Minnesota Department of Transportation home page
Home | About Mn/DOT | Doing Business | Getting Around |
511 Traveler Information
Mn/DOT A to Z | Contact | Simple Search | Advanced Search | Go search

Interstate 35W Bridge: Original Plans & Details
Mississippi River Crossing in downtown Minneapolis

I-35W Bridge Collapse New I-35W Bridge Original Plans I-35W Bridge Inspections, Reports and Contracts Statewide Bridge Inspections Contact Us

Anti-Icing system

Plans and details for Bridge 9340


Recent work on the bridge

Recent work on the I-35W bridge over the Mississippi (bridge 9340) was part of a larger contract with Progressive Contractors Inc. for work on I-35W between I-94 and Stinson Blvd.

• Work was scheduled to be complete Sept. 30
• Cost for the work is $9 million

Bid Advertisement, April 27, 2007. Includes S.P. 2783-107 work on I-35W from North of I-94 to Stinson Boulevard in Minneapolis.

BR9340 Reconstruction Plan (2007) ( 5.69 mb PDF)

Approved Contract
Pages 1-100 (3,803kb PDF)
Pages 101-200 (6,366kb PDF)
Pages 201-300 (4,898kb PDF)
Pages 301-400 (5,839kb PDF)
Pages 401-501 (4,870kb PDF)

Go to Top

''
''
blank

© 2000-2010 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Mozilla Firefox 2, Safari 3 or Internet Explorer 6 or greater.

A to Z | Getting Around | About Mn/DOT | ADA and Accessibility | Disclaimer and Legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs | Northstar | Governor's Site |