: Paving Details Median, SP 2783-107_ 11/6/2006 2:12:41 PM1 KB
175 Dale NelsonKarlene French; Bruce Irish; Geoffrey Prelgo; Eri...Re: Fwd: SP 2783-107 I-35W Dewatering Issues_ 11/6/2006 10:55:59 AM3 KB
176 Eric EmbacherKarlene French; Bruce Irish; Geoffrey Prelgo; Dal...Re: Fwd: SP 2783-107 I-35W Dewatering Issues_ 11/6/2006 8:37:51 AM2 KB
177 Geoffrey PrelgoKarlene French; Bruce Irish; Dale Nelson; Eric Em...Fwd: SP 2783-107 I-35W Dewatering Issues_ 11/6/2006 7:02:41 AM2 KB
178 Richard PostRonald MulvaneyPaving Details Median, SP 2783-107_ 11/3/2006 3:30:22 PM1 KB
179 Karlene FrenchGeoffrey Prelgo; Eric EmbacherFwd: SP 2783-107 I-35W Dewatering Issues_ 11/3/2006 11:34:57 AM1 KB
180 Eric EmbacherElizabeth BenjaminFwd: SP 2783-107 I-35W Dewatering Issues_ 11/3/2006 8:34:31 AM0 KB
181  Wilson, Alex D. Thomas Merritt; mceleney@nsbaweb.org; moffitt@nsb...RE: A709 Gr. 100 HPS_ 11/3/2006 8:03:11 AM4 KB
182  Bill McEleney Thomas Merritt; moffitt@nsbaweb.orgRE: A709 Gr. 100 HPS_ 11/2/2006 6:08:27 PM3 KB
183 Karlene FrenchGeoffrey Prelgo; Dale Nelson; Eric EmbacherSP 2783-107 I-35W Dewatering Issues_ 11/2/2006 3:30:18 PM3 KB
184 Robert WalzGeoffrey PrelgoFwd: Re: S.P. 2783-107 Right Of Way Lines_ 11/2/2006 1:29:22 PM0 KB
185 Matt WernetRobert WalzRe: S.P. 2783-107 Right Of Way Lines_ 11/2/2006 12:39:32 PM1 KB
186 Gary PetersonJerome AdamsRe: UPDATED Br. 9340 Nov. 1, 2006 minutes_ 11/2/2006 10:57:35 AM0 KB
187 Geoffrey PrelgoScott HansenRe: S. P. 2783-107 NEW DRAIN TILE DRAWING_ 11/2/2006 10:29:45 AM2 KB
188 Scott HansenGeoffrey PrelgoRe: S. P. 2783-107 NEW DRAIN TILE DRAWING_ 11/2/2006 10:23:10 AM2 KB
189 Geoffrey PrelgoScott HansenRe: S. P. 2783-107 NEW DRAIN TILE DRAWING_ 11/2/2006 10:19:17 AM2 KB
190 Jerome AdamsPaul Kivisto; Gary Peterson; Dale Dombroske; John...UPDATED Br. 9340 Nov. 1, 2006 minutes_ 11/2/2006 9:32:33 AM1 KB
191 Eric EmbacherGeoffrey PrelgoFwd: Re: I35W, SP 2783-107:Contaminated Groundwat..._ 11/2/2006 8:49:34 AM0 KB
192 Geoffrey PrelgoEric EmbacherFwd: Re: I35W, SP 2783-107:Contaminated Groundwat..._ 11/2/2006 8:23:51 AM0 KB
193 Gary PetersonKevin Western9340 I-35W over Mississippi_ 11/1/2006 5:41:26 PM1 KB
194 Shawn ChambersMarv LuncefordFHWA STIP - Spreadsheet_ 11/1/2006 3:58:42 PM0 KB
195 Gary PetersonLarry AamodtRe: Estimated Bridge No. 9340 Replacement Cost_ 11/1/2006 3:50:20 PM3 KB
196 Larry AamodtJerome AdamsEstimated Bridge No. 9340 Replacement Cost_ 11/1/2006 2:46:54 PM3 KB
197 Robert WalzLuis ReyesFwd: S. P. 2783-107 NEW DRAIN TILE DRAWING_ 11/1/2006 1:58:45 PM0 KB
198 Geoffrey PrelgoScott HansenFwd: S. P. 2783-107 NEW DRAIN TILE DRAWING_ 11/1/2006 1:41:17 PM1 KB
199 Robert WalzJames Martin; Luis Reyes; Richard Post; Geoffrey ...Fwd: Re: S. P. 2783-107 Johnson Street alignment ..._ 10/31/2006 4:23:36 PM0 KB
200 Matt WernetRobert WalzRe: S. P. 2783-107 Johnson Street alignment data_ 10/31/2006 4:13:42 PM2 KB
201 Geoffrey PrelgoEric EmbacherFwd: Re: I35W, SP 2783-107:Contaminated Groundwat..._ 10/31/2006 1:10:49 PM1 KB
202 Eric EmbacherRichard PostRe: Eric,_ 10/31/2006 11:32:37 AM1 KB
203 Richard PostEric EmbacherEric,_ 10/31/2006 11:15:28 AM1 KB
204 Chris BeckwithRichard PostRe: 35W anti-icing system_ 10/31/2006 8:49:14 AM2 KB
205 Dale NelsonLuis Reyes; Geoffrey PrelgoI35W slope problem_ 10/30/2006 11:18:49 AM0 KB
206 Gupthan NamboodiripadGraig Gilbertson; Joseph McKinnon; Brenda Bard; T...BAP September 30, 2006 month end report_ 10/27/2006 2:18:05 PM7 KB
207 Chris BeckwithRichard PostRe: 35W anti-icing system_ 10/27/2006 11:35:23 AM1 KB
208 Chris BeckwithRichard Post35W anti-icing system_ 10/27/2006 10:26:35 AM0 KB
209 Paul NolanLuis Reyes; Dale NelsonPhotos from 35W at Johnson_ 10/24/2006 9:39:14 AM0 KB
210 Robert WalzLuis ReyesXS_ 10/23/2006 8:49:02 AM0 KB
211 Geoffrey PrelgoRichard PostFwd: Re: I35W, SP 2783-107:Drainage Structure_ 10/23/2006 7:28:53 AM1 KB
212 Geoffrey PrelgoTim SwansonI35W, SP 2783-107:Drainage Structure_ 10/23/2006 6:42:53 AM0 KB
213 Virginia CarlsonKevin Leonard; Jim Magoon; Matt AndersonRelocation Work Orders and requirements_ 10/18/2006 3:48:50 PM1 KB
214 Virginia CarlsonKevin Leonard; Kevin Leonard; Jim Magoon; Kevin L...Relocation Work Orders and requirements_ 10/18/2006 3:48:50 PM2 KB
215 Virginia CarlsonKevin Leonard; Kevin Leonard; Kevin Leonard; Kevi...Relocation Work Orders and requirements_ 10/18/2006 3:48:50 PM4 KB
216 Robert WalzScott HansenS.P. 2783-107 F/O DRAINTILE PDF_ 10/18/2006 10:31:31 AM1 KB
217 Geoffrey PrelgoEric EmbacherI35W, SP 2783-107: Estimate Construction Duration_ 10/17/2006 12:25:19 PM0 KB
218 Geoffrey PrelgoEric EmbacherRe: I35W, SP 2783-107:Contaminated Groundwater_ 10/17/2006 11:49:38 AM1 KB
219 Eric EmbacherGeoffrey PrelgoRe: I35W, SP 2783-107:Contaminated Groundwater_ 10/17/2006 8:59:11 AM1 KB
220 Geoffrey PrelgoEric EmbacherRe: I35W, SP 2783-107:Contaminated Groundwater_ 10/17/2006 8:37:58 AM0 KB
221 Eric EmbacherGeoffrey PrelgoRe: I35W, SP 2783-107:Contaminated Groundwater_ 10/17/2006 8:36:02 AM0 KB
222 Jerome AdamsThomas OKeefe; Paul Kivisto; Gary Peterson; Roger...Br. 9340 TH 35W over Mississippi River strategy_ 10/17/2006 8:31:04 AM2 KB
223 Arlen OttmanRichard PostRe: Fwd: 2783-107_ 10/17/2006 8:24:38 AM1 KB
224 Gary PetersonJerome AdamsRe: I35W Mississippi River Bridge_ 10/16/2006 4:38:51 PM1 KB
225 Jeff SouthwardGary PetersonTruss Repair Estimate for Bridge No. 9340_ 10/16/2006 4:25:10 PM0 KB
226 Don FlemmingScott PiersonSteel in Bridge 9340_ 10/16/2006 3:43:15 PM3 KB
227 Dale NelsonLuis ReyesRe: TH 35W SP 2783-107 Draintile Design_ 10/16/2006 3:02:11 PM1 KB
228 Geoffrey PrelgoEric EmbacherI35W, SP 2783-107:Contaminated Groundwater_ 10/16/2006 2:33:44 PM0 KB
229 Gary PetersonJeff SouthwardFwd: I35W Mississippi River Bridge_ 10/16/2006 9:55:16 AM1 KB
230 Geoffrey PrelgoRichard PostFwd: SP 2783-107 TH 35W AT UNIVERSITY AND AT 4TH_ 10/16/2006 6:40:59 AM1 KB
231 Eric EmbacherElizabeth BenjaminRe: Fwd: I35W, SP 2783-107: Staging near 9340_ 10/12/2006 10:58:22 AM0 KB
232 Geoffrey PrelgoArlen Ottman; Richard PostFwd: sp 2783-107 profiles_ 10/11/2006 7:07:13 AM0 KB
233 Eric EmbacherBarry NelsonFwd: I35W, SP 2783-107: Staging near 9340_ 10/10/2006 2:42:08 PM0 KB
234 Eric EmbacherElizabeth BenjaminFwd: I35W, SP 2783-107: Staging near 9340_ 10/10/2006 9:17:59 AM0 KB
235 Geoffrey PrelgoEmbacher, Eric; Kivisto, Paul; Morey, Jeffrey; Po...I35W, SP 2783-107: Staging near 9340_ 10/10/2006 9:14:37 AM1 KB
236 Geoffrey PrelgoCynthia KrumsiegRe: I35W, SP 0280-54 & SP 2783-107_ 10/10/2006 6:48:22 AM2 KB
237 David SwansonRichard PostN:\Utilities\PROJECTS\35W\2783\107_ 10/9/2006 11:53:25 AM0 KB
238 James WeingartzRobert Winter; Daniel Dorgan; DISTENG.GWADMPO1.GW...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM1 KB
239 James WeingartzRobert Winter; Robert Winter; Robert Winter; Dani...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM2 KB
240 James WeingartzRobert Winter; Daniel Dorgan; Daniel Dorgan; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM4 KB
241 James WeingartzRobert Winter; Robert Winter; Robert Winter; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM5 KB
242 James WeingartzRobert Winter; Robert Winter; Robert Winter; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM6 KB
243 James WeingartzRobert Winter; Robert Winter; Robert Winter; Dani...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM7 KB
244 James WeingartzRobert Winter; Daniel Dorgan; Daniel Dorgan; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM9 KB
245 James WeingartzRobert Winter; Robert Winter; Robert Winter; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM10 KB
246 James WeingartzRobert Winter; Robert Winter; Robert Winter; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM11 KB
247 James WeingartzRobert Winter; Robert Winter; Robert Winter; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM12 KB
248 James WeingartzRobert Winter; Robert Winter; Robert Winter; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM14 KB
249 James WeingartzRobert Winter; Robert Winter; Robert Winter; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM15 KB
250 James WeingartzRobert Winter; Robert Winter; Robert Winter; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM16 KB
251 James WeingartzRobert Winter; Robert Winter; Robert Winter; Dani...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM17 KB
252 James WeingartzRobert Winter; Daniel Dorgan; Daniel Dorgan; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM19 KB
253 James WeingartzRobert Winter; Robert Winter; Robert Winter; Robe...Letting Timeliness for FY 2006 - First Year STIP _ 10/9/2006 11:27:35 AM20 KB
254 Marv LuncefordJames AndrewTIP tables_ 10/9/2006 11:22:45 AM0 KB
255 Marv LuncefordJames AndrewTIP tables_ 10/9/2006 11:21:52 AM0 KB
256 Marv LuncefordJames AndrewRe: TIP tables_ 10/9/2006 11:18:31 AM1 KB
257 Marv LuncefordShawn ChambersRe: 3rd Year Measure - Cost_ 10/9/2006 10:06:56 AM1 KB
258 Brad LarsenRick Arnebeck; Kevin Gray; Bob McFarlin; Julie Sk...Letter of Support for I-35 Corridor of the Future..._ 10/9/2006 9:43:47 AM1 KB
259 Brad LarsenDeanna Belden; Mark Nelson; John TompkinsI-35 Corridor of the Future Application_ 10/9/2006 9:29:10 AM0 KB
260 Brad LarsenTiffany MelvinI-35 Corridor of the Future Application_ 10/9/2006 9:27:37 AM0 KB
261  Tiffany Melvin Brad Larsen; John (TGS)' 'Spacek; Skip McMahon; D...FW: ROUND THREE BEGINS_ 10/6/2006 12:49:23 PM16 KB
262 Robert WalzScott HansenRe: I35W Loop Replacement S.P. 2783-107_ 10/5/2006 10:22:20 AM1 KB
263 Cynthia KrumsiegGeoffrey PrelgoRe: I35W, SP 0280-54 & SP 2783-107_ 10/5/2006 9:52:52 AM2 KB
264 Brad LarsenTiffany MelvinRe: This just in_ 10/5/2006 9:38:47 AM12 KB
265 Cynthia KrumsiegGeoffrey PrelgoRe: I35W, SP 0280-54 & SP 2783-107_ 10/5/2006 8:55:26 AM1 KB
266 Cynthia KrumsiegGeoffrey PrelgoRe: I35W, SP 0280-54 & SP 2783-107_ 10/5/2006 8:32:59 AM1 KB
267  Tiffany Melvin Brad Larsen; Ron Achelpohl; Dale [DOT]' 'Vander S...This just in_ 10/4/2006 5:09:22 PM23 KB
268 Geoffrey PrelgoArlen OttmanFwd: 2783-107_ 10/3/2006 9:35:01 AM1 KB
269 Geoffrey PrelgoJames Martin; Luis Reyes; Richard PostFwd: Re: S.P. 2783-27873A 35W Turf/Erosion contro..._ 10/3/2006 7:41:13 AM2 KB
270 Paul KivistoRobert WalzRe: S.P. 2783-27873A 35W Turf/Erosion control pla..._ 10/2/2006 12:20:03 PM1 KB
271 Robert WalzPaul KivistoS.P. 2783-27873A 35W Turf/Erosion control plans_ 10/2/2006 10:15:58 AM1 KB
272 Arlen OttmanRichard PostRe: SP 2783-107 Elevations_ 9/29/2006 1:09:26 PM1 KB
273 Marv LuncefordJohn BeckesFY 2006_ 9/29/2006 10:56:43 AM1 KB
274 Geoffrey PrelgoJames Martin; Richard PostFwd: CORRECTION S.P. 2783-107 _ 9/28/2006 1:18:15 PM0 KB
275 Geoffrey PrelgoJames Martin; Richard PostFwd: S.P. 2783-107 Low Point Catchbasin Replaceme..._ 9/28/2006 1:17:27 PM1 KB
276 Lara AniskoffLuis Reyes; Bruce Irish; Geoffrey PrelgoCORRECTION S.P. 2783-107 _ 9/28/2006 1:11:56 PM0 KB
277 Lara AniskoffLuis Reyes; Geoffrey PrelgoS.P. 2783-107 Low Point Catchbasin Replacement on..._ 9/28/2006 1:01:46 PM1 KB
278 Shawn ChambersSteve Voss; James Bittmann; Donna Pence; Jody Mar...3rd Year Measure - Cost_ 9/27/2006 10:00:39 AM1 KB
279 Marv LuncefordShawn ChambersRe: 3rd Year Measure_ 9/27/2006 9:09:49 AM2 KB
280 Shawn ChambersMarv Lunceford3rd Year Measure_ 9/26/2006 11:55:13 AM1 KB
281 Shawn ChambersMilt Wilson; Mary Safgren; Steve Voss; James Bitt...2007-09 STIP_ 9/26/2006 10:34:34 AM1 KB
282 Cynthia KrumsiegPat Bursaw; Marv LuncefordFwd: Milestone Reports_ 9/25/2006 8:07:03 AM1 KB
283 Richard PostArlen OttmanGuardrail & Barrier Modifications at Bridges No. ..._ 9/22/2006 3:11:25 PM2 KB
284 Steve McVayCynthia KrumsiegMilestone Reports_ 9/22/2006 1:54:36 PM0 KB
285 Richard PostArlen OttmanRe: Traffic Barrier Wall 35W & University Bridges_ 9/22/2006 11:19:36 AM4 KB
286 Gupthan NamboodiripadBAP Monthly Full ReportBAP MONTHLY REPORT for the period ending 8/31/200..._ 9/22/2006 7:53:56 AM0 KB
287 Arlen OttmanRichard PostTraffic Barrier Wall 35W & University Bridges_ 9/21/2006 3:54:26 PM2 KB
288 John BeckesMarv LuncefordSTIP Project Delivery for FY 2006_ 9/21/2006 11:05:30 AM1 KB
289 Geoffrey PrelgoJames Martin; Luis Reyes; Richard Post; Robert Wa...I35W, SP 2783-107:Innovative Contracting_ 9/20/2006 12:57:05 PM2 KB
290 Paul KivistoSteve Ellis; Arlen OttmanFwd: SP 2783-107, 2783-27873A, 2783-9340E: Stagin..._ 9/20/2006 7:37:23 AM1 KB
291 Jeanne AamodtDaily Media Report; MEDIA REPORTMn/DOT Media Report_ 9/19/2006 6:02:11 PM3 KB
292 Jay HietpasEric EmbacherFw: I-35W Concrete Rehab Project_ 9/19/2006 8:18:30 AM0 KB
293  cpaof Jay HietpasRE: I-35W Concrete Rehab Project_ 9/18/2006 3:34:38 PM7 KB
294 Shawn ChambersMarv LuncefordSTIP_ 9/18/2006 3:28:54 PM0 KB
295 Ronald MulvaneyGeoffrey Prelgo; Richard Post; Dale Nelson; Doug ...Updated I-35W_ 9/18/2006 2:04:06 PM0 KB
296 Ronald MulvaneyRichard Postnew letter_ 9/18/2006 1:50:31 PM0 KB
297 Scott HansenRobert WalzRe: I35W Loop Replacement S.P. 2783-107_ 9/18/2006 12:12:32 PM2 KB
298 Robert WalzScott HansenI35W Loop Replacement S.P. 2783-107_ 9/18/2006 10:44:31 AM1 KB
299 Shawn ChambersMarv LuncefordFinal STIP_ 9/18/2006 8:51:27 AM0 KB
300 Ronald MulvaneyGeoffrey Prelgo; Richard Post; Dale Nelson; Doug ...I-35W_ 9/15/2006 3:07:38 PM0 KB
301 Jay Hietpascpaof; concrete@cpamn.com RE: I-35W Concrete Rehab Project_ 9/13/2006 12:58:12 PM4 KB
302 Dale NelsonLuis Reyes; Geoffrey PrelgoI35W slope_ 9/13/2006 12:02:51 PM0 KB
303 Edward KatzmarkMarv Lunceford2008-2011 Prelim Metro STIP sheet_ 9/13/2006 10:59:23 AM0 KB
304 Richard PostLuis Reyes; Robert WalzFwd: Re: I35W at University, 4th original plan sh..._ 9/13/2006 10:45:55 AM0 KB
305 James NelsonSophia Yang; Mary Branson; Keith Jacobson; Fred M...the old "skippy" reports_ 9/13/2006 9:16:57 AM2 KB
306 Jay HietpascpaofRE: I-35W Concrete Rehab Project_ 9/13/2006 8:05:57 AM3 KB
307 Geoffrey PrelgoRichard PostFwd: I-35W Concrete Rehab Project_ 9/12/2006 3:50:10 PM2 KB
308 Geoffrey PrelgoEric EmbacherFwd: Re: I35W, SP 2783-107: Shoulder use_ 9/12/2006 3:47:50 PM2 KB
309 Jay Hietpastworke@agcmn.org ; cpaof@cpamn....I-35W Concrete Rehab Project_ 9/12/2006 3:43:53 PM2 KB
310 Eric EmbacherElizabeth BenjaminFwd: I-35W Constructability Review_ 9/12/2006 3:36:05 PM0 KB
311 Eric EmbacherGeoffrey Prelgo; Jeffrey MoreyFwd: Re: I35W, SP 2783-107: Shoulder use_ 9/12/2006 3:32:16 PM2 KB
312 Geoffrey PrelgoRichard PostFwd: I-35W Constructability Review_ 9/12/2006 3:22:17 PM1 KB
313 Jay HietpasHietpas, Jay; Prelgo, Geoffrey; Embacher, Eric; M...I-35W Constructability Review_ 9/12/2006 3:18:51 PM1 KB
314 Eric EmbacherJay HietpasConstuctability Review_ 9/12/2006 3:09:04 PM0 KB
315 Geoffrey PrelgoEric Embacher; Jeffrey MoreyFwd: Re: I35W, SP 2783-107: Shoulder use_ 9/12/2006 2:43:16 PM2 KB
316 Dale NelsonRichard PostRe: I35W at University, 4th original plan sheets_ 9/12/2006 2:42:09 PM1 KB
317 Dale NelsonJeffrey Morey; Geoffrey PrelgoRe: I35W, SP 2783-107: Shoulder use_ 9/12/2006 1:35:38 PM2 KB
318 Geoffrey PrelgoElizabeth BuckleyRe: I35W, SP 2783-107: PIF_ 9/12/2006 10:34:28 AM1 KB
319 Chris BeckwithGeoffrey PrelgoRe: I35W, SP 2783-107: Anti-Icing_ 9/12/2006 10:06:12 AM1 KB
320 Don FlemmingScott PiersonMinutes of 9-6-06 Meeting_ 9/11/2006 5:54:53 PM2 KB
321 Marv LuncefordEdward KatzmarkSTIP_ 9/11/2006 11:06:05 AM0 KB
322 Richard PostLuis ReyesOLD 35W WASHINGTON TO 4TH ST circa 1966_ 9/11/2006 10:53:12 AM0 KB
323 Richard PostPaul KivistoTraffic Barrier Wall 35W & Uninversity, 4th Ave B..._ 9/11/2006 8:32:18 AM2 KB
324 Bob HawkinsonBee Thao; Paul Kivisto; Arlen Ottman; Gary Peters...9340 pictures_ 9/8/2006 11:58:12 AM0 KB
325 Eric EmbacherJay Hietpasconstuctability review letter_ 9/7/2006 11:06:08 AM0 KB
326 Shawn ChambersMarv LuncefordState Plan performance_ 9/7/2006 10:41:15 AM0 KB
327 Paul KivistoGeoffrey PrelgoRe: I35W, SP 2783-27873A & 2783-9340E : Cost Esti..._ 9/7/2006 9:17:32 AM1 KB
328 Thomas OKeefeJohn Griffith; Douglas Abere; Jerome AdamsRe: Mpls. Freeway Study Six Pack preview_ 9/7/2006 8:27:06 AM1 KB
329 Geoffrey PrelgoRichard PostFwd: Re: I35W, SP 2783-107:Pier Protection_ 9/7/2006 7:57:50 AM0 KB
330 Marv LuncefordCynthia KrumsiegSTIP_ 9/6/2006 2:18:28 PM0 KB
331 Cynthia KrumsiegMarv LuncefordFwd: Reasons for Delay_ 9/6/2006 1:05:20 PM1 KB
332 Steve McVayCynthia KrumsiegReasons for Delay_ 9/6/2006 10:46:02 AM0 KB
333 Jay HietpasTodd BerglandRe: Concrete Rehab Projects_ 9/6/2006 8:09:30 AM1 KB
334 Todd BerglandJay HietpasRe: Concrete Rehab Projects_ 9/6/2006 7:54:42 AM1 KB