New construction of a 4-lane freeway in the City of Maple Grove Minnesota. The project extends from County Road 81 to TH 169. Project includes grading, drainage, bridges, noise walls, retaining walls.
Estimated Cost: $60 to $80 million
Hwy 2 in Beltrami County (Mn/DOT District 2)
Replacement of two bridges with a box culvert 0.4 miles west of TH 89. The project includes bridge demolition, box culvert construction, grading, paving.
Estimated Cost: $2.5 to $3.5 million
I-90 - Bridges of Mower County
The project consists of replacement of an existing local street flyover Bridge (No. 9176), replacement of the Dobbins Creek Bridge (No. 8929) and replacement of the Turtle Creek Bridges (Nos. 6807 and 6808).
Estimated Cost: $12 to $18 million
Hwy 169 in St. Peter, Nicollet County (Mn/DOT District 7)
Reconstruction of Hwy 169 through the City of St Peter. The project includes grading, drainage, utilities, paving, and landscaping.