| 1 | |  | | Eric Embacher | Chris Bosak; Geoffrey Prelgo; Richard Post | 2783-107_ | 12/29/2006 11:50:22 AM | 1 KB |
| 2 | |  |  | Mary Grubbs | tpc; Daniel Dorgan; Donna Allan; Rabinder Bains; ... | TPC Meeting Minutes_ | 12/28/2006 12:57:06 PM | 0 KB |
| 3 | |  |  | Paul Kivisto | tworke@agcmn.org | Re: 2008 Steel Plating job on I-35_ | 12/28/2006 11:00:58 AM | 3 KB |
| 4 | |  | | Eric Embacher | Richard Post | Re: SP 2783-107 Pay Item_ | 12/28/2006 10:26:27 AM | 1 KB |
| 5 | |  | | Chris Bosak | Richard Post | Re: SP 2783-107 Pay Item_ | 12/28/2006 10:23:09 AM | 1 KB |
| 6 | |  | | Gary Peterson | Paul Kivisto | Re: Fwd: Re: 2008 Steel Plating job on I-35_ | 12/28/2006 10:17:50 AM | 6 KB |
| 7 | |  | | Richard Post | Eric Embacher | SP 2783-107 Pay Item_ | 12/28/2006 10:14:07 AM | 1 KB |
| 8 | |  | | Geoffrey Prelgo | Chris Bosak; Tiffany Kautz | I35W, SP 2783-107: Redlines_ | 12/28/2006 7:41:31 AM | 0 KB |
| 9 | |  |  | Nancy Levine | Eric Embacher | 35W Repairs_ | 12/27/2006 1:42:03 PM | 0 KB |
| 10 | |  |  | Geoffrey Prelgo | Dennis Scott | Re: Fwd: Cost of I-35W SP 2783-104_ | 12/27/2006 8:56:25 AM | 2 KB |
| 11 | |  | | Gary Peterson | Don Flemming | Fwd: Re: 2008 Steel Plating job on I-35_ | 12/27/2006 8:12:06 AM | 3 KB |
| 12 | |  | | Paul Kivisto | Gary Peterson | Re: 2008 Steel Plating job on I-35_ | 12/27/2006 7:30:56 AM | 3 KB |
| 13 | |  |  | Geoffrey Prelgo | Chris Bosak; Tiffany Kautz | I35W, SP 2783-107: Bridge / Roadway coordination..._ | 12/27/2006 7:25:44 AM | 0 KB |
| 14 | |  | | Dennis Scott | Tiffany Kautz | Cost of I-35W SP 2783-104_ | 12/27/2006 7:15:44 AM | 0 KB |
| 15 | |  |  | Gary Peterson | Paul Kivisto; Steve Kordosky | Re: 2008 Steel Plating job on I-35_ | 12/26/2006 4:11:30 PM | 3 KB |
| 16 | |  |  | Paul Kivisto | Gary Peterson; Steve Kordosky | Re: 2008 Steel Plating job on I-35_ | 12/26/2006 2:54:38 PM | 2 KB |
| 17 | |  | | Steve Kordosky | Paul Kivisto; Gary Peterson | Re: 2008 Steel Plating job on I-35_ | 12/22/2006 12:30:37 PM | 2 KB |
| 18 | |  | | Jerome Adams | John Griffith; Thomas OKeefe; Douglas.Abere@ch2m.... | Re: DTown Freeway - Status Items_ | 12/22/2006 9:07:01 AM | 13 KB |
| 19 | |  |  | Gary Peterson | Todd Niemann | Fwd: Fw: Retrofit Recommendations_ | 12/21/2006 4:48:49 PM | 2 KB |
| 20 | |  |  | Douglas Abere | John Griffith; Thomas OKeefe; Jerome Adams | DTown Freeway - Status Items_ | 12/21/2006 7:55:47 AM | 32 KB |
| 21 | |  | | Geoffrey Prelgo | Eric Embacher | Fwd: Re: I35W, SP 2783-107, CB Protection_ | 12/20/2006 3:53:49 PM | 3 KB |
| 22 | |  | | Geoffrey Prelgo | Chris Bosak; Luis Reyes; Richard Post; Tiffany Ka... | Fwd: Re: I35W, SP 2783-107, CB Protection_ | 12/20/2006 1:09:20 PM | 3 KB |
| 23 | |  | | Geoffrey Prelgo | Chris Bosak | I35W, SP 2783-107:Tabs_ | 12/20/2006 10:46:30 AM | 0 KB |
| 24 | |  |  | Gary Peterson | Tim Worke; Steve Kordosky | Re: 2008 Steel Plating job on I-35_ | 12/20/2006 9:57:14 AM | 2 KB |
| 25 | |  | | Richard Dalton | Pamela Rigenhagen | Please add Sp 2783-116 to EDMS (thanks)_ | 12/20/2006 7:16:56 AM | 0 KB |
| 26 | |  |  | Richard Dalton | Deb Bunde | Fwd: Mississippi River Bridge steel reinforcement..._ | 12/20/2006 7:16:10 AM | 1 KB |
| 27 | |  | | Sherry Narusiewicz | Kathy Jennings; Jerome Adams | Re: Fwd: Project Authorization Form_ | 12/20/2006 6:29:56 AM | 1 KB |
| 28 | |  |  | Jerome Adams | Deb Bunde | 2783-116 Request letter for Project Managers.DOC_ | 12/19/2006 3:58:49 PM | 0 KB |
| 29 | |  |  | Jerome Adams | Cynthia Krumsieg | SP 2783-116 PPMS schedule_ | 12/19/2006 3:27:07 PM | 1 KB |
| 30 | |  |  | Jerome Adams | Paul Kivisto; Gary Peterson; John Griffith; Micha... | Mississippi River Bridge steel reinforcement SP #_ | 12/19/2006 3:18:29 PM | 1 KB |
| 31 | |  |  | Arlen Ottman | Richard Post | SP 2783-107 Median Barrier Cover Plates_ | 12/19/2006 1:34:47 PM | 1 KB |
| 32 | |  |  | Kathy Jennings | John Griffith; Jerome Adams | Project Authorization Form_ | 12/19/2006 1:23:54 PM | 0 KB |
| 33 | |  |  | DFlemming | Gary Peterson | Fw: Retrofit Recommendations_ | 12/19/2006 11:20:58 AM | 4 KB |
| 34 | |  | | Gary Peterson | Vance Desens | Re: Bridge #9340_ | 12/19/2006 9:21:52 AM | 2 KB |
| 35 | |  |  | Thomas Wiener | Eric Embacher | SP 2783-107 CPM specs_ | 12/18/2006 3:07:04 PM | 0 KB |
| 36 | |  |  | Arlen Ottman | Richard Post | S.P. 2783-107 - Pier Protection Barriers_ | 12/18/2006 10:00:13 AM | 0 KB |
| 37 | |  |  | Richard Post | Tiffany Kautz | Fwd: S.P. 2783-107 - Pier Protection Barriers_ | 12/18/2006 9:53:40 AM | 0 KB |
| 38 | |  |  | Arlen Ottman | Richard Post | S.P. 2783-107 - Pier Protection Barriers_ | 12/15/2006 2:25:32 PM | 1 KB |
| 39 | |  |  | Brian Gage | Pat Bursaw; Paul Czech; Marv Lunceford | Updated Ten Year HIP Report Template for Check in..._ | 12/15/2006 8:41:24 AM | 1 KB |
| 40 | |  | | Gary Peterson | Daniel Dorgan | Fwd: AGC Structural Steel Advise_ | 12/14/2006 4:25:22 PM | 2 KB |
| 41 | |  |  | Allan Espinoza | Specprov Specprov | Special Provisions Division SS, S.P. 2783-107, (T..._ | 12/14/2006 2:42:16 PM | 0 KB |
| 42 | |  | | Bruce Irish | Lara Aniskoff | I35W from Mississippi River to Stinson _ | 12/14/2006 1:41:55 PM | 1 KB |
| 43 | |  |  | Brian Gage | Pat Bursaw; Paul Czech; Marv Lunceford | January District Check-in Meeting Worksheet and P..._ | 12/14/2006 11:59:35 AM | 4 KB |
| 44 | |  |  | Richard Post | Arlen Ottman | SP 2783-107 Median Pavement Modifications_ | 12/14/2006 11:15:18 AM | 1 KB |
| 45 | |  | | Michael Engh | Todd Kramascz | SP 2783-107 35W, Br and conc rehab _ | 12/14/2006 9:28:49 AM | 0 KB |
| 46 | |  |  | Brian Gage | Pat Bursaw; Marv Lunceford | 10 Year HIP Worksheet_ | 12/13/2006 2:54:26 PM | 1 KB |
| 47 | |  | | Paul Kivisto | Gary Peterson | Re: 9340 I-35W over Mississippi_ | 12/13/2006 2:13:33 PM | 1 KB |
| 48 | |  | | Arlen Ottman | Chris Beckwith | Re: SP 2783-9340E anti-icing spec_ | 12/13/2006 7:00:36 AM | 1 KB |
| 49 | |  |  | Marv Lunceford | Dan Erickson | Fwd: AGAIN_ | 12/12/2006 1:23:08 PM | 0 KB |
| 50 | |  | | Matt Wernet | Jerome Adams | Br 9340_ | 12/11/2006 12:46:07 PM | 1 KB |
| 51 | |  |  | Shawn Chambers | Marv Lunceford | Re: 2008-2011 ATIP_ | 12/11/2006 9:26:34 AM | 0 KB |
| 52 | |  |  | Marv Lunceford | Shawn Chambers | 2008-2011 ATIP_ | 12/11/2006 8:00:50 AM | 0 KB |
| 53 | |  | | Karlene French | Geoffrey Prelgo; Eric Embacher | Re: Special Provisions for SP2783-107 TH I-35W Re..._ | 12/8/2006 2:27:27 PM | 2 KB |
| 54 | |  | | Eric Embacher | Karlene French; Geoffrey Prelgo | Re: Special Provisions for SP2783-107 TH I-35W Re..._ | 12/8/2006 1:07:24 PM | 1 KB |
| 55 | |  |  | Eric Embacher | Elizabeth Benjamin | Fwd: Special Provisions for SP2783-107 TH I-35W R..._ | 12/8/2006 1:05:10 PM | 0 KB |
| 56 | |  | | Jeff Gibbens | Glen Ellis | Re: Fwd: Upcoming projects_ | 12/8/2006 11:55:46 AM | 1 KB |
| 57 | |  | | Lara Aniskoff | Luis Reyes | TH 35W from Stinson to River_ | 12/8/2006 9:14:24 AM | 1 KB |
| 58 | |  | | Richard Post | Dale Nelson; Geoffrey Prelgo | 2783-107 Soils Letter_ | 12/8/2006 7:55:39 AM | 1 KB |
| 59 | |  | | Judy Melander | Conf Rm WE 136; John Griffith; Kevin Walker; Beth... | SP 2783-107, 2783-27873A, 2783-9340E Staging_ | 12/7/2006 3:49:24 PM | 1 KB |
| 60 | |  |  | Lisa Gaughan | Shalini Chandra; Bridge.GWBRGPO1.GWBRGDOM@dot.sta... | 12/6/06 BMT Minutes_ | 12/7/2006 3:16:30 PM | 0 KB |
| 61 | |  |  | Karlene French | Geoffrey Prelgo; Eric Embacher | Special Provisions for SP2783-107 TH I-35W Revisi..._ | 12/7/2006 3:11:20 PM | 1 KB |
| 62 | |  | | Marv Lunceford | Cynthia Krumsieg | Fwd: Re: Bridge 9340 steel reinforcement RR agree..._ | 12/7/2006 1:01:40 PM | 1 KB |
| 63 | |  |  | Cynthia Krumsieg | Marv Lunceford | Fwd: Re: Bridge 9340 steel reinforcement RR agree..._ | 12/7/2006 12:46:21 PM | 1 KB |
| 64 | |  |  | Sherry Narusiewicz | Cynthia Krumsieg | Fwd: Re: Bridge 9340 steel reinforcement RR agree..._ | 12/7/2006 12:35:15 PM | 0 KB |
| 65 | |  | | Geoffrey Prelgo | Eric Embacher | Fwd: I35W, SP 2783-107:Plans_ | 12/7/2006 12:24:06 PM | 0 KB |
| 66 | |  | | Bruce Irish | Luis Reyes | Re: TH 35W SP 2783-107_ | 12/7/2006 12:00:06 PM | 0 KB |
| 67 | |  |  | Bruce Irish | Geoffrey Prelgo | pipe lining for I35W-Stinson to Mississippi River..._ | 12/6/2006 3:06:21 PM | 2 KB |
| 68 | |  | | Lara Aniskoff | Geoffrey Prelgo | SP 2783-107 TH 35W SWPPP_ | 12/6/2006 1:30:54 PM | 1 KB |
| 69 | |  |  | Deb Bunde | Jerome Adams | Re: Br. 9340 steel reinforcement minutes (on I-35..._ | 12/6/2006 1:22:12 PM | 0 KB |
| 70 | |  |  | Richard Dalton | Deb Bunde; Jerome Adams | Re: Br. 9340 steel reinforcement minutes (on I-35..._ | 12/6/2006 12:59:43 PM | 1 KB |
| 71 | |  | | Michael Engh | Paul Kivisto; Gary Peterson; John Griffith; Micha... | Re: Br. 9340 steel reinforcement minutes_ | 12/6/2006 10:55:22 AM | 1 KB |
| 72 | |  | | Steve Kordosky | pnelson@agcmn.org; tworke@agcmn.org | AGC Structural Steel Advise_ | 12/5/2006 3:50:29 PM | 1 KB |
| 73 | |  | | Ronald Mulvaney | Richard Post | Re: SP 2783-107 Median Pavement / Barrier Footing_ | 12/5/2006 1:51:43 PM | 1 KB |
| 74 | |  | | Gary Peterson | Jerome Adams | Re: Br. 9340 steel reinforcement minutes_ | 12/5/2006 1:39:36 PM | 0 KB |
| 75 | |  | | Geoffrey Prelgo | James Martin; Luis Reyes; Richard Post; Robert Wa... | I35W, SP 2783-107:Plans_ | 12/5/2006 1:26:01 PM | 1 KB |
| 76 | |  | | Jerome Adams | David Torfin | Br. 9340 electronic survey file request_ | 12/5/2006 12:17:00 PM | 1 KB |
| 77 | |  |  | Jerome Adams | Sherry Narusiewicz; Roger Schultz; Marv Lunceford | BR. 9340 SP # request_ | 12/5/2006 11:58:20 AM | 1 KB |
| 78 | |  |  | Jerome Adams | Paul Kivisto; Gary Peterson; John Griffith; Micha... | Br. 9340 steel reinforcement minutes_ | 12/5/2006 11:54:15 AM | 1 KB |
| 79 | |  | | Geoffrey Prelgo | Marv Lunceford | Fwd: Re: SP 2783-107, 2783-27873A, & 2783-9340E_ | 12/5/2006 11:05:49 AM | 2 KB |
| 80 | |  |  | Marv Lunceford | Jackie Fredrick; Kevin Western | Fwd: Re: SP 2783-107, 2783-27873A, & 2783-9340E_ | 12/5/2006 10:44:54 AM | 0 KB |
| 81 | |  | | Jeff Gibbens | Marv Lunceford | Re: SP 2783-107, 2783-27873A, & 2783-9340E_ | 12/5/2006 10:42:30 AM | 1 KB |
| 82 | |  | | Marv Lunceford | Jackie Fredrick; Cynthia Krumsieg | Re: SP 2783-107, 2783-27873A, & 2783-9340E_ | 12/5/2006 10:26:27 AM | 1 KB |
| 83 | |  | | Jackie Fredrick | Cynthia Krumsieg; Marv Lunceford | SP 2783-107, 2783-27873A, & 2783-9340E_ | 12/5/2006 10:24:25 AM | 1 KB |
| 84 | |  |  | Jerome Adams | Rick Vanwagner | Bridge 9340 steel reinforcement RR agreement_ | 12/5/2006 10:16:02 AM | 1 KB |
| 85 | |  |  | Richard Post | Ronald Mulvaney | SP 2783-107 Median Pavement / Barrier Footing_ | 12/5/2006 8:09:02 AM | 1 KB |
| 86 | |  | | Geoffrey Prelgo | James Martin; Luis Reyes; Richard Post; Robert Wa... | I35W, SP 2783-107: Soils Letter_ | 12/4/2006 4:10:24 PM | 0 KB |
| 87 | |  |  | Luis Reyes | Richard Post | Fwd: WRE scoping (2783-107)_ | 12/4/2006 2:54:23 PM | 0 KB |
| 88 | |  |  | Jeff Southward | Jackie Fredrick; Paul Kivisto; Roger Schultz; Jac... | SP 2783-27873A (Bridge No. 9340)_ | 12/1/2006 3:43:12 PM | 1 KB |
| 89 | |  | | Beth Neuendorf | Bruce Irish; Jerome Adams | Re: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ | 12/1/2006 1:53:37 PM | 7 KB |
| 90 | |  | | Jeff Southward | Paul Kivisto | Bridge No. 9340_ | 12/1/2006 12:23:40 PM | 1 KB |
| 91 | |  | | Jerome Adams | Beth Neuendorf; Bruce Irish | Re: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ | 12/1/2006 7:34:13 AM | 7 KB |
| 92 | |  | | Beth Neuendorf | Bruce Irish; Jerome Adams | Re: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ | 11/30/2006 3:59:23 PM | 5 KB |
| 93 | |  | | Jerome Adams | Beth Neuendorf; Bruce Irish | Re: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ | 11/30/2006 2:33:38 PM | 5 KB |
| 94 | |  | | Richard Dalton | Jerome Adams | Re: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ | 11/30/2006 2:29:56 PM | 4 KB |
| 95 | |  | | Nicklas Tiedeken | Richard Dalton | Re: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ | 11/30/2006 1:49:45 PM | 4 KB |
| 96 | |  | | Eric Embacher | Geoffrey Prelgo | Re: SP 2783-107_ | 11/30/2006 11:41:44 AM | 1 KB |
| 97 | |  | | Geoffrey Prelgo | Eric Embacher | Re: SP 2783-107_ | 11/30/2006 11:31:49 AM | 1 KB |
| 98 | |  |  | Jerome Adams | Richard Dalton; Bruce Irish | Re: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ | 11/30/2006 9:23:00 AM | 5 KB |
| 99 | |  | | Richard Dalton | Nicklas Tiedeken | Re: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ | 11/30/2006 8:10:06 AM | 3 KB |
| 100 | |  | | Bruce Irish | Jerome Adams | Re: Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce th..._ | 11/29/2006 4:18:30 PM | 3 KB |
| 101 | |  | | Eric Embacher | Geoffrey Prelgo | SP 2783-107_ | 11/29/2006 12:15:59 PM | 0 KB |
| 102 | |  | | Jerome Adams | Richard Dalton; Bruce Irish | Fwd: 2783-XXX (Br. 9340 TH 35W - reinforce the st..._ | 11/29/2006 11:48:19 AM | 2 KB |
| 103 | |  | | Richard Dalton | Gerry Larson | 2783-XXX (Br. 9340 TH 35W - reinforce the steel t..._ | 11/29/2006 11:34:17 AM | 1 KB |
| 104 | |  |  | Richard Dalton | Tim Marciniak; Glen Allison; Glen Ellis; Joani Ni... | Scoping Database Users Group / "Blank" Purpose an..._ | 11/29/2006 9:08:07 AM | 2 KB |
| 105 |  |  |  | Scott Hansen | Geoffrey Prelgo; Robert Walz | Re: I35W, SP 2783-107_ | 11/28/2006 2:59:12 PM | 3 KB |
| 106 | |  |  | Elizabeth Benjamin | Eric Embacher | Fwd: SP 2783-107 (I35W) Recommendation Draft_ | 11/28/2006 2:16:18 PM | 0 KB |
| 107 | |  | | Geoffrey Prelgo | Chris Bosak; James Martin; Luis Reyes; Robert Wal... | I35W, SP 2783-107: Meeting tomorrow_ | 11/28/2006 1:54:24 PM | 0 KB |
| 108 | |  | | Nancy Levine | Richard Post | Bridge 27887 & 27888_ | 11/28/2006 12:48:59 PM | 0 KB |
| 109 | |  |  | Richard Post | Nancy Levine | Re: Fwd: 35W Bridge 27893_ | 11/28/2006 12:12:04 PM | 3 KB |
| 110 | |  | | Nancy Levine | Richard Post | Re: Fwd: 35W Bridge 27893_ | 11/28/2006 10:02:21 AM | 2 KB |
| 111 | |  |  | Geoffrey Prelgo | James Martin; Luis Reyes; Richard Post; Robert Wa... | Fwd: SP 2783-107 (I35W) Recommendation Draft_ | 11/28/2006 6:25:11 AM | 1 KB |
| 112 | |  | | Gary Peterson | don_flemming@urscorp.com | Re: Bridge No. 9340 Plating Contract_ | 11/27/2006 5:27:05 PM | 4 KB |
| 113 | |  |  | Dale Nelson | Geoffrey Prelgo | SP 2783-107 (I35W) Recommendation Draft_ | 11/27/2006 4:02:38 PM | 1 KB |
| 114 | |  | | Ronald Mulvaney | Richard Post | Re: Final Review of Pavement Relief Joints_ | 11/27/2006 3:11:26 PM | 2 KB |
| 115 | |  | | Gary Peterson | Jerome Adams | Fwd: Bridge No. 9340 Plating Contract_ | 11/22/2006 1:27:36 PM | 3 KB |
| 116 | |  | | Paul Kivisto | Gary Peterson; Roger Schultz; Jerome Adams | Re: Br# 9340 - Steel Reinforcement Project_ | 11/21/2006 8:37:58 AM | 2 KB |
| 117 | |  | | Geoffrey Prelgo | Richard Post | Fwd: 35W Bridge 27893_ | 11/21/2006 6:47:55 AM | 1 KB |
| 118 | |  | | Geoffrey Prelgo | Paul Kivisto | Re: TH 35W bridge / Roadway coordination issues_ | 11/21/2006 6:45:59 AM | 4 KB |
| 119 | |  |  | Douglas Abere | John Griffith; Thomas OKeefe; nicole.farrington@c... | Mpls Freeway - Vision Scenario Updates_ | 11/20/2006 11:07:46 AM | 5 KB |
| 120 | |  | | Dale Nelson | Luis Reyes; Benjamin Timerson | Re: TH 35W SP( 2783-107) Subsurface Drainage Syst..._ | 11/20/2006 9:57:54 AM | 1 KB |
| 121 | |  | | Nancy Levine | Geoffrey Prelgo | 35W Bridge 27893_ | 11/17/2006 9:05:15 AM | 1 KB |
| 122 | |  | | Paul Kivisto | Geoffrey Prelgo | Re: TH 35W bridge / Roadway coordination issues_ | 11/17/2006 7:44:18 AM | 4 KB |
| 123 | |  | | Geoffrey Prelgo | Luis Reyes | Fwd: Re: I35W, SP 2783-107:Barrier detail_ | 11/16/2006 2:59:16 PM | 1 KB |
| 124 | |  | | Eric Embacher | Geoffrey Prelgo | Re: I35W, SP 2783-107:Barrier detail_ | 11/16/2006 2:57:32 PM | 1 KB |
| 125 | |  |  | Robert Walz | Richard Post | Fwd: New Subsurface Drains for I-35W (SP 2783-107..._ | 11/16/2006 2:23:20 PM | 0 KB |
| 126 | |  |  | Benjamin Timerson | Karlene French; Geoffrey Prelgo; Dale Nelson; Cha... | New Subsurface Drains for I-35W (SP 2783-107)_ | 11/16/2006 2:22:15 PM | 1 KB |
| 127 | |  |  | Eric Embacher | Elizabeth Benjamin; Barry Nelson | Fwd: SP 2783-107, 2783-27873A, 2783-9340E Staging_ | 11/16/2006 12:48:40 PM | 0 KB |
| 128 | |  | | Geoffrey Prelgo | Paul Kivisto | Re: TH 35W bridge / Roadway coordination issues_ | 11/16/2006 12:48:04 PM | 3 KB |
| 129 | |  | | Eric Embacher | John Griffith | Re: Fwd: SP 2783-107, 2783-27873A, 2783-9340E Sta..._ | 11/16/2006 12:46:58 PM | 0 KB |
| 130 | |  | | Geoffrey Prelgo | Eric Embacher | I35W, SP 2783-107:Barrier detail_ | 11/16/2006 11:46:47 AM | 1 KB |
| 131 | |  |  | John Griffith | Eric Embacher | Fwd: SP 2783-107, 2783-27873A, 2783-9340E Staging_ | 11/16/2006 11:14:40 AM | 0 KB |
| 132 | |  | | Paul Kivisto | Arlen Ottman | Br. #27902 Add'l work_ | 11/16/2006 10:41:09 AM | 0 KB |
| 133 | |  |  | John Griffith | Jeffrey Morey; Geoffrey Prelgo | Fwd: SP 2783-107, 2783-27873A, 2783-9340E Staging_ | 11/16/2006 10:35:12 AM | 0 KB |
| 134 | |  | | Judy Melander | Conf Rm WE 136; John Griffith; Kevin Walker; Judy... | SP 2783-107, 2783-27873A, 2783-9340E Staging_ | 11/16/2006 10:24:32 AM | 1 KB |
| 135 | |  | | Eric Embacher | Richard Post | Re: Eric,_ | 11/16/2006 10:13:00 AM | 2 KB |
| 136 | |  | | Richard Post | Eric Embacher | Re: Eric,_ | 11/16/2006 9:48:03 AM | 2 KB |
| 137 | |  | | Geoffrey Prelgo | Eric Embacher | Re: I35W, SP 2783-107_ | 11/16/2006 9:45:22 AM | 1 KB |
| 138 | |  | | Eric Embacher | Richard Post | Re: Eric,_ | 11/16/2006 9:40:19 AM | 1 KB |
| 139 | |  |  | John Griffith | Judy Melander | Re: Fwd: SP 2783-107, 2783-27873A, 2783-9340E: St..._ | 11/16/2006 9:40:02 AM | 1 KB |
| 140 | |  |  | Richard Post | Eric Embacher | Eric,_ | 11/16/2006 9:27:58 AM | 1 KB |
| 141 | |  | | Eric Embacher | Geoffrey Prelgo | Re: I35W, SP 2783-107_ | 11/16/2006 9:09:52 AM | 0 KB |
| 142 | |  |  | Gupthan Namboodiripad | BAP Contacts_Monthly Report | RE-SENDING the BAP reports for the month ending 1..._ | 11/16/2006 7:14:10 AM | 1 KB |
| 143 | |  | | Geoffrey Prelgo | John Griffith | Re: Fwd: SP 2783-107, 2783-27873A, 2783-9340E: St..._ | 11/16/2006 6:21:53 AM | 1 KB |
| 144 | |  |  | Gupthan Namboodiripad | BAP Contacts_Monthly Report | BAP October 31, 2006 month end report_ | 11/15/2006 2:33:41 PM | 1 KB |
| 145 | |  | | Cynthia Krumsieg | Heather Lott | Re: I35W, SP 2783-107:PPMS_ | 11/15/2006 1:05:50 PM | 1 KB |
| 146 | |  |  | Jerome Adams | John Griffith; Thomas OKeefe; Gregory Houck | Re: FW: CS 2783 (35W) 902 Par 97 & 98 Possible re..._ | 11/15/2006 11:16:31 AM | 3 KB |
| 147 | |  | | Heather Lott | Cynthia Krumsieg | Re: I35W, SP 2783-107:PPMS_ | 11/15/2006 11:04:17 AM | 1 KB |
| 148 | |  | | Cynthia Krumsieg | Heather Lott; Geoffrey Prelgo | Re: I35W, SP 2783-107:PPMS_ | 11/15/2006 10:59:47 AM | 1 KB |
| 149 | |  | | Geoffrey Prelgo | Cynthia Krumsieg; Heather Lott | Re: I35W, SP 2783-107:PPMS_ | 11/15/2006 10:51:41 AM | 1 KB |
| 150 | |  | | Heather Lott | Cynthia Krumsieg; Geoffrey Prelgo | Re: I35W, SP 2783-107:PPMS_ | 11/15/2006 10:48:15 AM | 0 KB |
| 151 | |  | | Geoffrey Prelgo | Eric Embacher | I35W, SP 2783-107_ | 11/15/2006 10:24:22 AM | 0 KB |
| 152 | |  | | Cynthia Krumsieg | Geoffrey Prelgo | Re: I35W, SP 2783-107:PPMS_ | 11/15/2006 10:18:53 AM | 0 KB |
| 153 | |  | | Geoffrey Prelgo | Cynthia Krumsieg | I35W, SP 2783-107:PPMS_ | 11/15/2006 10:13:16 AM | 0 KB |
| 154 | |  |  | Thomas Merritt | Paul Kivisto; Gary Peterson; Jeff Southward; Kevi... | Fwd: RE: A709 Gr. 100 HPS_ | 11/15/2006 8:43:24 AM | 1 KB |
| 155 | |  | | Wilson, Alex D. | Thomas Merritt | RE: A709 Gr. 100 HPS_ | 11/15/2006 8:17:34 AM | 6 KB |
| 156 | |  |  | Jerome Adams | Douglas Abere | Please review 'fatalflaws'_ | 11/13/2006 3:23:58 PM | 0 KB |
| 157 | |  | | Thomas Merritt | Alex Wilson | RE: A709 Gr. 100 HPS_ | 11/13/2006 2:02:07 PM | 3 KB |
| 158 | |  |  | Richard Post | James Martin; Luis Reyes; Robert Walz | Fwd: Re: Paving Details Median, SP 2783-107_ | 11/13/2006 9:12:08 AM | 0 KB |
| 159 | |  |  | Richard Post | Luis Reyes; Robert Walz | Fwd: Re: Paving Details Median, SP 2783-107_ | 11/13/2006 8:09:17 AM | 0 KB |
| 160 | |  | | Geoffrey Prelgo | Luis Reyes | Fwd: Obtain flow rates for existing subsurface dr..._ | 11/13/2006 6:59:46 AM | 1 KB |
| 161 | |  |  | Richard Post | Dale Nelson | Fwd: Re: Paving Details Median, SP 2783-107_ | 11/9/2006 9:36:52 AM | 1 KB |
| 162 | |  | | Geoffrey Prelgo | David Swanson | I35W, SP 2783-107_ | 11/9/2006 7:30:24 AM | 0 KB |
| 163 | |  | | Don Flemming | Scott Pierson | Fw: Steel Specs._ | 11/8/2006 3:19:16 PM | 9 KB |
| 164 | |  |  | Pat Bursaw | Marv Lunceford | Potential Deferrals_ | 11/8/2006 11:30:13 AM | 0 KB |
| 165 | |  |  | Gary Peterson | Daniel Dorgan; Daniel Dorgan | Fwd: Fw: RFP for a monitoring system_ | 11/7/2006 5:19:10 PM | 5 KB |
| 166 | |  |  | Gary Peterson | Daniel Dorgan | Fwd: Fw: RFP for a monitoring system_ | 11/7/2006 5:19:10 PM | 5 KB |
| 167 | |  | | Ronald Mulvaney | Richard Post | Re: Paving Details Median, SP 2783-107_ | 11/7/2006 3:03:22 PM | 2 KB |
| 168 | |  |  | Merry Daher | Keith Pence; Luane Tasa; Kelvin Howieson; Terry N... | 2006 FHWA bridge eligible list_ | 11/7/2006 1:44:14 PM | 2 KB |
| 169 | |  |  | Don Flemming | Daniel Dorgan | Fw: RFP for a monitoring system_ | 11/7/2006 12:58:20 PM | 6 KB |
| 170 | |  |  | Gary Peterson | Bruce Iwen; Paul Kivisto; James Pierce; Paul Rowe... | Fwd: Current Selection List_ | 11/7/2006 12:55:55 PM | 0 KB |
| 171 | |  |  | Gary Peterson | Bruce Iwen; Bruce Iwen; Paul Kivisto; James Pierc... | Fwd: Current Selection List_ | 11/7/2006 12:55:55 PM | 0 KB |
| 172 | |  |  | Don Flemming | Daniel Dorgan | Fw: RFP for a monitoring system_ | 11/7/2006 12:05:31 PM | 6 KB |
| 173 | |  | | Luis Reyes | James Martin; Richard Post; Geoffrey Prelgo; Robe... | TH 35W SP 2783-107_ | 11/7/2006 10:01:37 AM | 0 KB |
| 174 | |  | | Ronald Mulvaney | Richard Post | Re: Paving Details Median, SP 2783-107_ | 11/6/2006 2:12:41 PM | 1 KB |
| 175 | |  |  | Dale Nelson | Karlene French; Bruce Irish; Geoffrey Prelgo; Eri... | Re: Fwd: SP 2783-107 I-35W Dewatering Issues_ | 11/6/2006 10:55:59 AM | 3 KB |
| 176 | |  | | Eric Embacher | Karlene French; Bruce Irish; Geoffrey Prelgo; Dal... | Re: Fwd: SP 2783-107 I-35W Dewatering Issues_ | 11/6/2006 8:37:51 AM | 2 KB |
| 177 | |  |  | Geoffrey Prelgo | Karlene French; Bruce Irish; Dale Nelson; Eric Em... | Fwd: SP 2783-107 I-35W Dewatering Issues_ | 11/6/2006 7:02:41 AM | 2 KB |
| 178 | |  |  | Richard Post | Ronald Mulvaney | Paving Details Median, SP 2783-107_ | 11/3/2006 3:30:22 PM | 1 KB |
| 179 | |  |  | Karlene French | Geoffrey Prelgo; Eric Embacher | Fwd: SP 2783-107 I-35W Dewatering Issues_ | 11/3/2006 11:34:57 AM | 1 KB |
| 180 | |  |  | Eric Embacher | Elizabeth Benjamin | Fwd: SP 2783-107 I-35W Dewatering Issues_ | 11/3/2006 8:34:31 AM | 0 KB |
| 181 | |  | | Wilson, Alex D. | Thomas Merritt; mceleney@nsbaweb.org; moffitt@nsb... | RE: A709 Gr. 100 HPS_ | 11/3/2006 8:03:11 AM | 4 KB |
| 182 | |  | | Bill McEleney | Thomas Merritt; moffitt@nsbaweb.org | RE: A709 Gr. 100 HPS_ | 11/2/2006 6:08:27 PM | 3 KB |
| 183 | |  | | Karlene French | Geoffrey Prelgo; Dale Nelson; Eric Embacher | SP 2783-107 I-35W Dewatering Issues_ | 11/2/2006 3:30:18 PM | 3 KB |
| 184 | |  |  | Robert Walz | Geoffrey Prelgo | Fwd: Re: S.P. 2783-107 Right Of Way Lines_ | 11/2/2006 1:29:22 PM | 0 KB |
| 185 | |  | | Matt Wernet | Robert Walz | Re: S.P. 2783-107 Right Of Way Lines_ | 11/2/2006 12:39:32 PM | 1 KB |
| 186 | |  | | Gary Peterson | Jerome Adams | Re: UPDATED Br. 9340 Nov. 1, 2006 minutes_ | 11/2/2006 10:57:35 AM | 0 KB |
| 187 | |  | | Geoffrey Prelgo | Scott Hansen | Re: S. P. 2783-107 NEW DRAIN TILE DRAWING_ | 11/2/2006 10:29:45 AM | 2 KB |
| 188 | |  | | Scott Hansen | Geoffrey Prelgo | Re: S. P. 2783-107 NEW DRAIN TILE DRAWING_ | 11/2/2006 10:23:10 AM | 2 KB |
| 189 | |  | | Geoffrey Prelgo | Scott Hansen | Re: S. P. 2783-107 NEW DRAIN TILE DRAWING_ | 11/2/2006 10:19:17 AM | 2 KB |
| 190 | |  |  | Jerome Adams | Paul Kivisto; Gary Peterson; Dale Dombroske; John... | UPDATED Br. 9340 Nov. 1, 2006 minutes_ | 11/2/2006 9:32:33 AM | 1 KB |
| 191 | |  | | Eric Embacher | Geoffrey Prelgo | Fwd: Re: I35W, SP 2783-107:Contaminated Groundwat..._ | 11/2/2006 8:49:34 AM | 0 KB |
| 192 | |  |  | Geoffrey Prelgo | Eric Embacher | Fwd: Re: I35W, SP 2783-107:Contaminated Groundwat..._ | 11/2/2006 8:23:51 AM | 0 KB |
| 193 | |  | | Gary Peterson | Kevin Western | 9340 I-35W over Mississippi_ | 11/1/2006 5:41:26 PM | 1 KB |
| 194 | |  |  | Shawn Chambers | Marv Lunceford | FHWA STIP - Spreadsheet_ | 11/1/2006 3:58:42 PM | 0 KB |
| 195 | |  | | Gary Peterson | Larry Aamodt | Re: Estimated Bridge No. 9340 Replacement Cost_ | 11/1/2006 3:50:20 PM | 3 KB |
| 196 | |  |  | Larry Aamodt | Jerome Adams | Estimated Bridge No. 9340 Replacement Cost_ | 11/1/2006 2:46:54 PM | 3 KB |
| 197 | |  |  | Robert Walz | Luis Reyes | Fwd: S. P. 2783-107 NEW DRAIN TILE DRAWING_ | 11/1/2006 1:58:45 PM | 0 KB |
| 198 | |  |  | Geoffrey Prelgo | Scott Hansen | Fwd: S. P. 2783-107 NEW DRAIN TILE DRAWING_ | 11/1/2006 1:41:17 PM | 1 KB |
| 199 | |  |  | Robert Walz | James Martin; Luis Reyes; Richard Post; Geoffrey ... | Fwd: Re: S. P. 2783-107 Johnson Street alignment ..._ | 10/31/2006 4:23:36 PM | 0 KB |
| 200 | |  | | Matt Wernet | Robert Walz | Re: S. P. 2783-107 Johnson Street alignment data_ | 10/31/2006 4:13:42 PM | 2 KB |
| 201 | |  |  | Geoffrey Prelgo | Eric Embacher | Fwd: Re: I35W, SP 2783-107:Contaminated Groundwat..._ | 10/31/2006 1:10:49 PM | 1 KB |
| 202 | |  | | Eric Embacher | Richard Post | Re: Eric,_ | 10/31/2006 11:32:37 AM | 1 KB |
| 203 | |  | | Richard Post | Eric Embacher | Eric,_ | 10/31/2006 11:15:28 AM | 1 KB |
| 204 | |  | | Chris Beckwith | Richard Post | Re: 35W anti-icing system_ | 10/31/2006 8:49:14 AM | 2 KB |
| 205 | |  |  | Dale Nelson | Luis Reyes; Geoffrey Prelgo | I35W slope problem_ | 10/30/2006 11:18:49 AM | 0 KB |
| 206 | |  |  | Gupthan Namboodiripad | Graig Gilbertson; Joseph McKinnon; Brenda Bard; T... | BAP September 30, 2006 month end report_ | 10/27/2006 2:18:05 PM | 7 KB |
| 207 | |  | | Chris Beckwith | Richard Post | Re: 35W anti-icing system_ | 10/27/2006 11:35:23 AM | 1 KB |
| 208 | |  | | Chris Beckwith | Richard Post | 35W anti-icing system_ | 10/27/2006 10:26:35 AM | 0 KB |
| 209 | |  |  | Paul Nolan | Luis Reyes; Dale Nelson | Photos from 35W at Johnson_ | 10/24/2006 9:39:14 AM | 0 KB |
| 210 | |  | | Robert Walz | Luis Reyes | XS_ | 10/23/2006 8:49:02 AM | 0 KB |
| 211 | |  | | Geoffrey Prelgo | Richard Post | Fwd: Re: I35W, SP 2783-107:Drainage Structure_ | 10/23/2006 7:28:53 AM | 1 KB |
| 212 | |  | | Geoffrey Prelgo | Tim Swanson | I35W, SP 2783-107:Drainage Structure_ | 10/23/2006 6:42:53 AM | 0 KB |
| 213 | |  |  | Virginia Carlson | Kevin Leonard; Jim Magoon; Matt Anderson | Relocation Work Orders and requirements_ | 10/18/2006 3:48:50 PM | 1 KB |
| 214 | |  |  | Virginia Carlson | Kevin Leonard; Kevin Leonard; Jim Magoon; Kevin L... | Relocation Work Orders and requirements_ | 10/18/2006 3:48:50 PM | 2 KB |
| 215 | |  |  | Virginia Carlson | Kevin Leonard; Kevin Leonard; Kevin Leonard; Kevi... | Relocation Work Orders and requirements_ | 10/18/2006 3:48:50 PM | 4 KB |
| 216 | |  |  | Robert Walz | Scott Hansen | S.P. 2783-107 F/O DRAINTILE PDF_ | 10/18/2006 10:31:31 AM | 1 KB |
| 217 | |  | | Geoffrey Prelgo | Eric Embacher | I35W, SP 2783-107: Estimate Construction Duration_ | 10/17/2006 12:25:19 PM | 0 KB |
| 218 | |  | | Geoffrey Prelgo | Eric Embacher | Re: I35W, SP 2783-107:Contaminated Groundwater_ | 10/17/2006 11:49:38 AM | 1 KB |
| 219 | |  | | Eric Embacher | Geoffrey Prelgo | Re: I35W, SP 2783-107:Contaminated Groundwater_ | 10/17/2006 8:59:11 AM | 1 KB |
| 220 | |  | | Geoffrey Prelgo | Eric Embacher | Re: I35W, SP 2783-107:Contaminated Groundwater_ | 10/17/2006 8:37:58 AM | 0 KB |
| 221 | |  | | Eric Embacher | Geoffrey Prelgo | Re: I35W, SP 2783-107:Contaminated Groundwater_ | 10/17/2006 8:36:02 AM | 0 KB |
| 222 | |  |  | Jerome Adams | Thomas OKeefe; Paul Kivisto; Gary Peterson; Roger... | Br. 9340 TH 35W over Mississippi River strategy_ | 10/17/2006 8:31:04 AM | 2 KB |
| 223 | |  |  | Arlen Ottman | Richard Post | Re: Fwd: 2783-107_ | 10/17/2006 8:24:38 AM | 1 KB |
| 224 | |  |  | Gary Peterson | Jerome Adams | Re: I35W Mississippi River Bridge_ | 10/16/2006 4:38:51 PM | 1 KB |
| 225 | |  |  | Jeff Southward | Gary Peterson | Truss Repair Estimate for Bridge No. 9340_ | 10/16/2006 4:25:10 PM | 0 KB |
| 226 | |  | | Don Flemming | Scott Pierson | Steel in Bridge 9340_ | 10/16/2006 3:43:15 PM | 3 KB |
| 227 | |  | | Dale Nelson | Luis Reyes | Re: TH 35W SP 2783-107 Draintile Design_ | 10/16/2006 3:02:11 PM | 1 KB |
| 228 | |  |  | Geoffrey Prelgo | Eric Embacher | I35W, SP 2783-107:Contaminated Groundwater_ | 10/16/2006 2:33:44 PM | 0 KB |
| 229 | |  |  | Gary Peterson | Jeff Southward | Fwd: I35W Mississippi River Bridge_ | 10/16/2006 9:55:16 AM | 1 KB |
| 230 | |  |  | Geoffrey Prelgo | Richard Post | Fwd: SP 2783-107 TH 35W AT UNIVERSITY AND AT 4TH_ | 10/16/2006 6:40:59 AM | 1 KB |
| 231 | |  | | Eric Embacher | Elizabeth Benjamin | Re: Fwd: I35W, SP 2783-107: Staging near 9340_ | 10/12/2006 10:58:22 AM | 0 KB |
| 232 | |  | | Geoffrey Prelgo | Arlen Ottman; Richard Post | Fwd: sp 2783-107 profiles_ | 10/11/2006 7:07:13 AM | 0 KB |
| 233 | |  |  | Eric Embacher | Barry Nelson | Fwd: I35W, SP 2783-107: Staging near 9340_ | 10/10/2006 2:42:08 PM | 0 KB |
| 234 | |  |  | Eric Embacher | Elizabeth Benjamin | Fwd: I35W, SP 2783-107: Staging near 9340_ | 10/10/2006 9:17:59 AM | 0 KB |
| 235 | |  | | Geoffrey Prelgo | Embacher, Eric; Kivisto, Paul; Morey, Jeffrey; Po... | I35W, SP 2783-107: Staging near 9340_ | 10/10/2006 9:14:37 AM | 1 KB |
| 236 | |  | | Geoffrey Prelgo | Cynthia Krumsieg | Re: I35W, SP 0280-54 & SP 2783-107_ | 10/10/2006 6:48:22 AM | 2 KB |
| 237 | |  | | David Swanson | Richard Post | N:\Utilities\PROJECTS\35W\2783\107_ | 10/9/2006 11:53:25 AM | 0 KB |
| 238 | |  |  | James Weingartz | Robert Winter; Daniel Dorgan; DISTENG.GWADMPO1.GW... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 1 KB |
| 239 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Dani... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 2 KB |
| 240 | |  |  | James Weingartz | Robert Winter; Daniel Dorgan; Daniel Dorgan; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 4 KB |
| 241 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 5 KB |
| 242 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 6 KB |
| 243 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Dani... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 7 KB |
| 244 | |  |  | James Weingartz | Robert Winter; Daniel Dorgan; Daniel Dorgan; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 9 KB |
| 245 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 10 KB |
| 246 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 11 KB |
| 247 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 12 KB |
| 248 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 14 KB |
| 249 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 15 KB |
| 250 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 16 KB |
| 251 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Dani... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 17 KB |
| 252 | |  |  | James Weingartz | Robert Winter; Daniel Dorgan; Daniel Dorgan; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 19 KB |
| 253 | |  |  | James Weingartz | Robert Winter; Robert Winter; Robert Winter; Robe... | Letting Timeliness for FY 2006 - First Year STIP _ | 10/9/2006 11:27:35 AM | 20 KB |
| 254 | |  |  | Marv Lunceford | James Andrew | TIP tables_ | 10/9/2006 11:22:45 AM | 0 KB |
| 255 | |  |  | Marv Lunceford | James Andrew | TIP tables_ | 10/9/2006 11:21:52 AM | 0 KB |
| 256 | |  |  | Marv Lunceford | James Andrew | Re: TIP tables_ | 10/9/2006 11:18:31 AM | 1 KB |
| 257 | |  |  | Marv Lunceford | Shawn Chambers | Re: 3rd Year Measure - Cost_ | 10/9/2006 10:06:56 AM | 1 KB |
| 258 | |  |  | Brad Larsen | Rick Arnebeck; Kevin Gray; Bob McFarlin; Julie Sk... | Letter of Support for I-35 Corridor of the Future..._ | 10/9/2006 9:43:47 AM | 1 KB |
| 259 | |  |  | Brad Larsen | Deanna Belden; Mark Nelson; John Tompkins | I-35 Corridor of the Future Application_ | 10/9/2006 9:29:10 AM | 0 KB |
| 260 | |  |  | Brad Larsen | Tiffany Melvin | I-35 Corridor of the Future Application_ | 10/9/2006 9:27:37 AM | 0 KB |
| 261 | |  |  | Tiffany Melvin | Brad Larsen; John (TGS)' 'Spacek; Skip McMahon; D... | FW: ROUND THREE BEGINS_ | 10/6/2006 12:49:23 PM | 16 KB |
| 262 | |  | | Robert Walz | Scott Hansen | Re: I35W Loop Replacement S.P. 2783-107_ | 10/5/2006 10:22:20 AM | 1 KB |
| 263 | |  | | Cynthia Krumsieg | Geoffrey Prelgo | Re: I35W, SP 0280-54 & SP 2783-107_ | 10/5/2006 9:52:52 AM | 2 KB |
| 264 | |  | | Brad Larsen | Tiffany Melvin | Re: This just in_ | 10/5/2006 9:38:47 AM | 12 KB |
| 265 | |  | | Cynthia Krumsieg | Geoffrey Prelgo | Re: I35W, SP 0280-54 & SP 2783-107_ | 10/5/2006 8:55:26 AM | 1 KB |
| 266 | |  | | Cynthia Krumsieg | Geoffrey Prelgo | Re: I35W, SP 0280-54 & SP 2783-107_ | 10/5/2006 8:32:59 AM | 1 KB |
| 267 | |  | | Tiffany Melvin | Brad Larsen; Ron Achelpohl; Dale [DOT]' 'Vander S... | This just in_ | 10/4/2006 5:09:22 PM | 23 KB |
| 268 | |  | | Geoffrey Prelgo | Arlen Ottman | Fwd: 2783-107_ | 10/3/2006 9:35:01 AM | 1 KB |
| 269 | |  |  | Geoffrey Prelgo | James Martin; Luis Reyes; Richard Post | Fwd: Re: S.P. 2783-27873A 35W Turf/Erosion contro..._ | 10/3/2006 7:41:13 AM | 2 KB |
| 270 | |  | | Paul Kivisto | Robert Walz | Re: S.P. 2783-27873A 35W Turf/Erosion control pla..._ | 10/2/2006 12:20:03 PM | 1 KB |
| 271 | |  | | Robert Walz | Paul Kivisto | S.P. 2783-27873A 35W Turf/Erosion control plans_ | 10/2/2006 10:15:58 AM | 1 KB |
| 272 | |  | | Arlen Ottman | Richard Post | Re: SP 2783-107 Elevations_ | 9/29/2006 1:09:26 PM | 1 KB |
| 273 | |  |  | Marv Lunceford | John Beckes | FY 2006_ | 9/29/2006 10:56:43 AM | 1 KB |
| 274 | |  | | Geoffrey Prelgo | James Martin; Richard Post | Fwd: CORRECTION S.P. 2783-107 _ | 9/28/2006 1:18:15 PM | 0 KB |
| 275 | |  |  | Geoffrey Prelgo | James Martin; Richard Post | Fwd: S.P. 2783-107 Low Point Catchbasin Replaceme..._ | 9/28/2006 1:17:27 PM | 1 KB |
| 276 | |  | | Lara Aniskoff | Luis Reyes; Bruce Irish; Geoffrey Prelgo | CORRECTION S.P. 2783-107 _ | 9/28/2006 1:11:56 PM | 0 KB |
| 277 | |  |  | Lara Aniskoff | Luis Reyes; Geoffrey Prelgo | S.P. 2783-107 Low Point Catchbasin Replacement on..._ | 9/28/2006 1:01:46 PM | 1 KB |
| 278 | |  |  | Shawn Chambers | Steve Voss; James Bittmann; Donna Pence; Jody Mar... | 3rd Year Measure - Cost_ | 9/27/2006 10:00:39 AM | 1 KB |
| 279 | |  | | Marv Lunceford | Shawn Chambers | Re: 3rd Year Measure_ | 9/27/2006 9:09:49 AM | 2 KB |
| 280 | |  | | Shawn Chambers | Marv Lunceford | 3rd Year Measure_ | 9/26/2006 11:55:13 AM | 1 KB |
| 281 | |  |  | Shawn Chambers | Milt Wilson; Mary Safgren; Steve Voss; James Bitt... | 2007-09 STIP_ | 9/26/2006 10:34:34 AM | 1 KB |
| 282 | |  |  | Cynthia Krumsieg | Pat Bursaw; Marv Lunceford | Fwd: Milestone Reports_ | 9/25/2006 8:07:03 AM | 1 KB |
| 283 | |  |  | Richard Post | Arlen Ottman | Guardrail & Barrier Modifications at Bridges No. ..._ | 9/22/2006 3:11:25 PM | 2 KB |
| 284 | |  |  | Steve McVay | Cynthia Krumsieg | Milestone Reports_ | 9/22/2006 1:54:36 PM | 0 KB |
| 285 | |  |  | Richard Post | Arlen Ottman | Re: Traffic Barrier Wall 35W & University Bridges_ | 9/22/2006 11:19:36 AM | 4 KB |
| 286 | |  |  | Gupthan Namboodiripad | BAP Monthly Full Report | BAP MONTHLY REPORT for the period ending 8/31/200..._ | 9/22/2006 7:53:56 AM | 0 KB |
| 287 | |  |  | Arlen Ottman | Richard Post | Traffic Barrier Wall 35W & University Bridges_ | 9/21/2006 3:54:26 PM | 2 KB |
| 288 | |  |  | John Beckes | Marv Lunceford | STIP Project Delivery for FY 2006_ | 9/21/2006 11:05:30 AM | 1 KB |
| 289 | |  | | Geoffrey Prelgo | James Martin; Luis Reyes; Richard Post; Robert Wa... | I35W, SP 2783-107:Innovative Contracting_ | 9/20/2006 12:57:05 PM | 2 KB |
| 290 | |  | | Paul Kivisto | Steve Ellis; Arlen Ottman | Fwd: SP 2783-107, 2783-27873A, 2783-9340E: Stagin..._ | 9/20/2006 7:37:23 AM | 1 KB |
| 291 | |  | | Jeanne Aamodt | Daily Media Report; MEDIA REPORT | Mn/DOT Media Report_ | 9/19/2006 6:02:11 PM | 3 KB |
| 292 | |  |  | Jay Hietpas | Eric Embacher | Fw: I-35W Concrete Rehab Project_ | 9/19/2006 8:18:30 AM | 0 KB |
| 293 | |  | | cpaof | Jay Hietpas | RE: I-35W Concrete Rehab Project_ | 9/18/2006 3:34:38 PM | 7 KB |
| 294 | |  |  | Shawn Chambers | Marv Lunceford | STIP_ | 9/18/2006 3:28:54 PM | 0 KB |
| 295 | |  |  | Ronald Mulvaney | Geoffrey Prelgo; Richard Post; Dale Nelson; Doug ... | Updated I-35W_ | 9/18/2006 2:04:06 PM | 0 KB |
| 296 | |  |  | Ronald Mulvaney | Richard Post | new letter_ | 9/18/2006 1:50:31 PM | 0 KB |
| 297 | |  | | Scott Hansen | Robert Walz | Re: I35W Loop Replacement S.P. 2783-107_ | 9/18/2006 12:12:32 PM | 2 KB |
| 298 | |  | | Robert Walz | Scott Hansen | I35W Loop Replacement S.P. 2783-107_ | 9/18/2006 10:44:31 AM | 1 KB |
| 299 | |  |  | Shawn Chambers | Marv Lunceford | Final STIP_ | 9/18/2006 8:51:27 AM | 0 KB |
| 300 | |  |  | Ronald Mulvaney | Geoffrey Prelgo; Richard Post; Dale Nelson; Doug ... | I-35W_ | 9/15/2006 3:07:38 PM | 0 KB |
| 301 | |  | | Jay Hietpas | cpaof; concrete@cpamn.com | RE: I-35W Concrete Rehab Project_ | 9/13/2006 12:58:12 PM | 4 KB |
| 302 | |  |  | Dale Nelson | Luis Reyes; Geoffrey Prelgo | I35W slope_ | 9/13/2006 12:02:51 PM | 0 KB |
| 303 | |  |  | Edward Katzmark | Marv Lunceford | 2008-2011 Prelim Metro STIP sheet_ | 9/13/2006 10:59:23 AM | 0 KB |
| 304 | |  |  | Richard Post | Luis Reyes; Robert Walz | Fwd: Re: I35W at University, 4th original plan sh..._ | 9/13/2006 10:45:55 AM | 0 KB |
| 305 | |  |  | James Nelson | Sophia Yang; Mary Branson; Keith Jacobson; Fred M... | the old "skippy" reports_ | 9/13/2006 9:16:57 AM | 2 KB |
| 306 | |  | | Jay Hietpas | cpaof | RE: I-35W Concrete Rehab Project_ | 9/13/2006 8:05:57 AM | 3 KB |
| 307 | |  |  | Geoffrey Prelgo | Richard Post | Fwd: I-35W Concrete Rehab Project_ | 9/12/2006 3:50:10 PM | 2 KB |
| 308 | |  | | Geoffrey Prelgo | Eric Embacher | Fwd: Re: I35W, SP 2783-107: Shoulder use_ | 9/12/2006 3:47:50 PM | 2 KB |
| 309 | |  |  | Jay Hietpas | tworke@agcmn.org ; cpaof@cpamn.... | I-35W Concrete Rehab Project_ | 9/12/2006 3:43:53 PM | 2 KB |
| 310 | |  |  | Eric Embacher | Elizabeth Benjamin | Fwd: I-35W Constructability Review_ | 9/12/2006 3:36:05 PM | 0 KB |
| 311 | |  | | Eric Embacher | Geoffrey Prelgo; Jeffrey Morey | Fwd: Re: I35W, SP 2783-107: Shoulder use_ | 9/12/2006 3:32:16 PM | 2 KB |
| 312 | |  | | Geoffrey Prelgo | Richard Post | Fwd: I-35W Constructability Review_ | 9/12/2006 3:22:17 PM | 1 KB |
| 313 | |  | | Jay Hietpas | Hietpas, Jay; Prelgo, Geoffrey; Embacher, Eric; M... | I-35W Constructability Review_ | 9/12/2006 3:18:51 PM | 1 KB |
| 314 | |  |  | Eric Embacher | Jay Hietpas | Constuctability Review_ | 9/12/2006 3:09:04 PM | 0 KB |
| 315 | |  |  | Geoffrey Prelgo | Eric Embacher; Jeffrey Morey | Fwd: Re: I35W, SP 2783-107: Shoulder use_ | 9/12/2006 2:43:16 PM | 2 KB |
| 316 | |  |  | Dale Nelson | Richard Post | Re: I35W at University, 4th original plan sheets_ | 9/12/2006 2:42:09 PM | 1 KB |
| 317 | |  | | Dale Nelson | Jeffrey Morey; Geoffrey Prelgo | Re: I35W, SP 2783-107: Shoulder use_ | 9/12/2006 1:35:38 PM | 2 KB |
| 318 | |  |  | Geoffrey Prelgo | Elizabeth Buckley | Re: I35W, SP 2783-107: PIF_ | 9/12/2006 10:34:28 AM | 1 KB |
| 319 | |  |  | Chris Beckwith | Geoffrey Prelgo | Re: I35W, SP 2783-107: Anti-Icing_ | 9/12/2006 10:06:12 AM | 1 KB |
| 320 | |  |  | Don Flemming | Scott Pierson | Minutes of 9-6-06 Meeting_ | 9/11/2006 5:54:53 PM | 2 KB |
| 321 | |  |  | Marv Lunceford | Edward Katzmark | STIP_ | 9/11/2006 11:06:05 AM | 0 KB |
| 322 | |  |  | Richard Post | Luis Reyes | OLD 35W WASHINGTON TO 4TH ST circa 1966_ | 9/11/2006 10:53:12 AM | 0 KB |
| 323 | |  |  | Richard Post | Paul Kivisto | Traffic Barrier Wall 35W & Uninversity, 4th Ave B..._ | 9/11/2006 8:32:18 AM | 2 KB |
| 324 | |  | | Bob Hawkinson | Bee Thao; Paul Kivisto; Arlen Ottman; Gary Peters... | 9340 pictures_ | 9/8/2006 11:58:12 AM | 0 KB |
| 325 | |  |  | Eric Embacher | Jay Hietpas | constuctability review letter_ | 9/7/2006 11:06:08 AM | 0 KB |
| 326 | |  |  | Shawn Chambers | Marv Lunceford | State Plan performance_ | 9/7/2006 10:41:15 AM | 0 KB |
| 327 | |  | | Paul Kivisto | Geoffrey Prelgo | Re: I35W, SP 2783-27873A & 2783-9340E : Cost Esti..._ | 9/7/2006 9:17:32 AM | 1 KB |
| 328 | |  | | Thomas OKeefe | John Griffith; Douglas Abere; Jerome Adams | Re: Mpls. Freeway Study Six Pack preview_ | 9/7/2006 8:27:06 AM | 1 KB |
| 329 | |  | | Geoffrey Prelgo | Richard Post | Fwd: Re: I35W, SP 2783-107:Pier Protection_ | 9/7/2006 7:57:50 AM | 0 KB |
| 330 | |  |  | Marv Lunceford | Cynthia Krumsieg | STIP_ | 9/6/2006 2:18:28 PM | 0 KB |
| 331 | |  |  | Cynthia Krumsieg | Marv Lunceford | Fwd: Reasons for Delay_ | 9/6/2006 1:05:20 PM | 1 KB |
| 332 | |  |  | Steve McVay | Cynthia Krumsieg | Reasons for Delay_ | 9/6/2006 10:46:02 AM | 0 KB |
| 333 | |  | | Jay Hietpas | Todd Bergland | Re: Concrete Rehab Projects_ | 9/6/2006 8:09:30 AM | 1 KB |
| 334 | |  | | Todd Bergland | Jay Hietpas | Re: Concrete Rehab Projects_ | 9/6/2006 7:54:42 AM | 1 KB |