Minnesota Department of Transportation Go to 511
MnDOT A to Z | General Contacts | Simple Search | Advanced Search

Interstate 35W Bridge: Original Plans & Details
Mississippi River Crossing in downtown Minneapolis

I-35W Bridge Collapse New I-35W Bridge Original Plans I-35W Bridge Inspections, Reports and Contracts Statewide Bridge Inspections Contact Us

Anti-Icing system

Plans and details for Bridge 9340


Recent work on the bridge

Recent work on the I-35W bridge over the Mississippi (bridge 9340) was part of a larger contract with Progressive Contractors Inc. for work on I-35W between I-94 and Stinson Blvd.

• Work was scheduled to be complete Sept. 30
• Cost for the work is $9 million

Bid Advertisement, April 27, 2007. Includes S.P. 2783-107 work on I-35W from North of I-94 to Stinson Boulevard in Minneapolis.

BR9340 Reconstruction Plan (2007) ( 5.69 mb PDF)

Approved Contract
Pages 1-100 (3,803kb PDF)
Pages 101-200 (6,366kb PDF)
Pages 201-300 (4,898kb PDF)
Pages 301-400 (5,839kb PDF)
Pages 401-501 (4,870kb PDF)

Go to Top

''
''
blank