Dec. 21, 2007 Final Update

What is complete

  • All 227 fracture critical and special feature bridges have had inspections completed this year.  222 were in-depth inspections and 5 were routine inspections.
  • All 3875 Trunk Highway bridges have had a routine inspection completed this year.
  • All 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • All 843 local bridges classified as structurally deficient have been reported as inspected.  An additional 42 of these bridges have been reported to be replaced this year.

Dec. 19, 2007

What is complete

  • 222 of 227 fracture critical and special feature bridges have had in-depth inspections have been completed this year.  Of the remaining 5 bridges, 4 have had routine inspections completed this year.  The remaining bridge will have a routine inspection completed by the end of this week.
  • All 3875 Trunk Highway bridges have had a routine inspection completed this year. 
  • All 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 838 of approximately 885 local bridges classified as structurally deficient have been reported as inspected.  An additional 42 of these bridges have been reported to be replaced this year.  There are 5 remaining local structurally deficient bridges to be inspected this week.

Dec. 11, 2007

What is complete

  • 220 of 227 fracture critical and special feature bridges have had in-depth inspections have been completed this year.  Of the remaining 7 bridges, 3 have had routine inspections completed this year.  The remaining bridges will have routine inspections completed by the end of next week.
  • At least 3829 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.  The remaining 46 bridges will have routine inspections completed by the end of next week.
  • All 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 837 of approximately 885 local bridges classified as structurally deficient have been reported as inspected.  An additional 42 of these bridges have been reported to be replaced this year.  There are 6 remaining local structurally deficient bridges to be inspected.
  • The Cities of Minneapolis and Maple Grove have reported that its structurally deficient bridges have been inspected as of December 7, 2007.  No critical deficiencies found.

What is underway

  • This week PB Americas will have inspection teams working on the T.H. 55, 65, I-35 and I-94 Corridors in the metro area.

Dec. 10, 2007

What is complete

  • 220 of 227 in-depth fracture critical and special inspections have been completed this year.
  • At least 3809 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year. 
  • 105 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 827 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 42 of these bridges have been reported to be replaced this year. 
  • The Cities of Minneapolis and Maple Grove have reported that its structurally deficient bridges have been inspected as of December 7, 2007.  No critical deficiencies found.

What is underway

  • This week PB Americas will have inspection teams working on the T.H. 55, 65, I-35 and I-94 Corridors in the metro area.

Dec. 7, 2007

What is complete

  • 219 of 227 in-depth fracture critical and special inspections have been completed this year.
  • At least 3794 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.  72 of these inspections were reported as completed this week.
  • 105 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 823 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 42 of these bridges have been reported to be replaced this year.  60 of these inspections were reported as completed and one bridge was reported as replaced this week.
  • The City of Hermantown has reported that its structurally deficient bridges have been inspected as of December 5, 2007.  No critical deficiencies found.

What is underway

  • This week PB Americas will have 11 inspection teams working on the T.H. 55, 65, 77 and I-35E Corridors in the metro area.

Dec. 5, 2007

What is complete

  • 219 of 227 in-depth fracture critical and special inspections have been completed this year.
  • At least 3789 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.
  • 105 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 821 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 42 of these bridges have been reported to be replaced this year.

What is underway

  • This week PB Americas will have 11 inspection teams working on the T.H. 55, 65, 77 and I-35E Corridors in the metro area.

Dec. 4, 2007

What is complete

  • 219 of 227 in-depth fracture critical and special inspections have been completed this year.
  • At least 3754 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.
  • 105 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 821 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 42 of these bridges have been reported to be replaced this year.
  • Carver and Dakota County has reported that all structurally deficient bridges have been inspected as of December 3, 2007.

What is underway

  • This week PB Americas will have 11 inspection teams working on the T.H. 55, 65, 77 and I-35E Corridors in the metro area.

Dec. 3, 2007

What is complete

  • 219 of 227 in-depth fracture critical and special inspections have been completed this year.
  • At least 3722 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.
  • 105 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 815 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 41 of these bridges have been reported to be replaced this year.
  • Hennepin, Goodhue, Nicollet, Waseca, Lesueur, Winona and Olmstad Counties and the City of Fairmont have reported that all structurally deficient bridges have been inspected as of December 3, 2007.

What is underway

  • This week PB Americas will have 11 inspection teams working on the T.H. 55, 65, 77 and I-35E Corridors in the metro area.
  • There are no inspections planned today due to snow and ice clean up operations.

Nov. 30, 2007

What is complete

  • 219 of 227 in-depth fracture critical and special inspections have been completed this year.  One of these inspections was completed this week.
  • At least 3722 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.  156 of these inspections were completed this week.
  • 105 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year. One of these inspections was completed this week.
  • At least 763 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 41 of these bridges have been reported to be replaced this year.   22 of these inspections were reported to be completed this week.

What is underway

  • Mn/DOT inspection teams will be inspecting bridges on the I-394 corridor this week.
  • This week PB Americas will have 11 inspection teams working on the T.H. 55, 65, 77 and I-35E Corridors in the metro area.

Nov. 29, 2007

What is complete

  • 219 of 227 in-depth fracture critical and special inspections have been completed this year. 
  • At least 3672 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.
  • 105 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 763 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 41 of these bridges have been reported to be replaced this year.

What is underway

  • Mn/DOT inspection teams will be inspecting bridges on the I-394 corridor this week.
  • This week PB Americas will have 7 inspection teams working on the T.H. 55, 65, 77 and I-35E Corridors in the metro area.

Nov. 27, 2007

What is complete

  • 218 of 227 in-depth fracture critical and special inspections have been completed this year. 
  • At least 3663 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this yearTwo inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 763 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 41 of these bridges have been reported to be replaced this year.
  • Sibley County has reported that all structurally deficient bridges have been inspected as of November 27, 2007.  No critical deficiencies found.

What is underway

  • Mn/DOT inspection teams will be inspecting bridges on the I-394 corridor this week.
  • This week PB Americas will have 7 inspection teams working on the T.H. 55, 65, 77 and I-35E Corridors in the metro area.

Nov. 21, 2007

What is complete

  • 218 of 227 in-depth fracture critical and special inspections have been completed this year. 
  • At least 3564 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.  52 of these inspections have been reported as completed this week.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this yearTwo inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 741 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 41 of these bridges have been reported to be replaced this year.  37 of these inspections have been reported as completed this week.

What is underway

  • Mn/DOT inspection teams will be inspecting bridges on the I-394 corridor this week and next.
  • Beginning on Monday, PB Americas will have 7 inspection teams working on the T.H. 55, 65, 77 and I-35E Corridors in the metro area.

Nov. 20, 2007

What is complete

  • 218 of 227 in-depth fracture critical and special inspections have been completed this year.
  • At least 3564 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this yearTwo inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 726 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 41 of these bridges have been reported to be replaced this year.

What is underway

  • Mn/DOT inspection teams will be inspecting bridges on the I-394 corridor this week and next.

Nov. 17, 2007

What is complete

  • 218 of 227 in-depth fracture critical and special inspections have been completed this year.
  • At least 3526 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this yearTwo inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 726 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 41 of these bridges have been reported to be replaced this year.
  • Jackson, Steele, Cottonwood and Wabasha Counties have completed inspections of all structurally deficient bridges as of November 19, 2007.

What is underway

  • PB Americas teams will be performing in-depth fracture critical inspections on Br. 69802; I-535 over 1st Street and 21st Avenue West and Br. 69818N; I-35 over Scenic Railroad and T.H. 194 northbound in Duluth this week.
  • Mn/DOT inspection teams will be inspecting bridges on the I-394 corridor this week and next.

Nov. 16, 2007

What is complete

  • 218 of 227 in-depth fracture critical and special inspections have been completed this year.  10 of these inspections were completed this week.
  • At least 3514 of approximately 3875 routine Trunk Highway bridge inspections have been completed this year.  140 of these inspections were completed this week.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this yearTwo inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 705 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 41 of these bridges have been reported to be replaced this year.   20 of these inspections were reported to be completed this week.

What is underway

  • PB Americas teams will be performing in-depth fracture critical inspections on Br. 69802; I-535 over 1st Street and 21st Avenue West and Br. 69818N; I-35 over Scenic Railroad and T.H. 194 northbound in Duluth this week.
  • PB Americas will be performing a routine inspection on Br. 53001; T.H. 59 over Jack Creek near Worthington today.
  • PB Americas will be performing a routine inspection on Br. 6746; T.H. 30 over a stream near Blooming Prairie today.

Nov. 15, 2007

What is complete

  • 215 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3394 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this yearTwo inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 705 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 41 of these bridges have been reported to be replaced this year. 

What is underway

  • PB Americas teams will be performing in-depth fracture critical inspections on Br. 69802; I-535 over 1st Street and 21st Avenue West and Br. 69818N; I-35 over Scenic Railroad and T.H. 194 northbound in Duluth this week.
  • PB Americas will be performing a routine inspection on Br. 4874; T.H. 169 over Ripple River today.
  • PB Americas will be performing a routine inspection on Br. 9287; T.H. 29 over City Street in Montevideo and Br. 87007; T.H. 23 over Stream near Maynard today.
  • Mn/DOT inspection teams will be performing routine inspection of Br. 9350; I-94 and Br. 2440; T.H. 65 over the Mississippi River this week.
  • Mn/DOT inspection teams will be performing routine inspections on bridges along Robert Street in St. Paul this week.

Nov. 14, 2007

What is complete

  • 212 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3386 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year. Two inspections remain to be completed. One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 695 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 39 of these bridges have been reported to be replaced this year.
  • Martin and Blue Earth Counties has completed inspection of all structurally deficient bridges as of November 13, 2007. No critical deficiencies were found.

What is underway

  • PB Americas teams will be performing in-depth fracture critical inspections on Br. 69802; I-535 over 1st Street and 21st Avenue West and Br. 69818N; I-35 over Scenic Railroad and T.H. 194 northbound in Duluth this week.
  • PB Americas will be performing a routine inspection on Br. 11009; Paul Bunyan Trail over T.H. 371 near Walker today.
  • PB Americas will be performing a routine inspection on Br. 5432; T.H. 68 over Lazarus Creek and Br. 6403; T.H. 75 over Canby Creek near Canby today.
  • Mn/DOT inspection teams will be performing routine inspection of Br. 9350; I-94 and Br. 2440; T.H. 65 over the Mississippi River this week.
  • Mn/DOT inspection teams will be performing routine inspections on bridges along Robert Street in St. Paul this week.

Nov. 13, 2007

What is complete

  • 212 of 231 in-depth fracture critical and special inspections have been completed this year. 10 of these inspections were reported as completed last week.
  • At least 3374 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year. 52 of these inspections were reported as completed last week.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year. Two inspections remain to be completed. One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 686 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 39 of these bridges have been reported to be replaced this year. 18 of these inspections were reported as completed last week.
  • Lake County has completed inspection of all structurally deficient bridges as of November 7, 2007. No critical deficiencies were found.

What is underway

  • PB Americas teams will be performing in-depth fracture critical inspections along the I-35 corridor in Duluth this week.
  • PB Americas has 3 teams performing routine inspections in the Rochester, Wilmar, Mankato and Brainerd District this week.

Nov. 7, 2007

What is complete

  • 208 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3368 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this yearTwo inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 682 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 39 of these bridges have been reported to be replaced this year.
  • Lyon and Cook County and the City of Marshall have completed inspection of all structurally deficient bridges as of November 7, 2007.  No critical deficiencies were found.

What is underway

  • Mn/DOT Bridge Inspection teams will be performing in-depth fracture critical inspections on the St. Anthony Parkway over the BNSF Railroad in the City of Minneapolis this week.
  • PB Americas teams will be performing in-depth fracture critical inspections in Meeker, Chippewa, Redwood, Blue Earth and Dakota Counties this week.
  • PB Americas inspection team will be inspecting the cables on the T.H. 77 (Cedar Avenue) bridge over the Minnesota River beginning this week.
  • PB Americas inspection team will be performing routine inspections along T.H. 169 near Onamia beginning today.

Nov. 6, 2007

What is complete

  • 205 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3368 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this yearTwo inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 672 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year. 

What is underway

  • Mn/DOT Bridge Inspection teams will be performing in-depth fracture critical inspections on the St. Anthony Parkway over the BNSF Railroad in the City of Minneapolis this week.
  • PB Americas teams will be performing in-depth fracture critical inspections in Meeker, Chippewa, Redwood, Blue Earth and Dakota Counties this week.
  • PB Americas inspection team will be inspecting the cables on the T.H. 77 (Cedar Avenue) bridge over the Minnesota River beginning on today.

Nov. 5, 2007

What is complete

  • 203 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3372 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this yearTwo inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 672 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year. 
  • The City of Bemidji has completed inspections of all structurally deficient bridges as of November 2, 2007.

What is underway

  • Mn/DOT Bridge Inspection teams will be performing in-depth fracture critical inspections on the St. Anthony Parkway over the BNSF Railroad in the City of Minneapolis this week.
  • PB Americas teams will be performing in-depth fracture critical inspections in Meeker, Chippewa, Redwood, Blue Earth and Dakota Counties this week.
  • PB Americas inspection team will be inspecting the cables on the T.H. 77 (Cedar Avenue) bridge over the Minnesota River beginning on today.

Nov. 2, 2007

What is complete

  • 202 of 231 in-depth fracture critical and special inspections have been completed this year.  19 fracture critical bridge inspections were completed this week.
  • At least 3322 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.  140 routine bridge inspections were completed this week.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.  Two inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 671 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.  56 local structurally deficient bridges were inspected this week.
  • Redwood, Yellow Medicine and Dodge Counties have completed inspections of all structurally deficient bridges as of November 2, 2007.

What is planned

  • Mn/DOT Bridge Inspection teams will be performing in-depth fracture critical inspections on the St. Anthony Parkway over the BNSF Railroad in the City of Minneapolis next week.
  • PB Americas teams will be performing in-depth fracture critical inspections in Meeker, Chippewa, Redwood, Blue Earth and Dakota Counties next week.
  • PB Americas inspection team will be inspecting the cables on the T.H. 77 (Cedar Avenue) bridge over the Minnesota River beginning on Monday.

Oct. 31, 2007

What is complete

  • 191 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3265 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.  Two inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 640 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.
  • The City of St. Louis Park has completed inspections of all structurally deficient bridges as of October 30, 2007.

What is underway

  • PB Americas will be performing in-depth fracture critical inspection of the Hennepin Avenue suspension bridge in Hennepin County this week.
  • Mn/DOT Inspection Teams will be performing in-depth fracture critical inspections on Br. 89850 in Redwood County today and 5 bridges in Lyon County later this week.

Oct. 30, 2007

What is complete

  • 183 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3255 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.  Two inspections remain to be completed.  One will be inspected by PB Americas in November, the other is to be inspected by MN/DOT crews but the inspection has been delayed due to high water.
  • At least 620 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.
  • Kandiyohi County has completed inspections of all structurally deficient bridges as of October 29, 2007.

What is underway

  • PB Americas will be performing in-depth fracture critical inspection of the Hennepin Avenue suspension bridge in Hennepin County this week.
  • Mn/DOT Inspection Teams will be performing in-depth fracture critical inspections on Br. 89850 in Redwood County today and 5 bridges in Lyon County later this week.



Oct. 29, 2007

What is complete

  • 183 of 231 in-depth fracture critical and special inspections have been completed this year
  • At least 3226 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 615 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 36 of these bridges have been reported to be replaced this year.

What is underway

  • PB Americas will be performing in-depth fracture critical inspection of the Hennepin Avenue suspension bridge in Hennepin County this week.
  • Mn/DOT Inspection Teams will be performing in-depth fracture critical inspections on Br. 89850 in Redwood County tomorrow and 5 bridges in Lyon County later this week.
  • PB inspection teams will be performing routine inspections on bridges on I-35 near Duluth on Monday and Tuesday next week

Oct. 26, 2007

What is complete

  • 183 of 231 in-depth fracture critical and special inspections have been completed this year.  29 of these inspections have been reported as completed this week.
  • At least 3182 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.  56 of these inspections have been reported as completed this week.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 615 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.  48 of these bridges have been reported as inspected this week.
  • Cass County has reported that all of their structurally deficient bridges have been inspected as of October 25, 2007.

What is underway

  • PB Americas will be performing in-depth fracture critical inspections in Lac Qui Parle County and Chippewa County this week.
  • PB Americas will be performing in-depth fracture critical inspection of the Hennepin Avenue suspension bridge in Hennepin County this week and next.
  • Mn/DOT Inspection Teams will be performing in-depth fracture critical inspections on Br. 5962, 6600 and L8159, local bridges in Ramsey and Washington Counties this week.

What is planned

  • Mn/DOT inspection teams will be performing in-depth fracture critical inspections on 5 bridges in Lyon County next week.
  • PB inspection teams will be performing routing and in-depth fracture critical inspections on bridges on I-35 near Duluth on Monday and Tuesday next week.

 

Oct 25, 2007

What is complete

  • 172 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3181 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 609 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.
  • Brown County has reported that all inspections of structurally deficient bridges have been completed.

What is underway

  • Mn/DOT inspection teams will be inspecting steel pier caps on ramp bridges along I-394, I-94,  and T.H. 100 this week in Hennepin County.
  • PB Americas will be performing routine inspections along T.H. 9 and T.H. 29 in Swift County.
  • PB Americas will be performing in-depth fracture critical inspections in Lac Qui Parle County and Chippewa County this week.
  • PB Americas will be performing in-depth fracture critical inspection of the Hennepin Avenue suspension bridge in Hennepin County this week.
  • Mn/DOT Inspection Teams will be performing in-depth fracture critical inspections on Br. 5962, 6600 and L8159, local bridges in Ramsey and Washington Counties this week.

Oct 24, 2007

What is complete

  • 172 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3178 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 604 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year

What is underway

  • Mn/DOT inspection teams will be inspecting steel pier caps on ramp bridges along I-394, I-94,  and T.H. 100 this week in Hennepin County.
  • PB Americas will be performing routine inspections along T.H. 9 and T.H. 29 in Swift County and Chippewa County this week.
  • PB Americas will be performing in-depth fracture critical inspection of the Hennepin Avenue suspension bridge in Hennepin County this week.
  • Mn/DOT Inspection Teams will be performing in-depth fracture critical inspections on Br. 5962, 6600 and L8159, local bridges in Ramsey and Washington Counties this week.

Oct 23, 2007

What is complete

  • 162 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 3168 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 598 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 36 of these bridges have been reported to be replaced this year.

What is underway

  • Mn/DOT inspection teams will be inspecting steel pier caps on ramp bridges along I-394, I-94, and T.H. 100 this week in Hennepin County.
  • PB Americas will be performing routine inspections along T.H. 9 and T.H. 29 in Swift County.
  • PB Americas will be performing in-depth fracture critical inspections in Lac Qui Parle County and Chippewa County this week.
  • PB Americas will be performing in-depth fracture critical inspection of the Hennepin Avenue suspension bridge in Hennepin County this week.

Oct 22, 2007

What is complete

  • 154 of 231 in-depth fracture critical and special inspections have been completed this year.  4 of these inspections have been reported as completed last week.
  • At least 3126 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.  92 of these inspections have been reported as completed this week.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 595 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.  85 of these inspections have been reported to be completed in the past week.
  • Clay, Houston, Freeborn and Swift Counties have reported that all of their structurally deficient bridges have been inspected.

What is underway

  • Mn/DOT inspection teams will be inspecting steel pier caps on ramp bridges along I-394, I-94,  and T.H. 100 this week in Hennepin County.
  • PB Americas will be performing routine inspections along T.H. 9 and T.H. 29 in Swift County.
  • PB Americas will be performing in-depth fracture critical inspections in Lac Qu

Oct. 12, 2007

What is complete

  • 150 of 231 in-depth fracture critical and special inspections have been completed this year. 10 of these inspections have been reported as completed this week.
  • At least 3018 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year. 133 of these inspections have been reported as completed this week.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 514 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 36 of these bridges have been reported to be replaced this year. 16 of these inspections have been reported as completed this week.

What is underway

  • PB Americas will be performing routine inspections along T.H. 21 between the Jct. T.H. 169 and approximately 4 miles south of Jordan in the metro area on Friday.
  • PB Americas will be performing ultrasonic testing of pins on Br. 9030: I-535 over the St. Louis River in Duluth today.
  • PB Americas will be performing in-depth fracture critical inspection of Br. L6116 over the Duluth Shipping Channel today and early next week.
What is underway
  • PB Americas will be performing in-depth fracture critical inspections in Lac Qui Parle County next week.

 

Oct. 10, 2007 - new information is in bold

What is complete

  • 143 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2987 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 514 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.
  • Becker and Mahnomen Counties have reported that all of their structurally deficient bridges have been inspected as of October 9, 2007, no critical deficiencies found.

What is underway

  • Mn/DOT inspection teams will be inspecting Br. 82856; I-494 over the Mississippi River this week.
  • Mn/DOT inspection team is performing an in-depth fracture critical inspection of Br. L6999; TWP 159 over Chippewa River in Grant County today.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections of Br. 6646 over the Red River of the North in Clay County on today and Br. 6676 over the Red River of the North in Norman County on October 10 and 11.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections in Meeker, Brown, Watonwan, Blue Earth and Faribault Counties and the City of Duluth this week.

What is underway

  • PB Americas will be performing routine inspections along T.H. 21 between the Jct. T.H. 169 and approximately 4 miles south of Jordan in the metro area on Friday.

Oct. 9, 2007

What is complete

  • 142 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2983 of approximately 3,896 routine Trunk Highway bridge inspections have been completed
  • ompleted this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
    At least 504 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 36 of these bridges have been reported to be replaced this year.
  • McLeod County has reported that all of their structurally deficient bridges have been inspected as of October 5, 2007, no critical deficiencies found.
  • Boise Cascade has reported that both T.H. 53 International Border Crossing Bridges in International Falls have been inspected by their consultant.

What is underway

  • Mn/DOT inspection teams will be inspecting Br. 82856; I-494 over the Mississippi River this week.
  • Mn/DOT inspection team is performing an in-depth fracture critical inspection of Br. L6999; TWP 159 over Chippewa River in Grant County today.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections of Br. 6646 over the Red River of the North in Clay County on today and Br. 6676 over the Red River of the North in Norman County on October 10 and 11.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections in Meeker, Brown, Watonwan, Blue Earth and Faribault Counties and the City of Duluth this week.

What is underway

  • PB Americas will be performing routine inspections along T.H. 21 between the Jct. T.H. 169 and approximately 4 miles south of Jordan in the metro area on Friday.

 

Oct. 8, 2007

What is complete

  • 140 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2902 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 496 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.

What is underway

  • Mn/DOT inspection teams will be inspecting Br. 82856; I-494 over the Mississippi River this week.
  • Mn/DOT inspection team is performing an in-depth fracture critical inspection of Br. L3788; TWP 508 over the Tamarac River in Beltrami County today.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections of Br. 6646 over the Red River of the North in Clay County on October 8 and 9 and Br. 6676 over the Red River of the North in Norman County on October 10 and 11.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections in the City of Chaska, McLeod, Meeker, Brown, Watonwan, Blue Earth and Faribault Counties and the City of Duluth this week.

 

Oct. 5, 2007

What is complete

  • 140 of 231 in-depth fracture critical and special inspections have been completed this year.  23 of these inspections were completed this week.
  • At least 2885 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.  179 of these inspections were completed this week.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.  1 of these inspections was completed this week.
  • At least 496 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.  86 of these bridges have been reported as inspected this week and 12 have been reported as being taken out of service and replaced.

What is underway

  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by PB Americas inspection teams.
  • Br. 72012; T.H. 25 over the Minnesota River in Sibley County and Br. 62912; I-35E over the Mississippi River will be inspected this week.
  • PB Americas inspection team will be inspecting Br. 68006; T.H. 11 over the South Branch of Two Rivers  and Br. 5814; T.H. 11 over Roseau River today.
  • PB Americas inspection team will be inspecting Br. 68007; T.H. 310 over the Sprague Creek and Br. 68005; T.H. 89 over Roseau River Saturday.

What is Planned

  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections of Br. 6646 over the Red River of the North in Clay County on October 8 and 9 and Br. 6676 over the Red River of the North in Norman County on October 10 and 11.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections in the City of Chaska, McLeod, Meeker, Brown, Watonwan, Blue Earth and Faribault Counties and the City of Duluth next week.

Oct. 3, 2007

What is complete

  • 133 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2856 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 441 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.
  • Washington County has completed inspection of all structurally deficient bridges as of October 3, 2007, no critical deficiencies found.

What is underway

  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by PB Americas inspection teams.
  • Br. 72012; T.H. 25 over the Minnesota River in Sibley County and Br. 62912; I-35E over the Mississippi River will be inspected this week.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspection of Br. L4372; TWP 62 over Two River in Kittson County today.
  • Mn/DOT bridge inspection teams will be performing in-depth fracture critical inspections of Br. 5664; CSAH 55 (Jackson) over BNSF Railroad and Br. 90396; Wheelock over CP Railroad and Trout Brook today in the City of St. Paul.

What is Planned

  • PB Americas inspection team will be inspecting T.H. bridges in Roseau County on Friday and Saturday.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections of Br. 6646 over the Red River of the North in Clay County on October 8 and 9 and Br. 6676 over the Red River of the North in Norman County on October 10 and 11.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections in the City of Chaska, McLeod, Meeker, Brown, Watonwan, Blue Earth and Faribault Counties and the City of Duluth next week.

Oct. 3, 2007

What is complete

  • 131 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2853 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 104 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 436 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 36 of these bridges have been reported to be replaced this year.
  • Sherburne County has completed inspection of all structurally deficient bridges as of October 2, 2007, no critical deficiencies found.

What is underway

  • Bridges on I-35 near Duluth will be inspected this week by PB Americas inspection teams.
  • Br. 72012; T.H. 25 over the Minnesota River in Sibley County and Br. 62912; I-35E over the Mississippi River will be inspected this week by Mn/DOT inspection teams.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspection of Br. L4255; MUN 60 over Snake River today in Marshall County.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspection of Br. 5804; C.R. 1 over the Big Fork River in Koochiching County today.
  • Mn/DOT inspection teams are performing in-depth fracture critical inspections on several City of St. Paul bridges today and tomorrow.

What is Planned

  • PB Americas inspection team will be inspecting T.H. bridges in Roseau County on Friday and Saturday.
  • PB Americas inspection team will be inspecting local fracture critical bridges in Kittson County tomorrow.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections of Br. 6646 over the Red River of the North in Clay County on October 8 and 9 and Br. 6676 over the Red River of the North in Norman County on October 10 and 11.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections in the City of Chaska, McLeod, Meeker, Brown, Watonwan, Blue Earth and Faribault Counties and the City of Duluth next week.

Oct. 2, 2007

What is complete

  • 122 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2824 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 433 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 35 of these bridges have been reported to be replaced this year.
  • Ottertail and Rice County have completed inspection of all structurally deficient bridges as of September 28, 2007, no critical deficiencies found.
  • White Earth Reservation Bridge R0057 on State 122 over Indian Creek is closed as reported on September 28, 2007.
  • City of Owatonna, Northfield and Faribault have completed inspection of all structurally deficient bridges as of October 1, 2007, no critical deficiencies found.
  • Hennepin County has inspected 5 of 15 bridges classified as structurally deficient as of October 1, 2007, no critical deficiencies found

What is underway

  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by PB Americas inspection teams.
  • Br. 72012; T.H. 25 over the Minnesota River in Sibley County and Br. 62912; I-35E over the Mississippi River will be inspected this week.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspection of Br. 89775; C.R. 160 over Mashaug Creek today in Norman County.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspection of Br. 5804; C.R. 1 over the Big Fork River in Koochiching County today and tomorrow.

What is Planned

  • PB Americas inspection team will be inspecting T.H. bridges in Roseau County on Friday and Saturday.
  • PB Americas inspection team will be inspecting local fracture critical bridges in Marshall, and Kittson County this week.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections of Br. 6646 over the Red River of the North in Clay County on October 8 and 9 and Br. 6676 over the Red River of the North in Norman County on October 10 and 11
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections in the City of Chaska, McLeod, Meeker, Brown, Watonwan, Blue Earth and Faribault Counties next week.

Oct. 1, 2007

What is complete

  • 120 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2774 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 420 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 28 of these bridges have been reported to be replaced this year.
  • Marshall and Lincoln Counties have completed inspection of all structurally deficient bridges as of September 27, 2007, no critical deficiencies found.

What is underway

  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by PB Americas inspection teams.
  • Br. 62912; I-35E over the Mississippi River, Br. 62896; I-35 over Little Canada Road, Br. 9097; I-35E off ramp over I694, and Br. 9140; I-35E SB over I 694 EB will be inspected this week in the metro area.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspection of Br. 3995; CSAH 19 over Spring Creek in Norman County today.

What is Planned

  • PB Americas inspection team will be inspecting T.H. bridges in Roseau County on Friday and Saturday.
  • PB Americas inspection team will be inspecting local fracture critical bridges in Norman, Marshall, and Kittson County this week.
  • PB Americas inspection team will be performing in-depth fracture critical and routine inspections of Br. 6646 over the Red River of the North in Clay County on October 8 and 9 and Br. 6676 over the Red River of the North in Norman County on October 10 and 11.

Sept 27, 2007

What is complete

  • 117 of 231 in-depth fracture critical and special inspections have been completed this year. 10 of these inspections have been completed this week.
  • At least 2706 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year. 220 of these inspections have been completed this week.
  • 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 411 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 28 of these bridges have been reported to be replaced this year. 100 of these inspections have been reported to be completed this week.
  • Ramsey, Faribault, and Watonwon County have completed inspection of all structurally deficient bridges as of September 26, 2007, no critical deficiencies found.
    The City of Maple Grove has replaced their structurally deficient bridge.

What is underway

  • Bridges on T.H. 47 and 169 will be inspected in the Brainerd area this week.
  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by PB Americas inspection teams.
  • Ontario Ministry of Transportation and Mn/DOT personnel will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River this week.
  • Br. 27726B; Ramp from EB I-94 to WB I-394, Br. 27727B Ramp from T.H. 55 to EB I-94 and Br. 27728 Ramp from EB I-394 to WB I-94 will be inspected this week in the Metro area.
  • Br. 305; TWP 88 and Br. L4005; TWP 124 over Riceford Creek, Br. L4560; TWP 257 over unnamed stream and Br. 7533; TWP 132 over the South Fork of the Root River in Houston County will receive in-depth fracture critical inspections this week.

What is Planned

  • Br. 72012; T.H. 25 over the Minnesota River in Sibley County and Br. 62912; I-35E over the Mississippi River will be inspected next week.

Sept. 26, 2007

What is complete

  • 114 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2699 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 399 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 24 of these bridges have been reported to be replaced this year.
  • Murray, Pine, Renville and Isanti County have completed inspection of all structurally deficient bridges as of September 25, 2007, no critical deficiencies found.

What is underway

  • Bridges on T.H. 47 and 169 will be inspected in the Brainerd area this week.
  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by PB Americas inspection teams.
  • Ontario Ministry of Transportation and Mn/DOT personnel will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River this week.
  • Br. 27726B; Ramp from EB I-94 to WB I-394, Br. 27727B Ramp from T.H. 55 to EB I-94 and Br. 27728 Ramp from EB I-394 to WB I-94 will be inspected this week in the Metro area.
  • Br. 305; TWP 88 and Br. L4005; TWP 124 over Riceford Creek, Br. L4560; TWP 257 over unnamed stream and Br. 7533; TWP 132 over the South Fork of the Root River in Houston County will receive in-depth fracture critical inspections this week

What is Planned

  • Br. 72012; T.H. 25 over the Minnesota River in Sibley County and Br. 62912; I-35E over the Mississippi River will be inspected next week.

Sept. 25, 2007

What is complete

  • 111 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2683 of approximately 3,896 routine Trunk Highway bridge inspections have been completed this year.
  • 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 362 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 24 of these bridges have been reported to be replaced this year.
  • Anoka County, Roseau County, Red Lake County and the City of Hutchinson have completed inspection of all structurally deficient bridges as of September 21, 2007, no critical deficiencies found.
  • Marshall County has reported that 7 of 13 structurally deficient bridges have been inspected as of September 21, 2007.
  • Steele County has reported that 1 of 13 structurally deficient bridges have been inspected as of September 21, 2007.
  • Both Otter Tail and Lincoln County have reported that 12 of 15 structurally deficient bridges have been inspected as of September 21, 2007.

What is underway

  • Bridges on T.H. 47 and 169 will be inspected in the Brainerd area this week.
  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by PB Americas inspection teams.
  • Ontario Ministry of Transportation and Mn/DOT personnel will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River this week
  • Br. 27726B; Ramp from EB I-94 to WB I-394, Br. 27727B Ramp from T.H. 55 to EB I-94 and Br. 27728 Ramp from EB I-394 to WB I-94 will be inspected this week in the Metro area.
  • Br. 305; TWP 88 and Br. L4005; TWP 124 over Riceford Creek, Br. L4560; TWP 257 over unnamed stream and Br. 7533; TWP 132 over the South Fork of the Root River in Houston County will receive in-depth fracture critical inspections this week.

What is Planned

  • Br. 72012; T.H. 25 over the Minnesota River in Sibley County and Br. 62912; I-35E over the Mississippi River will be inspected next week.

 

Sept. 24, 2007

What is complete

  • 109 of 231 in-depth fracture critical and special inspections have been completed this year.
  • At least 2560 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year.
  • 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 328 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 24 of these bridges have been reported to be replaced this year.

What is underway

  • Bridges on T.H. 47 and 169 will be inspected in the Brainerd area this week.
  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by PB Americas inspection teams.
  • Ontario Ministry of Transportation and Mn/DOT personnel will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning today.
  • Br. 62912; I-35E over the Mississippi River will be inspected today and tomorrow.

What is Planned

  • Br. 72012; T.H. 25 over the Minnesota River in Sibley County will be inspected Wednesday and Thursday.

Sept 21, 2007

What is complete

  • 106 of approximately 250 in-depth fracture critical and special inspections have been completed this year.
  • At least 2467 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year.
  • 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 253 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 24 of these bridges have been reported to be replaced this year.

What is underway

  • Bridges on T.H. 10, 25 and 47 will be inspected in the Brainerd area this week.
  • PB Americas, Inc. will be inspecting Br. 2723; Lowry Avenue over the Mississippi River in Hennepin County this week. The inspection will be an in-depth fracture critical and routine inspection.
  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by both Mn/DOT and PB Americas inspection teams.
  • Mn/DOT inspection teams will be performing in-depth fracture critical inspections of Br. 665; Twp 128 over Salem Creek and Br. 5290; C.S.A.H. 7 over the Middle Fork of the Zumbro River in Dodge County and Br. 5833; C.R. 124 over the North Branch of the Root River in Filmore County this week.
  • PB Americas, Inc. will continue with in-depth fracture critical inspection of the I-90 (Dresbach) over the Mississippi River September this week.
  • Br. 62062; T.H. 61 over UP Railroad in Ramsey County will be inspected today.

What is Planned

  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be finalizing in-depth fracture critical inspection of the Blatnik Bridge on I-535 in Duluth the week of September 25. 200

Sept. 19, 2007

What is complete

  • 104 of approximately 250 in-depth fracture critical and special inspections have been completed this year.
  • At least 2418 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year.
  • At least 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 253 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 24 of these bridges have been reported to be replaced this year.
  • St. Louis County, District 1, has completed inspection of all 57 structurally deficient bridges as of September 18th, 2007.

What is underway

  • Bridges on T.H. 10, 25 and 47 will be inspected in the Brainerd area this week.
  • PB Americas, Inc. will be inspecting Br. 2723; Lowry Avenue over the Mississippi River in Hennepin County this week.  The inspection will be an in-depth fracture critical and routine inspection
  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by both Mn/DOT and PB Americas inspection teams.
  • Mn/DOT inspection teams will be performing in-depth fracture critical inspections of Br. 665; Twp 128 over Salem Creek and Br. 5290; C.S.A.H. 7 over the Middle Fork of the Zumbro River in Dodge County and Br. 5833; C.R. 124 over the North Branch of the Root River in Filmore County this week.
  • PB Americas, Inc. will continue with in-depth fracture critical inspection of the I-90 (Dresbach) over the Mississippi River September this week.
  • Br. 27942 and 27943; I-94 over Crow River in Hennepin County will be inspected today.
  • Br. 6819; C.S.A.H. 75 over the Sauk River in Stearns County will receive an in-depth fracture critical inspection today.

What is Planned

  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be finalizing in-depth fracture critical inspection of the Blatnik Bridge on I-535 in Duluth the week of September 25. 2007.

Sept. 18. 2007

What is complete

  • 100 of approximately 250 in-depth fracture critical and special inspections have been completed this year.
  • At least 2354 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year.
  • At least 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year.
  • At least 250 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 24 of these bridges have been reported to be replaced this year.

What is underway

  • Bridge inspections today are delayed due to rain across much of the state.
  • Bridges on T.H. 10, 25 and 47 will be inspected in the Brainerd area this week.
  • PB Americas, Inc. will be inspecting Br. 2723; Lowry Avenue over the Mississippi River in Hennepin County this week. The inspection will be an in-depth fracture critical and routine inspection.
  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by both Mn/DOT and PB Americas inspection teams.
  • Mn/DOT inspection teams will be performing in-depth fracture critical inspections of Br. 5806; C.S.A.H. 2 and Br. 6563; C.S.A.H. 7 over the Zumbro River in Wabasha County this week.
  • PB Americas, Inc. will continue with in-depth fracture critical inspection of the I-90 (Dresbach) over the Mississippi River September this week.

What is Planned

  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be finalizing in-depth fracture critical inspection of the Blatnik Bridge on I-535 in Duluth the week of September 25. 2007

Sept. 17

What is complete

  • 99 of approximately 250 in-depth fracture critical and special inspections have been completed this year.
  • At least 2321 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year.
  • At least 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year
  • At least 250 of approximately 900 local bridges classified as structurally deficient have been reported as inspected this year.

What is underway

  • Bridges on T.H. 371 from Fort Ripley to Pine River; T.H. 200 from Whipholt to Hill City; and T.H. 6 from Crosby to Cohassett in the Brainerd area will be inspected this week.
  • PB Americas, Inc. will be inspecting Br. 2723; Lowry Avenue over the Mississippi River in Hennepin County this week. The inspection will be an in-depth fracture critical and routine inspection.
  • Bridges on I-35 near the T.H. 53 intersection in Duluth will be inspected this week by both Mn/DOT and PB Americas inspection teams.
  • Mn/DOT inspection teams will be performing in-depth fracture critical inspections of Br. 5806; C.S.A.H. 2 and Br. 6563; C.S.A.H. 7 over the Zumbro River in Wabasha County this week.

What is planned

  • PB Americas, Inc. will continue with in-depth fracture critical inspection of the I-90 (Dresbach) over the Mississippi River September 17-21, 2007.
  • PB Americas, Inc. will perform in-depth inspection of Lowery Avenue Bridge over the Mississippi River beginning September 17, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007.
  • PB Americas, Inc. will be finalizing in-depth fracture critical inspection of the Blatnik Bridge on I-535 in Duluth the week of September 25. 2007.

Sept. 14

What is complete

  • 94 of approximately 250 in-depth fracture critical and special inspections have been completed this year. 7 in-depth fracture critical bridge inspections were completed this week.
  • At least 2207 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. 329 routine Trunk Highway bridge inspections were completed this week.
  • At least 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year. 1 structurally deficient bridge inspection was completed this week.
  • At least 250 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 24 of these bridges have been reported to be replaced this year. 45 local structurally deficient bridges were inspected this week.Mn/DOT District 7 has completed inspection of all bridges in accordance with the Governor’s directive.
  • Polk County in District 2 has completed inspection of all structurally deficient bridges as of September 14, 2007, no critical deficiencies found.
  • Lyon County in District 8 has reported that 3 of 8 structurally deficient bridges have been inspected as of September 14, 2007.

What is underway

  • Bridges on T.H. 10, 25 and 47 will be inspected in the Brainerd area this week.
  • Bridges on T.H. 95 from St. Cloud to Princeton, T.H. 169 from Onamia to Elk River and T.H. 65 south of Mora will be inspected this week.
  • Br. 9360; Washington Avenue over the Mississippi River in Hennepin County will be inspected this week. The inspection will be an in-depth fracture critical inspection.
  • Bridges on I-35 near the 21st Avenue West Intersection will be inspected today and next week.

What is Planned

  • PB Americas, Inc. will continue with in-depth fracture critical inspection of the I-90 (Dresbach) over the Mississippi River September 17-21, 2007.
  • PB Americas, Inc. will perform in-depth inspection of Lowery Avenue Bridge over the Mississippi River beginning September 17, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007.
  • PB Americas, Inc. will be finalizing in-depth fracture critical inspection of the Blatnik Bridge on I-535 in Duluth the week of September 25. 2007.

Sept. 13, 2007

What is complete

  • 91 of approximately 250 in-depth fracture critical and special inspections have been completed this year. By the end of this week, the goal would be to complete 103 fracture critical inspections.
  • At least 2170 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. By the end of this week, the goal would be to complete 2153 routine inspections.
  • At least 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year. By the end of this week, the goal would be to complete 103 inspections of structurally deficient bridges.
  • At least 237 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 24 of these bridges have been reported to be replaced this year.
  • Aitkin County in District 3 has completed inspection of all structurally deficient bridges as of September 12, 2007, no critical deficiencies found.

What is underway

  • Bridges on T.H. 10, 25 and 47 will be inspected in the Brainerd area this week.
  • Bridges on T.H. 95 from St. Cloud to Princeton, T.H. 169 from Onamia to Elk River and T.H. 65 south of Mora will be inspected this week.
  • Br. 9360; Washington Avenue over the Mississippi River in Hennepin County will be inspected this week. The inspection will be an in-depth fracture critical inspection.
  • Br. 27239 and 27252; T.H. 610 over the Mississippi River will be inspected today.

What is Planned

  • PB Americas, Inc. will continue with in-depth fracture critical inspection of the I-90 (Dresbach) over the Mississippi River September 17-21, 2007.
  • PB Americas, Inc. will perform in-depth inspection of Lowery Avenue Bridge over the Mississippi River beginning September 17, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspection of Br. 5610; T.H. 1 over the Kawishiwi River on September 13 and 14, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007
  • PB Americas, Inc. will be finalizing in-depth fracture critical inspection of the Blatnik Bridge on I-535 in Duluth the week of September 25. 2007.

Sept. 12, 2007

What is complete

  • 90 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 2094 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007
  • At least 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 228 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 24 of these bridges have been reported to be replaced this year.
  • City of Cambridge in District 3 has completed inspection of all structurally deficient bridges as of August 29, 2007, no critical deficiencies found.
  • Clearwater County in District 2 has completed inspection of all structurally deficient bridges as of September 7, 2007, no critical deficiencies found..

What is underway

  • Bridges on T.H. 10, 25 and 47 will be inspected in the Brainerd area this week.
  • Bridges on T.H. 95 from St. Cloud to Princeton, T.H. 169 from Onamia to Elk River and T.H. 65 south of Mora will be inspected this week.
  • Br. 9360; Washington Avenue over the Mississippi River in Hennepin County will be inspected this week. The inspection will be an in-depth fracture critical inspection.
  • Br. 27239 and 27252; T.H. 610 over the Mississippi River will be inspected today and tomorrow.

What is Planned

  • PB Americas, Inc. will continue with in-depth fracture critical inspection of the I-90 (Dresbach) over the Mississippi River September 17-21, 2007.
  • PB Americas, Inc. will perform in-depth inspection of Lowery Avenue Bridge over the Mississippi River beginning September 17, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspection of Br. 5610; T.H. 1 over the Kawishiwi River on September 13 and 14, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007.
  • PB Americas, Inc. will be finalizing in-depth fracture critical inspection of the Blatnik Bridge on I-535 in Duluth the week of September 25. 2007.

Sept. 11, 2007

What is complete

  • 89 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1980 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 103 of 106 Trunk Highway bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 227 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 24 of these bridges have been reported to be replaced this year.

What is underway

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River today. This work is expected to be completed this today.
  • Br. 5871; C.S.A.H. 9 over the Red River of the North in Polk County will have an in-depth fracture critical inspection today.
  • Br. 9090; T.H. 2 and Br. 4700; T.H. 1 over the Red River of the North will be inspected today.
  • Br. 9321 and 27801; I-694 over the Mississippi River will be inspected today and tomorrow.
  • Bridges on T.H. 10, 25 and 47 will be inspected in the Brainerd area this week.
  • Bridges on T.H. 95 from St. Cloud to Princeton, T.H. 169 from Onamia to Elk River and T.H. 65 south of Mora will be inspected this week.
  • Br. 9360; Washington Avenue over the Mississippi River in Hennepin County will be inspected this week. The inspection will be an in-depth fracture critical inspection.

What is Planned

  • PB Americas, Inc. will continue with in-depth fracture critical inspection of the I-90 (Dresbach) over the Mississippi River September 17-21, 2007.
  • PB Americas, Inc. will perform in-depth inspection of Lowery Avenue bridge over the Mississippi River beginning September 17, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspection of Br. 5610; T.H. 1 over the Kawishiwi River on September 13 and 14, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007.
  • PB Americas, Inc. will be finalizing in-depth fracture critical inspection of the Blatnik Bridge on I-535 in Duluth the week of September 25. 2007.

Sept. 10, 2007

What is complete

  • 88 of approximately 250 in-depth fracture critical and special inspections have been completed this year.  The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.  There were 7 bridges reported to have in-depth fracture critical or special inspections last week.
  • At least 1953 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year.  The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.  There were 306 bridges reported to have routine inspections last week.
  • At least 103 of 127 bridges classified as structurally deficient have been inspected this year.  The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.  There were 1 structurally deficient bridges reported to be inspected last week.
  • At least 227 of approximately 900 local bridges classified as structurally deficient have been reported as inspected.  An additional 24 of these bridges have been reported to be replaced this year.  There were 35 local structurally deficient bridges reported to be inspected last week.
  • Br. 5816; C.S.A.H. 3 over the Red River of the North, near Shelly, Minnesota in Norman County was closed on Friday September 7, 2007 due to slope failure at the east abutment.  This bridge is being scheduled for replacement as early as next year.  Norman County is coordinating with North Dakota on the replacement of this bridge.
  • Rock County in District 7 has reported that all 19 structurally deficient bridges have been inspected as of September 5, 2007, no critical deficiencies found.
  • Nobles County in District 7, has completed inspection of all structurally deficient bridges as of September 5, 2007, no critical deficiencies found.
  • Faribault County in District 7, has reported that 14 of 20 structurally deficient bridges have been inspected as of September 5, 2007.

What is underway

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River today.  This work is expected to be completed this week.
  • Br. L 7618; Township Road 515 over the Sandhill River in Polk County will have an in-depth fracture critical inspection today.
  • Br. 5872; T.H. 317 over the Red River of the North will be inspected today.
  • Br. 5921; T.H. 32 over the Clearwater River in Red Lake Falls will be inspected today in Red Lake County.
  • Br. 9321 and 27801; I-694 over the Mississippi River will be inspected today and tomorrow.
  • Bridges on T.H. 10, 25 and 47 will be inspected in the Brainerd area this week.
  • Bridges on T.H. 95 from St. Cloud to Princeton, T.H. 169 from Onamia to Elk River and T.H. 65 south of Mora will be inspected this week.
  • Br. 9360; Washington Avenue over the Mississippi River in Hennepin County will be inspected this week.  The inspection will be an in-depth fracture critical inspection.

What is Planned

  • PB Americas, Inc. will continue with in-depth fracture critical inspection of the I-90 (Dresbach) over the Mississippi River September 17-21, 2007.
  • PB Americas, Inc. will perform in-depth inspection of Lowery Avenue bridge over the Mississippi River beginning September 17, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspection of Br. 5610; T.H. 1 over the Kawishiwi River on September 13 and 14, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007.
  • PB Americas, Inc. will be finalizing in-depth fracture critical inspection of the Blatnik Bridge on I-535 in Duluth the week of September 25. 2007.

Sept, 5, 2007

What is complete

  • 87 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1878 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 103 of 127 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 192 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 23 of these bridges have been reported to be replaced this year.

What is underway

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007. The work at T.H. 52 is expected to be completed by September 12, 2007. The work at I-90 will be complete this Friday and resume September 17-21, 2007.
  • Br. 6748; T.H. 23 over the Mississippi River in St. Cloud will have continued routine inspection of the deck and lubrication system today.
  • Br. 27867 and Br. 27869; I-35 over the CP rail and EB 28th Street East over I-35 will be inspected today in Hennepin County.

What is Planned

  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspection of Br. 5610; T.H. 1 over the Kawishiwi River on September 13 and 14, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007.

Sept. 4, 2007

What is complete

  • 85 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1657 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 102 of 127 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 192 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 23 of these bridges have been reported to be replaced this year..

What is underway

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007. The work at T.H. 52 is expected to be completed by September 12, 2007. The work at I-90 will be complete this Friday and resume September 17-21, 2007.
  • Br. 3622; T.H. 12 near Delano, Br. 9075 and 9173 on T.H. 95 near Cambridge will have routine inspections completed today.
  • Br. 9621; WB East 35th Street over I-35W and Br. 9731; I-35W over East 31st Street will be inspected today in Hennepin County
  • Mn/DOT inspection teams will be inspecting Br. 7122 and L2146; CR 8 and CR 16 over the Rock River today in Rock County. These bridges have pin and hanger assemblies that will be inspected.

What is Planned

  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspection of Br. 5610; T.H. 1 over the Kawishiwi River on September 13 and 14, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007.

Aug 31, 2007

What is complete

  • 81 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007. 13 of these inspections were reported to be completed this week.
  • At least 1647 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007. 394 of these inspections were reported to be completed this week.
  • At least 102 of 127 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007. 27 of these inspections were reported to be completed this week.
  • At least 192 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 23 of these bridges have been reported to be replaced this year. 108 of these inspections were reported to be completed this week.
  • Lac Qui Parle County has completed their structurally deficient bridge inspections as of August 28, 2007.
  • Mn/DOT completed an in-depth fracture critical inspection on the CSAH 37 Bridge in Wang Township of Renville County.

What is underway

  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
    Br 9387; Dale Street over I-94, Br. 9737; Pedestrian bridge at Mackubin Street over I-94 in Ramsey County will be inspected today.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007. This work is expected to be completed by September 12, 2007
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspection of Br. 5610; T.H. 1 over the Kawishiwi River on September 13 and 14, 2007.
    PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007.

Aug. 30, 2007

What is complete

  • 78 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1611 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 98 of 127 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007
  • At least 187 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 23 of these bridges have been reported to be replaced this year.
  • St Louis County in District 1, has reported that 54 of 57 structurally deficient bridges have been inspected as of August 29, 2007.
  • Benton County in District 3 has reported that all 5 structurally deficient bridges have been inspected as of August 29, 2007.

What is underway

  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
  • Wisconsin DOT is performing in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth. This week the work will be in the westbound lanes. The work is expected to be completed today.
  • Bridges on T.H. 6, 200 and 169 will be inspected in Aitkin, Cass and Crow Wing Counties this week.
  • Bridges along I-94 in Stearns County will be inspected this week.
  • Bridges on T.H. 14, 19 and 22 in District 7 will be inspected this week.
  • Br. 9040: T.H. 63 over the Mississippi River at Redwing will have an in-depth fracture critical inspection that is expected to be completed today.
  • Br: 92808; I-94 WB over T.H. 280 off ramps, Br. 92812; I-94 WB over T.H. 280 SB, Br. 92814; CP Rail over I-94 EB on ramp in Ramsey County will be inspected today.
  • Br. 08010; T.H. 15 over Cottonwood River in Brown County will be inspected today.
  • Br. 6690; T.H. 11 over the Red River of the North will continue to be inspected today.
  • Br. 09801; T.H. 33 NB over I-35 will be inspected today near Cloquet.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007. This work is expected to be completed by September 12, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 11, 2007

Aug. 29, 2007

What is complete

  • 76 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1561 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 95 of 127 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 128 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 23 of these bridges have been reported to be replaced this year.

What is underway

  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
  • Wisconsin DOT is performing in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth. This week the work will be in the westbound lanes. The work is expected to be completed on or before August 30, 2007.
  • Bridges on T.H. 6, 200 and 169 will be inspected in Aitkin, Cass and Crow Wing Counties this week.
  • Bridges along I-94 in Stearns County will be inspected this week.
  • Bridges on T.H. 13, 22, 60, 109, and 169 in District 7 will be inspected this week.
  • Br. 9040: T.H. 63 over the Mississippi River at Redwing will have an in-depth fracture critical inspection that is expected to be complete on August 30, 2007.
  • Br. 9114; T.H. 7 over the Chippewa River in Chippewa County will be inspected today in District 8.
  • Br. 4667; T.H. 19 near Morton will have an in-depth fracture critical inspection today.
  • Br. 9090; T.H. 2 over the Red River in East Grand Forks will be inspected today.
  • Bridges on T.H. 72, 172 and 11 will be inspected today in Lake of the Woods County.
  • Br. 9041; West 90th Street over I-35W and Br. 9039; West 86th Street over I-35W will be inspected today in Hennepin County.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007. This work is expected to be completed by September 12, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspection of Br. 5610; T.H. 1 over the Kawishiwi River on September 13 and 14, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 17, 2007.

Aug. 28, 2007

What is complete

  • 73 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1474 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 97 of 127 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 123 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 23 of these bridges have been reported to be replaced this year.
  • Hubbard, Kittson, and Norman Counties in District 2, have completed inspection of all structurally deficient bridges as of August 24th, 2007.
    Hennepin County, Metro, Bridge 90596 was inspected 6/19/07, no critical deficiencies found.
  • Douglas, Grant, Pope, Traverse, Big Stone, Stevens and Wilken Counties in District 4, have completed inspection of all structurally deficient bridges as of August 24th, 2007.
  • Morrison County has completed their structurally deficient bridge inspections as of August 24, 2007. One township bridge was closed due to continued deterioration last week. The ADT on this bridge was 1. This bridge is located on the Pierz/Hillman township line.

What is underway

  • Due to significant flooding in Houston, Filmore and Winona Counties several brides have been damaged. Bridge 6895 on Hwy 76 south of I-90 and three local bridges are out of service due to flooding damage. Additionally, 5 Trunk Highway bridges and 10 box culvert bridges have had significant scour damage that will need to be repaired. Br. 85016; T.H. 61 in Minnesota City has been load restricted due to damage. There are also many bridges and box culverts that are in need of debris removal due to the flooding.
  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
  • Wisconsin DOT is performing in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth. This week the work will be in the westbound lanes. The work is expected to be completed on or before August 30, 2007.
  • Bridges on T.H. 6, 200 and 169 will be inspected in Aitkin, Cass and Crow Wing Counties this week.
  • Bridges along I-94 in Stearns County will be inspected this week.
  • Br. 09823; I-35 over C.S.A.H. 61 near Carlton will be inspected today.
  • Bridges on T.H. 171, 175, and 59 in Kittson County and bridges on T.H. 72 in Beltrami and Lake of the Woods County will be inspected today in District 2.
  • Bridge 5380: T.H. 40 over Lac Qui Parle Lake will be inspected today.
  • Br. 07011; T.H. 14 over the Minnesota River will be inspected today.
  • Bridges on T.H. 13, 22, 60, 109, and 169 in District 7 will be inspected this week.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007. This work is expected to be completed by September 12, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
    PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 11, 2007.

Aug. 27, 2007

What is complete

  • 74 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1434 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 95 of 127 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 84 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 23 of these bridges have been reported to be replaced this year.
  • Br. 6690; T.H. 11 between Robbin, MN and Drayton, ND over the Red River was closed on Tuesday August 21, 2007 due propagation of a crack in a support bracket. Repairs were completed on August 24, 2007 and the bridge was opened to traffic on August 25, 2007.

What is underway

  • Due to significant flooding in Houston, Filmore and Winona Counties several brides have been damaged. Bridge 6895 on Hwy 76 south of I-90 and three local bridges are out of service due to flooding damage. Additionally, 5 Trunk Highway bridges and 10 box culvert bridges have had significant scour damage that will need to be repaired. Br. 85016; T.H. 61 in Minnesota City has been load restricted due to damage. There are also many bridges and box culverts that are in need of debris removal due to the flooding.
  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
  • Wisconsin DOT is performing in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth. This week the work will be in the westbound lanes. The work is expected to be completed on or before August 30, 2007.
  • Bridges on T.H. 6, 200 and 169 will be inspected in Aitkin, Cass and Crow Wing Counties this week.
    Bridges on T.H. 171, 175, and 59 in Kittson County will be inspected today.
  • Bridges along I-94 in Stearns County will be inspected this week.
  • Bridges along T.H. 2, 71 and 197 in Beltrami County near Bemidji will be inspected today..

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • PB Americas, Inc. will be performing in-depth fracture critical inspections on I-35 near Duluth beginning September 11, 2007.

Aug 24, 2007

What is complete

  • 68 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007. 23 in-depth inspections were completed this week.
  • At least 1253 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007. 353 routine inspections were completed this week.
  • At least 75 of 106 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007. 28 structurally deficient bridges were inspected this week.
  • At least 84 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 23 of these bridges have been reported to be replaced this year.
  • Br. 6690; T.H. 11 between Robbin, MN and Drayton, ND over the Red River was closed on Tuesday August 21, 2007 due propagation of a crack in a support bracket. A repair plan has been made and repairs are about ½ complete as of 10:00 a.m. today. The road should be reopened to traffic sometime this weekend.
  • The City of Duluth has completed inspection of all structurally deficient bridges as of August 23, 2007.

What is underway

  • Due to significant flooding in Houston, Filmore and Winona Counties several brides have been damaged. Bridge 6895 on Hwy 76 south of I-90 and three local bridges are out of service due to flooding damage. Additionally, 5 Trunk Highway bridges and 10 box culvert bridges have had significant scour damage that will need to be repaired. Br. 85016; T.H. 61 in Minnesota City has been load restricted due to damage. There are also many bridges and box culverts that are in need of debris removal due to the flooding.
  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
  • Wisconsin DOT is performing in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth. This work is expected to be completed on August 31, 2007.
  • Bridge 49004; Ramp to WB TH 10 over TH 10, near Little Falls. Today District 3 Maintenance will be repairing a beam damaged by an over height load. The damage was found yesterday during inspection of the bridge. The bridge is open to traffic

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.

Aug. 23, 2007

What is complete

  • 64 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1217 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 75 of 106 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 83 of approximately 900 local bridges classified as structurally deficient have been reported as inspected. An additional 23 of these bridges have been reported to be replaced this year.
  • Br. 6690; T.H. 11 between Robbin, MN and Drayton, ND over the Red River was closed due propagation of a crack in a support bracket. A repair plan has been made and repairs will be complete within the next week.
  • Todd, Wright, and Crow Wing Counties in District 3, have completed inspection of all structurally deficient bridges as of August 20th, 2007.
  • Morrison County in District 3, has completed inspection of 70% of their structurally deficient bridges. Their 2007 inspections are scheduled to be 100% complete by the end of next week.
  • Norman County, District 2, replaced a SD bridge on CSAH 39 over the Wild Rice River this year.

What is underway

  • Significant flooding in Houston, Filmore and Winona Counties has affected the schedule for routine and in-depth fracture critical bridge inspections in that area. Mn/DOT bridge inspectors are performing special inspections of all bridges for flood damage. At least on T.H. bridge (Bridge 6895 on Hwy 76 south of I-90) and three local bridges are out of service due to flooding damage. Additionally, 5 Trunk Highway bridges and 10 box culvert bridges have had significant scour damage that will need to be repaired. Br. 85016; T.H. 61 in Minnesota City has been load restricted due to damage. There are also many bridges and box culverts that are in need of debris removal due to the flooding.
  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
  • Wisconsin DOT is performing in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth. This work is expected to be completed on August 31, 2007.
    Additional Mn/DOT 2-person inspection teams using a variety of access equipment are scheduled to inspect numerous bridges today. Some of the notable bridges to be inspected include:
    • Inspections teams will be inspecting bridges on T.H. 5, 15, 22, 60 and 109 today in the Mankato/Windom area.
    • Inspection teams will be inspecting bridges located along T.H. 10 and I-94 in west central Minnesota.
    • Inspection teams will be inspecting bridges on T.H. 2, 6 and 46 in Itasca County.
    • Br. 9100; T.H. 1 will receive an in-depth fracture critical inspection today.
    • Br. 27552: 106th Street over Nine Mile Creek in the City of Bloomington will receive an in-depth fracture critical inspection.
    • Br. 5388; T.H. 24 over the North Fork of the Crow River will be inspected. This bridge is classified as structurally deficient.
    • Br. 87021; U.S. 212 over the Minnesota River in Yellow Medicine County.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.

Aug. 22, 2007

What is complete

  • 59 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1156 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 73 of 106 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 68 of approximately 900 local bridges classified as structurally deficient have been inspected. Many of these bridges have been reported to be replaced this year.
  • Pipestone County has reported that all 36 structurally deficient bridges have been inspected as of August 20, 2007.
  • Br. 6690; T.H. 11 between Robbin, MN and Drayton, ND over the Red River was closed due propagation of a crack in a support bracket. A repair plan has been made and repairs will be complete within the next week

What is underway

  • Significant flooding in Houston, Filmore and Winona Counties has affected the schedule for routine and in-depth fracture critical bridge inspections in that area. Mn/DOT bridge inspectors are performing special inspections of all bridges for flood damage. At least on T.H. bridge (Bridge 6895 on Hwy 76 south of I-90) and three local bridges are out of service due to flooding damage.
  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
  • Wisconsin DOT is performing in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth. This work is expected to be completed on August 31, 2007.
  • Additional Mn/DOT 2-person inspection teams using a variety of access equipment are scheduled to inspect numerous bridges today. Some of the notable bridges to be inspected include:
    • Inspections teams will be inspecting bridges on I-90, T.H. 169, T.H. 15, T.H. 109 and T.H. 19 this week in the Mankato area.
    • This week, two inspection teams from Detroit Lakes, Mn/DOT District 4, will be inspecting bridges located along T.H. 10 and I-94 in west central Minnesota.
    • Inspection teams will be inspecting bridges on T.H. 11 in Marshall County in northwestern Minnesota.
    • Br. 5817; T.H. 317 will receive an in-depth fracture critical inspection..

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007. Polk County has scheduled inspection of their structurally deficient bridges for the next two weeks.
  • Scott County, Metro, has completed the inspections of all Scott County structurally deficient local bridges. The last inspection was completed on July 27, 2007. They monitor their structurally deficient bridges every 3 months.
  • Kittson and Hubbard counties are planning to do inspect structurally deficient bridges in the next few weeks.

Aug. 21, 2007

What is complete

  • 57 of approximately 250 in-depth fracture critical and special inspections have been completed this year. The goal for completing fracture critical inspections is 15 per week and having all field work completed by December 1, 2007.
  • At least 1089 of approximately 3,800 routine Trunk Highway bridge inspections have been completed this year. The goal for completing routine bridge inspections is 200 per week and having all field work completed by December 1, 2007.
  • At least 72 of 106 bridges classified as structurally deficient have been inspected this year. The goal for inspection of structurally deficient bridges is 10 per week and having field work completed by October 1, 2007.
  • At least 33 of approximately 900 local bridges classified as structurally deficient have been inspected.
  • Local agencies have been reporting that numerous structurally deficient bridges are being replaced this year. In Northwestern Minnesota, 14 of these bridges have been replaced.

What is underway

  • Significant flooding in Houston, Filmore and Winona Counties has affected the schedule for routine and in-depth fracture critical bridge inspections in that area. Mn/DOT bridge inspectors are performing special inspections of all bridges for flood damage.
  • Bridge 6895 has been washed out on Hwy 76 south of I-90 (2 approaches).
  • Bridge 5797 on Old Highway 61 in MN City has approaches washed out and has been damaged.
  • One new bridge in Whitewater State Park is standing but the road approaching it on the north side of the park has been washed out.
  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
  • Wisconsin DOT is performing in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth. This work is expected to be completed on August 31, 2007.
  • Additional Mn/DOT 2-person inspection teams using a variety of access equipment are scheduled to inspect numerous bridges today. Some of the notable bridges to be inspected include:
    • Inspections teams will be inspecting bridges on I-90, T.H. 169, T.H. 15 and T.H. 19 this week in the Mankato area.
    • This week, two inspection teams from Detroit Lakes, Mn/DOT District 4, will be inspecting bridges located along T.H. 10 and I-94 in west central Minnesota.
    • Br. 27549; 42nd Avenue over the Mississippi River in Minneapolis will receive an in-depth fracture critical inspection by Mn/DOT inspection team.
    • Br. 6690; T.H. 11 over the Red River near Drayton on the North Dakota border will be receive an in-depth fracture critical inspection today.
    • Br. 9784: I-35 over the St. Croix Valley Railroad will be inspected today in Pine County. This bridge is classified as functionally obsolete.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007. Polk County has scheduled inspection of their structurally deficient bridges for the next two weeks.
  • Scott County, Metro, has completed the inspections of all Scott County structurally deficient local bridges. The last inspection was completed on July 27, 2007. They monitor their structurally deficient bridges every 3 months.
  • Kittson and Hubbard counties are planning to do inspect structurally deficient bridges in the next few weeks.

Aug. 20, 2007

What is complete

  • 45 of approximately 250 in-depth fracture critical and special inspections have been completed this year.
  • At least 986 of approximately 3,600 routine Trunk Highway bridge inspections have been completed this year.
  • At least 57 of 106 bridges classified as structurally deficient have been inspected this year.
  • At least 28 of approximately 900 local bridges classified as structurally deficient have been inspected. Some of the notable reports include:
    • Polk County has scheduled inspection of their structurally deficient bridges for the next two weeks.

What is underway

  • Portions of Trunk Highways and most local roads are closed due to significant flooding in Houston, Filmore and Winona Counties.
    • Bridge 6895 has been washed out on Hwy 76 south of I-90 (2 approaches).
    • Bridge 5797 on Old Highway 61 in MN City has approaches washed out and has been damaged.
    • One new bridge in Whitewater State Park is standing but the road approaching it on the north side of the park has been washed out.
  • Three two-person Baker Engineering bridge inspection teams, working as a sub-consultant to PB Americas, Inc. are performing in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River. This work is expected to be finished around August 31, 2007.
  • Additional Mn/DOT 2-person inspection teams using a variety of access equipment are scheduled to inspect numerous bridges today. Some of the notable bridges to be inspected include
    • Br. 6962: T.H. 68 over a ditch in Redwood County. This bridge is classified as structurally deficient.
    • Inspections teams will be inspecting bridges on I-90, T.H. 169, T.H. 15 and T.H. 19 this week in the Mankato area.
      Bridges in Southeast Minnesota are being assessed for flood damage in during the next two days.
    • Br. 58806: Pine County 14 over I-35.
    • Bridges in Marshall County along T.H. 220 and in Hubbard County near Park Rapids will be inspected today by District 2 inspection personnel.
    • This week, two inspection teams from Detroit Lakes, Mn/DOT District 4, will be inspecting bridges located along T.H. 10 and I-94 in west central Minnesota.
  • Local Agency personnel have been encouraged to also inspect structurally deficient bridges expeditiously.
    Wisconsin DOT is performing in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth. This work is expected to be completed on August 31, 2007.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.

Aug. 17, 2007

What is complete

  • 45 of approximately 250 in-depth fracture critical and special inspections have been completed this year.
  • At least 900 of approximately 3,600 routine Trunk Highway bridge inspections have been completed this year.
  • At least 47 of 106 bridges classified as structurally deficient have been inspected this year.
  • The City of Minneapolis has inspected 13 of 17 bridges classified as structurally deficient.
  • City of Hibbing has inspected all 4 structurally deficient bridges this year. During the inspections, no significant changes were noted.
  • City of Duluth has demolished 2 of 3 structurally deficient bridges; the remaining bridge is scheduled for inspection for August 23, 2007.
  • Kittson County has recently inspected 3 of 4 structurally deficient bridges. The remaining structurally deficient bridge is a dam and is scheduled for inspection soon. The county is responsible for the deck inspection and the DNR is responsible for the substructure.
  • City of Savage has replaced their structurally deficient bridge in the fall of 2006.

What is underway

  • Three two-person PB Americas, Inc. bridge inspection teams performing in-depth fracture critical and routine inspection.
    • I-535 (Blatnik) over the St. Louis River in Duluth. This work will be complete today.

  • Additional Mn/DOT 2-person inspection teams using a variety of access equipment are scheduled to inspect numerous bridges today. Some of the notable bridges to be inspected include:
    • Br. 9096: I 35E NB OFF Ramp over I 35E SB to 694W. This bridge is classified as structurally deficient.
    • Br. 9010: T.H. 41 over the Minnesota River. This bridge is classified as structurally deficient.
    • There are inspections planned for today on T.H. 219 and T.H. 89 in Marshall County.
    • Br. 04001: T.H. 1 overflow channel to the Red Lake River in Beltrami County.

  • Local Agency personnel have been encouraged to also inspect structurally deficient bridges expeditiously.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River will begin on August 20 and in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • Wisconsin DOT will perform in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth beginning on August 20, 2007.

Aug. 16, 2007

What is complete

  • At least 45 of approximately 250 fracture critical and special in-depth inspections have been completed this year
  • At least 897 of approximately 3,600 routine Trunk Highway Bridge inspections have been completed this year
  • At least 45 of 106 structurally deficient bridges have been inspected
  • Influx of local agencies reporting status of structurally deficient bridge inspections
  • District State Aid Engineers requested and received list of the local fracture critical bridges to help coordinate the effort with local agencies
  • Chippewa County, District 8, all of their 10 structurally deficient bridges have been inspected this year. There were no changes to the NBI ratings from 2006
  • City of Orono, Metro, their 2 structurally deficient bridges have been demolished, replacement bridges are currently being constructed
  • Mahnomen County, District 4, Fracture Critical Bridge L6617 is under contract to be replaced, new bridge construction will start in September 2007
  • Koochiching County, District 1, their 1 structurally deficient bridge was replaced this summer 2007.

What is underway

  • Three two-person PB Americas, Inc. bridge inspection teams performing in-depth fracture critical and routine inspection.
    I-535 (Blatnik) over the St. Louis River in Duluth. This bridge is considered fracture critical and will be completed by August 25, 2007.
  • 22 additional Mn/DOT 2-person inspection teams using a variety of access equipment to inspect at least 34 bridges this week. Some of the notable bridges to be inspected include:
    • Br. 5983: I-35W over Minnesota River. This bridge is considered fracture critical. This work is expected to be completed today.
    • Br. 62026: T.H. 52 over Eaton Street. This bridge is classified as structurally deficient
    • Br. 6288: T.H. 61 over BNSF RR in White Bear Lake. This bridge is classified as structurally deficient
    • Br. 15002: T.H. 200 over the Mississippi River and numerous bridges in the Park Rapids area on Thursday and Friday
    • Br. 35005: T.H. 175 and Br. 5872 T.H. 317 over the Red River
    • Br. 5462: T.H. 7 over T.H. 100. This bridge is classified as structurally deficient
    • Br. 6770 and Br. 6771: T.H. 70 over Cannon River. These bridges are classified as structurally deficient. Both of these bridges are in the Rochester District
    • Br. 9098: T.H. 169 over the Minnesota River and Br. 9294: T.H. 14 over MSAS 111. These bridges are classified as functionally obsolete. Both of these bridges are in the Mankato District
    • There are several bridges being inspected today on T.H. 68, 23 and 91 in the Windom area.
      Br. 9021 and 9022: T.H. 23 EB and WB over T.H. 10 in St. Cloud.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River will begin on August 20 and in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River and I-90 (Dresbach) over the Mississippi River beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 24, 2007.
  • Wisconsin DOT will perform in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth beginning on August 20, 2007

Aug. 15, 2006

What is complete

  • 43 of 217 fracture critical in-depth inspections have been completed this year.
  • At least 830 of 3,419 routine Trunk Highway Bridge inspections have been completed this year

What is underway

  • Three two-person PB Americas, Inc. bridge inspection teams performing in-depth fracture critical and routine inspection.
    • I-535 (Blatnik) over the St. Louis River in Duluth.
  • 22 additional Mn/DOT 2-person inspection teams using a variety of access equipment to inspect at least 34 bridges this week.  Some of the notable bridges to be inspected include:
    • Br. 5983: I-35W over Minnesota River.  This bridge is considered fracture critical.
    • Br. 9086: T.H. 23 over 10th Avenue in St. Cloud.  This bridge is classified as structurally deficient.
    • Br. 6748: T.H. 23 over the Mississippi River in St. Cloud.  This bridge is considered fracture critical.
    •  Br. 58803: I-35 S.B. over Snake River near Pine City.
    • Br. 91049: T.H. 169 over Ripple River.  This bridge is classified as structurally deficient.
    • Br. 6657: T.H. 169 over Rum River.
    • Br. 23004: T.H. 43 over South Fork of Root River.  This bridge is fracture critical.
    • Br. 9003: T.H. 76 over Root River.  This bridge has special feature called pin and hanger.
    • Br. 35007:  T.H. 171 over Red River.  This bridge is classified as structurally deficient.
    • Br. 35005: T.H. 175 over Red River.
    • Br. 53819: I-90 westbound over T.H. 60.
    • Br. 53820: I-90 eastbound over T.H. 60
      .
  • Local Agency personnel have been encouraged to also inspect structurally deficient Bridges expeditiously.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River will begin on August 20 and in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River will beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 4, 2007.
  • Wisconsin DOT will perform in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth beginning on August 20, 2007.

Aug. 14, 2007

What is complete

What is underway

  • In-depth fracture critical and routine inspections using underbody bridge inspection vehicles.

    • I-35W over the Minnesota River in the Metro District.
    • Various Bridges in Mankato District.
    • Various Bridges in the Rochester District.
    • Various Bridges in the Willmar District.
    • I-535 (Blatnik) over the St. Louis River in Duluth.

  • 18 additional Mn/DOT inspection teams scheduled to perform at least 34 routine inspections on trunk highway bridges.
  • Local agency personnel have been encouraged to also inspect structurally deficient Bridges expeditiously.

What is Planned

  • PB Americas, Inc. will perform in-depth fracture critical and routine inspection of the T.H. 61 (Hastings) over the Mississippi River will begin on August 20 and in-depth fracture critical inspection of the T.H. 52 (Lafayette) over the Mississippi River will beginning on September 4, 2007.
  • Ontario Ministry of Transportation will be performing in-depth fracture critical inspection of the Rainy River Bridge between Baudette and Rainy River beginning on September 4, 2007.
  • Wisconsin DOT will perform in-depth fracture critical and routine inspection of the T.H. 2 Bong Bridge over the St. Louis River in Duluth beginning on August 20, 2007.

 