Quick Links
- Bid Letting
- Contracting tools
(A+B Bidding, Incentives, Warranties, etc.) - Federal Highway Administration
More Links
Proposals, Clarifications, Information
Project Status
- Completed in 2007
Bid results
- Bid Award Score Summary (608kb PDF)
Form 14 Proposal Price Forms
- Ames-Kramer (144kb PDF)
- C.S. McCrossan (145kb PDF)
- Linda-Hoffman-Shafer (75kb PDF)
Conformed RFP (zip files)
RFP Clarifications and addenda
- #10, Aug. 25, 2005 (57kb PDF)
- #9, Aug. 23, 2005 (22kb PDF)
- #8, Aug 18, 2005 (31kb PDF)
- #7, Aug. 12, 2005 (41kb PDF)
- #6, Aug. 4, 2005 (23kb PDF)
- #5, July 22, 2005 (42kb PDF)
- #4, June 24, 2005 (46kb PDF)
- #3, June 17, 2005 (55kb PDF)
- #2, June 10, 2005 (41kb PDF)
- #1, June 9, 2005 (40kb PDF)
- RFP Addenda (22kb PDF)
Additional information
- Short-listed teams, May 25, 2005 (15kb PDF)
- Request for Qualifications, March 18, 2005 (198kb PDF)
- Project Information Workshop Attendance Record (73kb PDF)
- Project Information Workshop Powerpoint Presentation (483kb PDF)
RFQ Clarifications
- #3, April 18, 2005 (26kb PDF)
- #2, March 31, 2005 (22kb PDF)
- #1, March 28, 2005 (27kb PDF)
RFQ Addenda
- RFQ Addendum #3, April 22, 2005 (112kb PDF)
- RFQ Addendum #2, April 8, 2005 (112kb PDF)
- RFQ Addendum #1 April 4, 2005 (414kb PDF)
About the Hwy 52/Oronoco project
Mn/DOT - District 6 (Rochester/Owatonna/Winona)
State Project Number: 5508-84
Project Web site: http://projects.dot.state.mn.us/oronoco52/
Location
- Hwy 52 segment located in Olmsted County
- Starts near junction of 85th Street and continues northerly to the 59th Avenue intersection in Oronoco
- Hwy 52 between Rochester and the Twin Cities is classified as a high-priority interregional corridor
Project Cost
- $37 million
Background
-
This segment of Hwy 52 features several at-grade intersections.
-
Heavy traffic volumes and high speeds make it difficult for traffic to safely access the highway from local cross streets and public roads.
-
A December, 2000 Road Safety Audit revealed that the County Road 12(N) intersection in Oronoco had an accident rate twice as high as the statewide average for similar intersections.
-
Additionally, the existing northbound Hwy 52 bridges over Lake Shady qualify for replacement based on age, condition, bridge sufficiency ratings, substandard hydraulic capacity and substandard width.
Project Description
-
This project, completed with a single design-build contract includes improvements:
- Diamond interchange at County Road 112/ 12 (S)
- Overpass at County Road 12 (N)
- New mainline bridges over Lake Shady
- Frontage road construction to facilitate access to local roads
- Access control measures to improve safety.
Benefits
- The proposed project provides safer and more efficient traffic operations on Hwy 52 and the adjoining county/local road system.
Contact
Jai Kalsy, P.E.
Design-build Project Coordinator

