Project Benefits
- Lateral guidance for snowplows, ambulances, and state patrol during white out conditions
Project Team
- Mn/DOT
- USDOT
- U of M, Center for Transportation Studies
- 3M
- Altra Technologies, Inc.
- Minnesota State Patrol
- Hutchinson Area Health Care
- McLeod County
- Navistar
Project Documents
- Detailed Design TH 7 IVI Specialty Vehicle Field Operational Test (August 2001)
- Validation Report TH 7 IVI Specialty Vehicle Field Operational Test (July 2002)
- Phase 2 No Snow Presentation for TH 7 IVI Winter 2002-2003
- Final Human Factors Report TH 7 IVI Winter of 2001-2002 (July 2002)
- Final Benefits Study Report TH 7 IVI Winter of 2001-2002 (December 2002)
- Phase 2 Evaluation Plan TH 7 IVI Winter of 2002-2003 (July 2002)
- Phase 2 No Snow Proposal TH 7 IVI Winter of 2002-2003
- Phase 2 Supplemental Track Test Evaluation, Final Draft (December 2003)
- Phase 2 System Performance and Human Factors Evaluation, Final Draft (December 2003)
Intelligent Vehicle Initiative (IVI) - Highway 7 Operational Test |
|
Project Description
|


