From To Subject Date Size
1 Karlene FrenchGeoffrey PrelgoRe: I-35W SP2783-107_ 1/31/2007 1:42:37 PM2 KB
2 Michael EnghEric EmbacherT&T for 2783-107_ 1/31/2007 1:09:54 PM0 KB
3 Richard ScarrowRobert WalzRe: S.P. 2783-107 ESTIMATED QUANTITIES_ 1/31/2007 12:52:21 PM1 KB
4 Bruce IrishGeoffrey PrelgoRe: I-35W SP2783-107_ 1/31/2007 12:29:46 PM2 KB
5 Geoffrey PrelgoKarlene FrenchRe: I-35W SP2783-107_ 1/31/2007 11:57:00 AM2 KB
6 Karlene FrenchEric Embacher; klarsen@peerengineering.comI-35W SP2783-107_ 1/31/2007 11:38:15 AM1 KB
7 Chris BosakRichard Scarrow; Richard PostRe: SP 2783-107 Estimated Quantities_ 1/31/2007 11:24:09 AM2 KB
8 Richard ScarrowRichard PostRe: SP 2783-107_ 1/31/2007 11:15:31 AM2 KB
9 Richard ScarrowRichard PostRe: SP 2783-107 Estimated Quantities_ 1/31/2007 11:13:25 AM2 KB
10 Luis ReyesRichard Post TH 35W SP 2783-107 -Water Seepage Areas_ 1/31/2007 11:11:12 AM0 KB
11 Chris BosakRichard ScarrowSP 2783-107 TH 35W Sheet no's_ 1/31/2007 11:06:53 AM0 KB
12 Geoffrey PrelgoRichard ScarrowRe: sp 2783-107 (th 35w)_ 1/31/2007 10:20:18 AM4 KB
13 Tiffany KautzRichard ScarrowRe: sp 2783-107 (th 35w)_ 1/31/2007 10:14:04 AM3 KB
14Richard ScarrowChris BosakRe: sp 2783-107 (th 35w)_ 1/31/2007 9:38:29 AM3 KB
15 Geoffrey PrelgoRichard ScarrowFwd: Special Provisions Division SS, S.P. 2783-10..._ 1/31/2007 9:29:16 AM0 KB
16 Michael GerbenskyChris Bosak; Tiffany Kautz; Geoffrey PrelgoFwd: Special Provisions Division SS, S.P. 2783-10..._ 1/31/2007 9:03:41 AM0 KB
17 Chris BosakRichard Scarrowsp 2783-107 (th 35w)_ 1/31/2007 8:53:24 AM1 KB
18 Tiffany KautzRichard PostFwd: SP 2783-107 Special Provisions for CIPP Lin..._ 1/30/2007 4:44:02 PM0 KB
19 Jeffrey MoreyTiffany KautzRe: Detour Agreement for SP 2783-107_ 1/30/2007 4:26:53 PM1 KB
20 Lara AniskoffTiffany Kautz_ 1/30/2007 3:46:17 PM0 KB
21 Tiffany KautzChris Bosak; Richard Post; Geoffrey Prelgo; Richa...Fwd: Re: I35W, SP 2783-107:Pay Items_ 1/30/2007 3:14:08 PM2 KB
22 Richard ScarrowGeoffrey PrelgoRe: 2783-107 Guardrail Issues_ 1/30/2007 3:12:27 PM4 KB
23 Richard ScarrowChris Bosak; Tiffany Kautz; Richard Post; Geoffre...Fwd: Re: I35W, SP 2783-107:Pay Items_ 1/30/2007 3:10:44 PM1 KB
24 Bruce IrishTiffany Kautz SP 2783-107 Special Provisions for CIPP Liner_ 1/30/2007 2:15:52 PM0 KB
25 Geoffrey PrelgoRichard ScarrowRe: 2783-107 Guardrail Issues_ 1/30/2007 2:07:01 PM3 KB
26 Geoffrey PrelgoRichard ScarrowWRE Information should be ready by the end of the..._ 1/30/2007 1:59:37 PM12 KB
27 Tiffany KautzTiffany KautzFwd: Tab Letters for SP 2783-107 (I 35W)_ 1/30/2007 1:31:38 PM1 KB
28 Ken LjungChris Bosak; Tiffany Kautz; Geoffrey Prelgo; Rich...Re: 2783-107 Guardrail Issues_ 1/30/2007 1:14:32 PM3 KB
29 Richard ScarrowChris BosakRe: Fwd: SP 2783-107 Grading & Base office change_ 1/30/2007 1:02:29 PM2 KB
30 Jeff GibbensRichard ScarrowFwd: Re: Completion of Plan and Provisions - SP 2..._ 1/30/2007 12:47:47 PM13 KB
31 Chris BosakTiffany Kautz; Richard Scarrow; Richard PostWRE Information should be ready by the end of the..._ 1/30/2007 12:45:18 PM13 KB
32 Chris BosakTiffany Kautz; Richard Scarrow; Richard PostWRE Information should be ready by the end of the..._ 1/30/2007 12:34:40 PM13 KB
33Richard ScarrowTiffany Kautz; Eric Embacher; Richard PostWRE Information should be ready by the end of the..._ 1/30/2007 12:23:57 PM14 KB
34 Tiffany KautzRobert WalzMore items for the Estimated Quanities. Fwd: Re:..._ 1/30/2007 12:02:04 PM0 KB
35 Eric EmbacherTiffany Kautz; Richard Scarrow; Richard PostWRE Information should be ready by the end of the..._ 1/30/2007 11:59:48 AM12 KB
36Richard ScarrowChris Bosak; Tiffany Kautz; Geoffrey Prelgo; Rich...2783-107 Guardrail Issues_ 1/30/2007 11:52:47 AM2 KB
37 Eric EmbacherGeoffrey PrelgoRe: I35W, SP 2783-107:Pay Items_ 1/30/2007 11:18:04 AM0 KB
38Richard ScarrowTiffany Kautz; Richard PostWRE Information should be ready by the end of the..._ 1/30/2007 10:38:45 AM11 KB
39 Chris BosakRichard Post; Richard ScarrowRe: Plan Corrections (2783-107)_ 1/30/2007 7:49:29 AM2 KB
40 Richard ScarrowGeoffrey PrelgoRe: Plan Corrections (2783-107)_ 1/30/2007 6:46:26 AM3 KB
41Richard ScarrowRichard PostPlan Corrections (2783-107)_ 1/30/2007 5:37:04 AM2 KB
42Richard ScarrowGlen Ellis; Ken Ljung; Chris KufnerRe: I-35W, Guardrail for Piers @ Johnson, NB & SB_ 1/30/2007 5:12:51 AM5 KB
43 Tiffany KautzChris BosakSP 2783-107 (I 35W): 2301.602 Dowel Bar Retrofit ..._ 1/29/2007 4:17:08 PM0 KB
44 Sarah Kline-StensvoldDale Klossner; Daniel Dorgan; Lowell Johnson; Jam...Action Items from 1/29/07 OD/IT meeting with Brid..._ 1/29/2007 3:17:00 PM1 KB
45 Geoffrey PrelgoEric EmbacherI35W, SP 2783-107:Pay Items_ 1/29/2007 1:02:10 PM0 KB
46 Geoffrey PrelgoLuis Reyes; Richard PostI35W, SP 2783-107:Guardrail Modifications_ 1/29/2007 1:00:54 PM0 KB
47 Geoffrey PrelgoRichard ScarrowI35W, SP 2783-107- Aggregate Compaction_ 1/29/2007 9:14:17 AM0 KB
48 Geoffrey PrelgoChris Bosak; Tiffany KautzFwd: Special Provisions SP 2783-107 - Snow & Ice ..._ 1/29/2007 6:22:51 AM2 KB
49 Richard PostRichard ScarrowSpecial Provisions SP 2783-107 - Snow & Ice Split..._ 1/28/2007 11:42:01 PM2 KB
50 Luis ReyesRichard PostFwd: pipe lining for I35W-Stinson to Mississippi ..._ 1/26/2007 3:11:51 PM0 KB
51 Marv LuncefordChris Bosak; Tiffany Kautz; Geoffrey PrelgoRe: I35W, SP 2783-107, 2783-9340E, 2783-27873A_ 1/26/2007 1:57:09 PM1 KB
52 Geoffrey PrelgoChris Bosak; Marv Lunceford; Tiffany KautzI35W, SP 2783-107, 2783-9340E, 2783-27873A_ 1/26/2007 1:53:39 PM1 KB
53 Paul KivistoRoger SchultzTH 35W unsound deck areas_ 1/26/2007 11:01:51 AM0 KB
54 Geoffrey PrelgoChris Bosak; Tiffany KautzI35W, SP 2783-107: Redlines_ 1/25/2007 1:40:55 PM0 KB
55 Chris KufnerJohn Kellerman; Annette HansonRe: Fwd: BARC Transfer_ 1/25/2007 12:42:58 PM1 KB
56 Geoffrey PrelgoChris Bosak; Tiffany Kautz; Richard Post; Richard...I35W, SP 2783-107: Specs_ 1/25/2007 12:41:36 PM0 KB
57 Karlene FrenchGeoffrey PrelgoSpecial Provisions for SP 2783-107 I-35W_ 1/25/2007 12:31:21 PM0 KB
58 Geoffrey PrelgoTiffany KautzFwd: Reminder on 35W Project_ 1/25/2007 8:43:11 AM2 KB
59 Richard ScarrowRichard PostReminder on 35W Project_ 1/25/2007 8:33:22 AM2 KB
60 Richard ScarrowRichard PostMeeting Cancelled: Scarrow's cubicle; (29 Jan 200..._ 1/25/2007 8:27:35 AM0 KB
61 Tiffany KautzJames Martin; Luis Reyes; Robert Walz; Richard Po...Tab Letters for SP 2783-107 (I 35W)_ 1/25/2007 7:30:42 AM1 KB
62 Tiffany KautzBrian Barrett; Scott Hansen; Jeffrey Morey; Greg ...Tabs and Page Number for SP 2783-107 (I-35W)_ 1/24/2007 2:34:55 PM1 KB
63 Luis ReyesChris BosakTH35W SP 2783-107 Arrow question._ 1/24/2007 12:55:25 PM1 KB
64 Thomas OKeefeMike SobolewskiRe: Study List - HELP NEEDED_ 1/24/2007 12:18:51 PM2 KB
65 Mike SobolewskiLisa Freese; Thomas OKeefe; Chris Roy; Nick Thomp...Study List - HELP NEEDED_ 1/24/2007 11:00:54 AM2 KB
66 Nancy LevineEric Embacher35W Repairs_ 1/24/2007 10:36:01 AM0 KB
67 Arlen OttmanSteve EllisAnti-icing system spec._ 1/24/2007 10:32:07 AM0 KB
68 Chris BeckwithArlen OttmanRe: Anti-icing System on Br. 9340_ 1/24/2007 9:07:29 AM2 KB
69 Arlen OttmanChris BeckwithRe: Anti-icing System on Br. 9340_ 1/24/2007 8:38:19 AM2 KB
70 Eric EmbacherMichael EnghT&T for 2783-107_ 1/24/2007 8:08:36 AM0 KB
71 Chris BeckwithArlen OttmanRe: Anti-icing System on Br. 9340_ 1/24/2007 8:05:47 AM2 KB
72 Arlen OttmanChris BeckwithRe: Anti-icing System on Br. 9340_ 1/24/2007 7:59:39 AM2 KB
73 Chris BeckwithArlen OttmanRe: Anti-icing System on Br. 9340_ 1/24/2007 7:17:01 AM1 KB
74 Geoffrey PrelgoLuis ReyesI35W, SP 2783-107: Subsurface Drainage_ 1/24/2007 6:29:37 AM0 KB
75 Geoffrey PrelgoJames Martin; Luis Reyes; Robert Walz; Richard Po...I35W, SP 2783-107: Signature Date_ 1/23/2007 2:26:01 PM0 KB
76 Annette HansonJohn KellermanFwd: BARC Transfer_ 1/23/2007 10:00:57 AM1 KB
77 Kathy JenningsAnnette HansonBARC Transfer_ 1/23/2007 9:51:34 AM0 KB
78 Geoffrey PrelgoTiffany KautzI35W, SP 2783-107:TMS_ 1/23/2007 9:21:38 AM0 KB
79 Joella GivensMitch BarteltRe: Aerial map for 35W Bridge over Mississippi R...._ 1/23/2007 8:43:16 AM1 KB
80 Bruce IrishTiffany KautzRe: SP 2783-107 (I 35W) Water Resource Notes._ 1/23/2007 8:25:23 AM1 KB
81 Michael EnghEric EmbacherFwd: RE: emergency services contact_ 1/23/2007 6:33:44 AM2 KB
82 Frank KromarMehrtash MehranFwd: FY 07 Contract Invoicing/Spending Plans_ 1/22/2007 5:31:00 PM3 KB
83 Virginia CarlsonKevin Leonard; Kevin Leonard; Jim Magoon; Jim Mag...Property Management Requirements - Part 1 222-244_ 1/22/2007 4:34:14 PM2 KB
84 Geoffrey PrelgoLuis Reyes; Richard PostFwd: Re: I35W, SP 2783-107:Median Drainage Struct..._ 1/22/2007 3:42:20 PM1 KB
85 Eric EmbacherMichael EnghFwd: RE: emergency services contact_ 1/22/2007 3:07:42 PM2 KB
86 Michael EnghEric EmbacherFwd: RE: emergency services contact_ 1/22/2007 2:37:23 PM2 KB
87 Deb BundeMitch BarteltRe: Fwd: SP 2783-116 TH 35W Br. 9340 plating proj..._ 1/22/2007 12:41:54 PM5 KB
88 Geoffrey PrelgoChris Bosak; Tiffany KautzI35W, SP 2783-107:Redlines_ 1/22/2007 12:13:21 PM0 KB
89 Mitch BarteltDeb BundeFwd: SP 2783-116 TH 35W Br. 9340 plating project ..._ 1/22/2007 11:20:15 AM4 KB
90 Jerome AdamsMitch BarteltRe: Fwd: 2783-116 (I-35W) - Information_ 1/22/2007 11:12:27 AM3 KB
91 Mitch BarteltJerome AdamsFwd: 2783-116 (I-35W) - Information_ 1/22/2007 11:05:54 AM3 KB
92 Mitch BarteltJoella GivensAerial map for 35W Bridge over Mississippi R., SP..._ 1/22/2007 10:48:58 AM0 KB
93 Roger SchultzJack PirklFwd: SP 2783-116 TH 35W Br. 9340 plating project ..._ 1/22/2007 10:41:26 AM4 KB
94Julie FiereckLloyd Davis; Steve Ellis; Dave Hall; Thomas Wiene...FY 07 Contract Invoicing/Spending Plans_ 1/22/2007 10:23:46 AM6 KB
95 Luis ReyesTiffany KautzTH35W SP 2783-107 Turf Establishment Sheets_ 1/22/2007 9:48:20 AM0 KB
96 Deb BundeMitch BarteltFwd: 2783-116 (I-35W) - Information_ 1/22/2007 9:47:18 AM3 KB
97 Jerome AdamsPaul Kivisto; Gary Peterson; Timothy Dockter; Joh...SP 2783-116 TH 35W Br. 9340 plating project chang..._ 1/22/2007 8:43:27 AM5 KB
98 Chris BeckwithArlen OttmanRe: Anti-icing System on Br. 9340_ 1/22/2007 8:41:32 AM1 KB
99 Arlen OttmanChris BeckwithAnti-icing System on Br. 9340_ 1/22/2007 8:13:19 AM0 KB
100 Luis ReyesChris BosakRe: SP 2783-107 (TH 35W)_ 1/19/2007 3:42:32 PM1 KB
101 Eric EmbacherMichael Enghemergency services contact_ 1/19/2007 11:43:29 AM0 KB
102 Geoffrey PrelgoChris BosakRe: SP 2783-107 (TH 35W)_ 1/19/2007 11:09:34 AM1 KB
103 Steve EllisElizabeth BenjaminTH 35W Repairs_ 1/19/2007 8:28:34 AM1 KB
104 Chris BosakTiffany Kautz; Geoffrey PrelgoSP 2783-107 (TH 35W)_ 1/19/2007 7:52:41 AM1 KB
105 Roger SchultzMarv LuncefordFwd: Bridge 9340 Plating Project_ 1/18/2007 3:43:08 PM3 KB
106 Roger SchultzJack PirklFwd: Bridge 9340 Plating Project_ 1/18/2007 1:55:19 PM3 KB
107 Chris BosakEric EmbacherSP 2783-107 (TH 35W)_ 1/18/2007 1:38:42 PM1 KB
108 Gary PetersonJerome AdamsBridge 9340 Plating Project_ 1/18/2007 1:36:33 PM3 KB
109 Jerome AdamsMitch BarteltFwd: Br. #9340 Plating locations_ 1/18/2007 12:23:56 PM1 KB
110 Paul KivistoJerome AdamsBr. #9340 Plating locations_ 1/18/2007 11:16:29 AM1 KB
111 Luis ReyesChris BosakRe: Fwd: help_ 1/18/2007 11:01:54 AM1 KB
112 Thomas OKeefeJohn Griffith; Darlene Lazer; Sherry NarusiewiczRe: Common Sections Study One Pager_ 1/18/2007 10:54:37 AM2 KB
113 Geoffrey PrelgoChris BosakRe: Fwd: help_ 1/18/2007 8:32:20 AM1 KB
114 Chris BosakTiffany Kautz; Geoffrey PrelgoFwd: help_ 1/18/2007 8:22:28 AM1 KB
115 Brian HagerChris Bosakhelp_ 1/18/2007 8:16:39 AM0 KB
116 Brian GageMarv LuncefordRe: Worksheet _ 1/18/2007 7:57:40 AM1 KB
117 Richard PostArlen OttmanRe: AP 2783-107 Drainage Structure_ 1/18/2007 7:28:36 AM2 KB
118 Geoffrey PrelgoChris Bosak; Tiffany KautzI35W, SP 2783-107_ 1/18/2007 6:54:17 AM0 KB
119 Arlen OttmanRichard PostRe: AP 2783-107 Drainage Structure_ 1/18/2007 6:07:01 AM2 KB
120 Eric EmbacherElizabeth Benjamin; Eric Embacher2783-107_ 1/17/2007 4:09:03 PM0 KB
121 Eric EmbacherJeffrey MoreyRe: PCMS LS pay item for 2783-107_ 1/17/2007 2:47:36 PM1 KB
122 Marv LuncefordBrian GageWorksheet _ 1/17/2007 2:28:34 PM0 KB
123 Geoffrey PrelgoJames Martin; Luis Reyes; Tiffany Kautz; Robert W...Fwd: Final Soils Letter for I-35W (SP 2783-107)_ 1/17/2007 1:30:38 PM1 KB
124 Jeffrey MoreyEric EmbacherRe: PCMS LS pay item for 2783-107_ 1/17/2007 1:22:32 PM1 KB
125 Eric EmbacherJeffrey MoreyRe: PCMS LS pay item for 2783-107_ 1/17/2007 1:21:26 PM1 KB
126 Jeffrey MoreyEric EmbacherRe: PCMS LS pay item for 2783-107_ 1/17/2007 1:16:01 PM0 KB
127 Dale NelsonGeoffrey PrelgoFinal Soils Letter for I-35W (SP 2783-107)_ 1/17/2007 1:15:40 PM1 KB
128 Eric EmbacherJeffrey MoreyRe: PCMS LS pay item for 2783-107_ 1/17/2007 1:12:05 PM0 KB
129 Jeffrey MoreyEric EmbacherRe: PCMS LS pay item for 2783-107_ 1/17/2007 12:59:44 PM0 KB
130 John GriffithSherry Narusiewicz; Thomas OKeefeRe: Common Sections Study One Pager_ 1/17/2007 12:13:30 PM1 KB
131 Eric EmbacherMichael Engh; Jeffrey MoreyPCMS LS pay item for 2783-107_ 1/17/2007 12:03:39 PM0 KB
132 Geoffrey PrelgoJames Martin; Luis Reyes; Robert Walz; Richard Po...Fwd: SP 2783-107 Grading & Base office change_ 1/17/2007 11:47:17 AM1 KB
133 Dale NelsonChris Bosak; Geoffrey PrelgoSP 2783-107 Grading & Base office change_ 1/17/2007 11:43:23 AM1 KB
134 Richard PostLuis Reyes; Robert WalzFwd: Re: I35W, SP 2783-107_ 1/17/2007 9:39:45 AM0 KB
135 Geoffrey PrelgoChris Bosak; Tiffany Kautz; Richard PostFwd: Re: I35W, SP 2783-107_ 1/17/2007 9:35:29 AM0 KB
136 Geoffrey PrelgoChris Bosak; Tiffany Kautz; Richard PostFwd: Re: I35W, SP 2783-107_ 1/17/2007 9:33:42 AM0 KB
137 Chris BosakBruce IrishRe: I35W from Mississippi River to Stinson_ 1/17/2007 7:04:06 AM3 KB
138 Geoffrey PrelgoChris BosakRe: Fwd: I35W from Mississippi River to Stinson_ 1/17/2007 7:01:42 AM3 KB
139 Bruce IrishChris BosakI35W from Mississippi River to Stinson_ 1/16/2007 4:04:33 PM3 KB
140 Paul KivistoNancy LevineRe: 35W Repair project_ 1/16/2007 3:27:59 PM1 KB
141 Tiffany KautzRichard PostFwd: CIPP Liner Special Provisions_ 1/16/2007 2:29:16 PM1 KB
142 Chris BosakGeoffrey PrelgoSP 2783-107 (TH 35W) More $$$ _ 1/16/2007 1:59:14 PM1 KB
143 Geoffrey PrelgoChris Bosak; Tiffany KautzFwd: 2783-107_ 1/16/2007 1:45:20 PM0 KB
144 Geoffrey PrelgoRichard PostRe: I35W, SP 2783-107: Kufner's Storm Sewer Struc..._ 1/16/2007 11:10:10 AM1 KB
145 Richard PostGeoffrey PrelgoRe: I35W, SP 2783-107: Kufner's Storm Sewer Struc..._ 1/16/2007 11:04:57 AM1 KB
146 Geoffrey PrelgoRichard PostI35W, SP 2783-107: Kufner's Storm Sewer Structure_ 1/16/2007 10:32:33 AM0 KB
147 Lara AniskoffLuis Reyes; Tiffany KautzStinson to the Rivver TH 35W_ 1/16/2007 10:29:48 AM0 KB
148 Geoffrey PrelgoChris BosakI35W, SP 2783-107:Materials Signature_ 1/16/2007 9:57:53 AM0 KB
149 Geoffrey PrelgoScott Hansen; Heather Lott; Jeffrey Morey; Greg B...I35W, SP 2783-107:Page/Tab, Numbers/letters_ 1/16/2007 9:48:10 AM0 KB
150 Geoffrey PrelgoChris Bosak; Tiffany KautzFwd: I35W, SP 2783-107: Redlines_ 1/16/2007 9:29:24 AM1 KB
151 Jodie MartineauMetro Maint Dispatchersbridge sprayer_ 1/16/2007 8:59:15 AM0 KB
152 Jodie MartineauCalvin Lucasbridge sprayer_ 1/16/2007 8:44:09 AM0 KB
153 Gary Petersondon_flemming@urscorp.comRe: Conference Call on Bridge 9340_ 1/12/2007 5:13:34 PM1 KB
154 Geoffrey PrelgoRichard PostRe: I35W, SP 2783-107:Concrete Median Barrier_ 1/12/2007 3:55:52 PM3 KB
155 Bruce IrishTiffany KautzCIPP Liner Special Provisions_ 1/12/2007 3:30:38 PM1 KB
156 Geoffrey PrelgoRichard PostRe: I35W, SP 2783-107:Concrete Median Barrier_ 1/12/2007 3:25:31 PM2 KB
157 Arlen OttmanChris BeckwithAnti-icing System_ 1/12/2007 2:26:48 PM0 KB
158 Geoffrey PrelgoChris Bosak; James Martin; Richard Post; Tiffany ...I35W, SP 2783-107:Concrete Median Barrier_ 1/12/2007 2:05:07 PM0 KB
159 Geoffrey PrelgoChris BosakRe: I35W, SP 0280-54:Swanny_ 1/12/2007 12:05:54 PM1 KB
160 Chris BosakLuis ReyesRe: Fwd: 35w_ 1/12/2007 10:01:15 AM3 KB
161 Chris KufnerSherry NarusiewiczBARC request_ 1/12/2007 9:58:08 AM0 KB
162 Chris BosakLuis ReyesRe: Fwd: 35w_ 1/12/2007 9:18:34 AM2 KB
163 Geoffrey PrelgoChris Bosak; James Martin; Richard PostI35W, SP 2783-107:Drainage @ Proposed Median Barr..._ 1/11/2007 3:07:05 PM0 KB
164 Arlen OttmanPaul KivistoFwd: Re: Anti-icing System_ 1/11/2007 2:42:52 PM3 KB
165 Arlen OttmanChris BeckwithRe: SP 2783-9340E anti-icing spec_ 1/11/2007 1:57:52 PM2 KB
166 Chris BeckwithArlen OttmanRe: SP 2783-9340E anti-icing spec_ 1/11/2007 1:43:17 PM2 KB
167 Jerome AdamsMitch BarteltFwd: 2783-116 (I-35W/Br 9340) - project documenta..._ 1/11/2007 12:57:36 PM0 KB
168 Richard DaltonDeb Bunde; Jerome Adams2783-116 (I-35W/Br 9340) - project documentation ..._ 1/11/2007 12:50:22 PM0 KB
169 Mitch BarteltJerome Adams35W bridge - Friday_ 1/11/2007 12:30:54 PM0 KB
170 Geoffrey PrelgoJames Martin; Luis Reyes; Robert Walz; Richard Po...I35W, SP 2783-107:Concrete Median Barrier_ 1/11/2007 9:21:13 AM0 KB
171 Luis ReyesChris BosakRe: Fwd: 35w_ 1/11/2007 8:11:36 AM1 KB
172 Gary PetersonBridge Conf Rm 1st Floor; Gary Peterson; Kevin We...Bridge 9340 plating contract scope of work_ 1/10/2007 3:43:07 PM7 KB
173 Eric EmbacherThomas Wiener2783-107 CPM Spec_ 1/10/2007 3:40:33 PM0 KB
174 Chris BosakBrian HagerRe: 35w_ 1/10/2007 7:55:06 AM1 KB
175 Richard ScarrowKen Ljung; Chris KufnerNB 35W at Johnson Street_ 1/10/2007 7:38:15 AM1 KB
176 Bruce IrishChris BosakI35W from Mississippi River to Stinson_ 1/9/2007 2:51:14 PM1 KB
177  tim worke Additional Detail: MN/DOT Steel Bridge (#9340) R..._ 1/9/2007 12:52:06 PM7 KB
178 Chris BosakEric EmbacherSP 2783-107 (TH 35W)_ 1/9/2007 12:44:18 PM0 KB
179 Paul KivistoTim WorkeRe: MN/DOT Steel Bridge (#9340) Retrofit Project ..._ 1/9/2007 11:32:20 AM2 KB
180  tim worke MN/DOT Steel Bridge (#9340) Retrofit Project - C..._ 1/9/2007 10:29:42 AM5 KB
181 Geoffrey PrelgoChris Bosak; Tiffany KautzI35W, SP 2783-107: Redlines_ 1/9/2007 10:27:32 AM1 KB
182 Cynthia KrumsiegJerome AdamsFwd: Re: Schedule Created for SP 2783-116, I35W S..._ 1/9/2007 10:19:48 AM1 KB
183 Jackie FredrickCynthia KrumsiegRe: Schedule Created for SP 2783-116, I35W Steel ..._ 1/9/2007 10:03:04 AM1 KB
184 Paul Kivistotworke@agcmn.orgRe: 2008 Steel Plating job on I-35_ 1/9/2007 9:51:41 AM3 KB
185 Robert WalzBrian HagerTIN Path_ 1/9/2007 9:19:35 AM0 KB
186 Cynthia KrumsiegJerome AdamsSchedule Created for SP 2783-116, I35W Steel Rein..._ 1/9/2007 9:09:59 AM1 KB
187 Geoffrey PrelgoRichard PostI35W, SP 2783-107:Bridge 9340_ 1/9/2007 8:44:25 AM0 KB
188 Geoffrey PrelgoRichard PostI35W, SP 2783-107: Piers @ Johnson, NB & SB_ 1/8/2007 11:46:18 AM1 KB
189 Geoffrey PrelgoDale NelsonI35W, SP 2783-107:Soils Letter_ 1/8/2007 7:59:37 AM0 KB
190 Jerome AdamsGary PetersonSP 2783-116 Br. 9340_ 1/5/2007 12:24:51 PM1 KB
191 Geoffrey PrelgoChris BosakI35W, SP 2783-107:Storm Structure Retrofits_ 1/4/2007 2:54:25 PM0 KB
192 Geoffrey PrelgoChris Bosak; Tiffany KautzI35W, SP 2783-107: Redlines_ 1/4/2007 2:23:04 PM0 KB
193 Tiffany KautzChris BosakSuperelevation/Construction Plan for SP 2783-107 ..._ 1/4/2007 12:08:39 PM0 KB
194 Geoffrey PrelgoChris BosakFwd: Re: I35W, SP 2783-107:CPR_ 1/4/2007 11:33:52 AM5 KB
195 Marv LuncefordPat BursawFwd: Re: Bridge Data 2008-2014_ 1/4/2007 9:27:57 AM4 KB
196 Steve McVayCynthia KrumsiegProject List _ 1/4/2007 9:27:32 AM0 KB
197 Geoffrey PrelgoRichard PostI35W, SP 2783-107:Soils Letter_ 1/4/2007 9:24:36 AM0 KB
198 Brian GageGus Peterson; Marv Lunceford; Chris MoatesFwd: Re: Bridge Data 2008-2014_ 1/4/2007 9:07:06 AM4 KB
199 Geoffrey PrelgoLuis ReyesRe: TH 35W SP 2783-107_ 1/4/2007 8:38:32 AM0 KB
200 Luis ReyesChris BosakTH 35W SP 2783-107 Alignment Question_ 1/4/2007 7:46:53 AM1 KB
201 Shawn ChambersMarv LuncefordFwd: FINAL 07-09 STIP FHWA.xls_ 1/4/2007 7:40:10 AM1 KB
202 Geoffrey PrelgoRichard PostFwd: Re: I35W, SP 2783-107:Funding_ 1/4/2007 7:20:49 AM3 KB
203 Richard PostLuis Reyes; Geoffrey PrelgoFwd: Re: I35W, SP 2783-107:Funding_ 1/4/2007 7:11:21 AM2 KB
204 Geoffrey PrelgoLuis Reyes; Richard PostFwd: Re: I35W, SP 2783-107:Funding_ 1/3/2007 10:32:00 PM2 KB
205 Gary PetersonJames Pierce; Brian GageRe: Bridge Data 2008-2014_ 1/3/2007 4:48:50 PM2 KB
206 Geoffrey PrelgoJeffrey MoreyRe: 2783-107 page no.'s_ 1/3/2007 10:31:23 AM1 KB
207 Jerome AdamsJohn Griffith; Thomas OKeefeFwd: Prelim. Findings and Recommendations_ 1/3/2007 10:19:39 AM1 KB
208 Jerome AdamsRichard DaltonRe: Fwd: 2783-116 (I-35W/Br 9340) - Environmental..._ 1/3/2007 9:57:41 AM2 KB
209 Chris BeckwithSteve EllisFwd: Re: SP 2783-9340E anti-icing spec_ 1/3/2007 9:37:16 AM3 KB
210 Marv LuncefordSherry NarusiewiczFwd: AGAIN_ 1/3/2007 9:34:32 AM0 KB
211 Eric EmbacherElizabeth BenjaminFwd: Requisition Request_ 1/3/2007 7:28:24 AM0 KB
212 Geoffrey PrelgoChris Bosak; Tiffany KautzI35W, SP 2783-107: Redlines_ 1/3/2007 7:28:08 AM0 KB
213 Geoffrey PrelgoJeffrey MoreyRe: 2783-107 page no.'s_ 1/3/2007 7:15:24 AM0 KB
214 Geoffrey PrelgoChris Bosak; Tiffany KautzFwd: Requisition Request_ 1/3/2007 6:19:53 AM1 KB
215 Geoffrey PrelgoBruce IrishFwd: Requisition Request_ 1/3/2007 6:18:36 AM1 KB
216 Karlene FrenchJulie Fiereck; Keith BakerRequisition Request_ 1/2/2007 4:45:51 PM1 KB
217 Geoffrey PrelgoLuis ReyesRe: TH35W SP 2783-107 Pipe Lining_ 1/2/2007 2:56:32 PM1 KB
218 Geoffrey PrelgoLuis ReyesRe: TH35W SP 2783-107 _ 1/2/2007 2:55:37 PM1 KB
219 Luis ReyesGeoffrey PrelgoTH35W SP 2783-107 Pipe Lining_ 1/2/2007 1:50:35 PM1 KB
220 Geoffrey PrelgoChris Bosak; Tiffany KautzI35W, SP 2783-107: Redlines_ 1/2/2007 1:20:22 PM0 KB
221 Glen EllisGeoffrey PrelgoRe: Fwd: Cost of I-35W SP 2783-104_ 1/2/2007 12:44:30 PM4 KB
222 Gary PetersonPeggy ReichertDistrict Plans_ 1/2/2007 12:19:58 PM1 KB
223 Geoffrey PrelgoChris Bosak; James Martin; Luis Reyes; Tiffany Ka...I35W, SP 2783-107: Guardrail Plans & Specs_ 1/2/2007 11:38:38 AM1 KB
224 Geoffrey PrelgoRichard PostRe: I35W, SP 2783-107: Guardrail Plans & Specs_ 1/2/2007 11:37:19 AM3 KB
225 Geoffrey PrelgoRichard PostRe: I35W, SP 2783-107: Guardrail Plans & Specs_ 1/2/2007 11:08:57 AM2 KB
226 Chris BeckwithSteve EllisFwd: Re: SP 2783-9340E anti-icing spec_ 1/2/2007 11:04:24 AM3 KB
227 Geoffrey PrelgoRichard PostRe: I35W, SP 2783-107: Guardrail Plans & Specs_ 1/2/2007 11:03:30 AM2 KB
228 Chris BeckwithSteve EllisFwd: Re: SP 2783-9340E anti-icing spec_ 1/2/2007 10:31:02 AM2 KB
229 Geoffrey PrelgoRichard PostI35W, SP 2783-107: Guardrail Plans & Specs_ 1/2/2007 9:50:39 AM1 KB
230 Luis ReyesLara AniskoffRe: TH35W Catchbasin Map_ 1/2/2007 9:24:19 AM1 KB
231 Geoffrey PrelgoGlen EllisRe: Fwd: Cost of I-35W SP 2783-104_ 1/2/2007 9:06:35 AM3 KB
232 Glen EllisDennis Scott; Geoffrey PrelgoRe: Fwd: Cost of I-35W SP 2783-104_ 1/2/2007 8:43:34 AM3 KB
233 Greg BrandtGeoffrey Prelgo; Eric EmbacherRe: Fwd: 2783-107_ 1/2/2007 8:26:29 AM2 KB
234 Geoffrey PrelgoEric EmbacherRe: Fwd: 2783-107_ 1/2/2007 7:56:26 AM2 KB
235 Eric EmbacherMichael Engh; Geoffrey Prelgo; Greg BrandtRe: Fwd: 2783-107_ 1/2/2007 7:50:48 AM1 KB
236 Geoffrey PrelgoGreg Brandt; Michael Engh; Eric EmbacherFwd: 2783-107_ 1/1/2007 10:13:53 PM1 KB
237 Geoffrey PrelgoChris Kufner; Richard PostRe: Fwd: Cost of I-35W SP 2783-104_ 1/1/2007 10:02:16 PM4 KB