Jump to main content.
Minnesota Department of Transportation Go to 511
MnDOT A to Z | General Contacts | Simple Search | Advanced Search
Design-build
 

TH5 Mississippi River Bridge Redeck

Details about MnDOT's Design-build project over the Mississippi River vicinty of Fort Snelling
Design-build Home | Stimulus Design-build Projects | Contact Us
 

Quick Links

More Links

 

*THE REQUEST FOR QUALIFICATIONS ON THIS PROJECT HAS BEEN CANCELLED; THE PROJECT IS UNDERGOING RESCOPING.  MNDOT DOES NOT ANTICIPATE THAT THE PROJECT WILL BE DELIVERED USING DESIGN BUILD IN THE FUTURE.  THANK YOU FOR YOUR INTEREST.*

 

Project Information

Project Purpose

 

This project proposes to redeck the T.H. 5 river bridge over the Mississippi River near Fort Snelling.  The project will also involve concrete pavement repair (CPR) on T.H. 5 and maintenance activities on the Shepard Road and Edgecumbe Road bridges.  It is anticipated that the river bridge will need to be redecked using top-down construction methods. 

 

This project will most likely be a two-step low-bid project that utilizes stipends.

 

 

 

Contact

Michael Beer, P.E.

michael.beer@state.mn.us